Presentation is loading. Please wait.

Presentation is loading. Please wait.

PCS Statistics and main development’s history 2017

Similar presentations


Presentation on theme: "PCS Statistics and main development’s history 2017"— Presentation transcript:

1 PCS Statistics and main development’s history 2017
PCS Day 2017

2 PCS Statistics

3 Detailed Information available in CMS
PCS Changes / Fixes in 2017 Detailed Information available in CMS

4 PCS tickets Nov to Oct. 2017 Total: 615 tickets

5 Loco types C-OSS Pre-booking PAMT Conflict Solving Tool Notifications
Main Developments 2017 Loco types C-OSS Pre-booking PAMT Conflict Solving Tool Notifications

6 C-OSS developments Pre-booking and C-OSS TT
Open Harmonisation Path Request Pre-booking Path Elaboration RU TT C-OSS TT IM TT Copy by PCS Copy by PCS Acceptance indicator separation One light for the IM One light for the C-OSS C-OSS light is blue (!) in Path Elaboration → Automatic Draft Offer promotion is blocked until they change First Pre-booking phase: new phase after the RU submits path request with a PaP dossier. In this phase RU has read-only access to the dossier and RU TT. IM has read-only access on the full dossier. C-OSS can edit the dossier and make PaP reservation. Then in Path Elaboration IM has the same access today. C-OSS TT will remain and will show always the result of pre-booking. It’s visible only on the GUI, in the schema it’s not there yet, but longterm that’s the plan. Then the timetables. We copy first the RU TT to the C-OSS TT when the RU submits path request. Later when C-OSS promotes the dossier to Path Elaboration (for timetable) we copy the C-OSS timetable to the IM timetable. Acceptance indicator separation: basically it’s clear, but the benefit is that everybody can search free only on their dossiers. Before Ims received wrong results because of the „on behalf” C-OSS lights. Important thing is the last bullet point that C-OSS light goes blue when they promote to Path Elaboration. It means they have to check the IM timetable when it’s ready and set a green light, otherwise the automatic promotion won’t work. What’s the benefit of these? Much clearer responsibilities. Clear separation of tasks and responsibilities 19 September 2018

7 C-OSS developments New report for KPI calculation
PAMT (PaP Availability Management Tool) search & report Requests (statuses) Distances Circulation day and whole year calendar K value calculations New window for conflict solving CST (Conflict Solving Tool) view Every request belonging to one PaP ID Direct PaP request handling K value presentation PaP Distance NetPaP Distance Running days PAMT search and report: They can search by request status, pap id, corridor, pap type so they can use the search already for having overview about the requests Then a report could be also generated that has much more information with the distances, 364 days calendar, K values. This is now used by them for KPI calculation CST: I’ve added a mock-up just to have some idea how it looks like. Basically it provides a good overview about the dossiers that requested the same PaP ID. You can see there all the info I wrote on the slide, so you can decide the conflict decision right there and can reserve immediately without going anywhere else. 19 September 2018

8 Loco Types Identification: PCS ID, Loco type number, National ID
Attributes: Type Top speed (km/h) Weight (t) Length (m) Train control system Related performance (kW) Information: TT period, IM, Explanation Be patient! Who uploaded them? Who will use them soon? First: what kind of information we store about the locos. I divided it to three parts: ID Information Attributes Then a box appears with the diagram about the publication. Unfortunately not every IM was constructive and sent data, so we had to invent from the previous timetable periods. That is why we are asking for their patience, data quality could be a problem. BUT!!! We can always add new locos. They should contact us. Next box about the use of the locos, first Rus will create dossiers and RFCs will import PaPs where there loco type should match to the PaP’s reference loco. Last object is CMS icon with the reference of documentation. RUs (dossier creation) RFCs (PaPs) CMS 19 September 2018

9 Notifications Mail PCS New notifications (Ad-Hoc &LPR)
Harmonisation started → RU Offer arrived → RU Request arrived → RFC/IM/AB PCS Notification Center REPORTS: Report generated Subscribe/Unsubscribe REQUEST/OFFER To/From new notifications To/From already existing notifications Offer sent for dossier Path request submitted Harmonization started Default Everybody is subscribed to every notification Change Go to Personal settings Edit subscription ALTERNATIVE OFFER PCS can send s to the user with certain information. It happens upon deadlines or specific actions with dossiers. New notifications are valid only in ad-hoc and late path request process. Notification module was created where anyone can customize his settings. Then the phone will appear just to have something nice. Important that as default everybody is subscribed to everything. If they don’t like, they have unsub. in personal settings. Alternative offer arrived Alternative offer accepted Alternative offer rejected 19 September 2018

10 How much did it cost?

11 Train the Trainer Survey

12 Train the trainer survey: 21 participants
ADIF Renfe Mercancias Renfe Viajeros Transfesa OEBB OEBB Infra OEBB PV FV Infrabel Prorail Network Rail NMBS MTD ZSSK AWT CARBO RTI LTE SZDC All Czech RUs Most Slovak RUs Die Länderbahn PKP Cargo RCA RCH Mercitalia CargoServ Koleje Slaskie Trafikverket Banedanmark BaneNor ScanMed RFC3 users Hector Rail Green Cargo DB Cargo DB Cargo Scandinavia Cargonet RFI Italy LFP CFR All Romanian RUs and RFC8 North Sea Baltic Users Trasse Scheweiz AG SNCF Réseau SNCF-R SNCF Freight Sibelit Lineas ECR Viia VFLI Europorte SNCF Voyages Thalys Lyria Elipsos Eurostar PKP PLK Przewozy Regionalne, PKP Intercity SBB Infra DB Netz Bane NOR Bane NOR (IM) CargoNet VPE NRIC Gysev-C RCH-RCC DBC FOXRail NS Nederlands SBB Passenger DB Fernverkehr AG

13 Support, Training, Certification questions

14 What type of training materials / Tools do you use?

15 What is the format of your trainings?

16 What are the user types and subjects of your trainings?
19 September 2018


Download ppt "PCS Statistics and main development’s history 2017"

Similar presentations


Ads by Google