Presentation is loading. Please wait.

Presentation is loading. Please wait.

PRODUCTION AND OPERATIONS MANAGEMENT

Similar presentations


Presentation on theme: "PRODUCTION AND OPERATIONS MANAGEMENT"— Presentation transcript:

1 PRODUCTION AND OPERATIONS MANAGEMENT
Ch. 15: Material Requirements Planning (MRP) SUMMARY POM – J. Galván

2 BASIC POINTS Dependent & independent demand POM – J. Galván

3 QUESTIONS Once a material requirements plan (MRP) has been established, what other managerial applications might be found for the technique? What do we mean by closed loop MRP? Discuss MRP. What are the inputs and outputs of an MRP system? A planning system that schedules the precise quantity of materials needed to make a product is called flexible scheduling cycle time management. material requirements planninge conomic order quantities.

4 What may happen if you do not plan
POM – J. Galván

5 What the introduction of computers can do
POM – J. Galván


Download ppt "PRODUCTION AND OPERATIONS MANAGEMENT"

Similar presentations


Ads by Google