Presentation is loading. Please wait.

Presentation is loading. Please wait.

Saudi Railway Master Plan

Similar presentations


Presentation on theme: "Saudi Railway Master Plan"— Presentation transcript:

1 Saudi Railway Master Plan
Hamad Y. Al-Yousef

2 Introduction Saudi Railway Company (SAR) Established (May 2006) Based on the Royal Decree No. (M /26) The Company is fully funded and owned by the Public Investment Fund, PIF (Ministry Of Finance) SAR Rail-Network: Approx. 3900km Operational: 1400 km (Mineral Line) 2

3

4 SAR Services Passenger Services FRIEGHT Services Mineral Services

5 Operation Photos SAR train with 120 wagons – Phosphate Loading operation at Al Jalamid

6 Operation Photos SAR Loaded train with 120 wagons – Going to Ras Al Khair

7 Operation Photos SAR train with 120 wagons – Phosphate Unloading operation at Ras Al Khair

8 Operation Success VS I trip of SAR train:
SAR Mineral Line Operation commenced in May 2011 Phosphate Hauled to-date over two million tons VS I trip of SAR train: Avg. Tons Capacity 12,000 Avg. Diesel Cons. 22,000 L Operating Crew 4 Travel Time 28 H Cost of Transport/Ton X Transferred through 480 Trucks Avg. Diesel Cons. 73,333 L Operating Crew 480 Travel Time 20 H Cost of Transport/Ton 2.5 X

9 Business Opportunities
SAR urges Vendors, Consultants, Designers, Construction Contractors… etc. to register with SAR thru:


Download ppt "Saudi Railway Master Plan"

Similar presentations


Ads by Google