Beni Asllani University of Tennessee at Chattanooga
Chapter 14 Resource Planning Operations Management - 5th Edition Roberta Russell & Bernard W. Taylor, III Beni Asllani University of Tennessee at Chattanooga Copyright 2006 John Wiley & Sons, Inc.
2
Lecture Outline Material Requirements Planning (MRP)
Capacity Requirements Planning (CRP) Enterprise Resource Planning (ERP) Customer Relationship Management (CRM) Supply Chain Management (SCM) Collaborative Product Commerce (CPC) Copyright 2006 John Wiley & Sons, Inc.
3
Resource Planning for Manufacturing
Copyright 2006 John Wiley & Sons, Inc.
4
Material Requirements Planning (MRP)
Computerized inventory control and production planning system When to use MRP? Dependent demand items Discrete demand items Complex products Job shop production Assemble-to-order environments Copyright 2006 John Wiley & Sons, Inc.
5
Demand Characteristics
Week 400 – 300 – 200 – 100 – No. of tables Continuous demand M T W Th F M T W Th F Discrete demand Independent demand 100 tables Dependent demand 100 x 1 = 100 tabletops 100 x 4 = 400 table legs Copyright 2006 John Wiley & Sons, Inc.
6
Material Requirements Planning
Planned order releases Work orders Purchase orders Rescheduling notices Item master file Product structure Master production schedule Copyright 2006 John Wiley & Sons, Inc.
7
MRP Inputs and Outputs Inputs Outputs Master production schedule
Product structure file Item master file Outputs Planned order releases Work orders Purchase orders Rescheduling notices Copyright 2006 John Wiley & Sons, Inc.
8
Master Production Schedule
Drives MRP process with a schedule of finished products Quantities represent production not demand Quantities may consist of a combination of customer orders and demand forecasts Quantities represent what needs to be produced, not what can be produced Quantities represent end items that may or may not be finished products Copyright 2006 John Wiley & Sons, Inc.
9
Master Production Schedule (cont.)
PERIOD MPS ITEM Clipboard Lapdesk Lapboard Pencil Case Copyright 2006 John Wiley & Sons, Inc.
10
Product Structure Clipboard Top clip (1) Bottom clip (1)
Pivot (1) Spring (1) Rivets (2) Finished clipboard Pressboard (1) Clipboard Copyright 2006 John Wiley & Sons, Inc.
11
Product Structure Tree
Clipboard Level 0 Level 1 Level 2 Spring (1) Bottom Clip (1) Top Clip (1) Pivot (1) Rivets (2) Clip Ass’y (1) Pressboard (1) Copyright 2006 John Wiley & Sons, Inc.
12
Intended BOM List 0 - - - - Clipboard ea 1
Clip Assembly ea 1 Top Clip ea 1 Bottom Clip ea 1 Pivot ea 1 Spring ea 1 Rivet ea 2 Press Board ea 1 LEVEL ITEM UNIT OF MEASURE QUANTITY Copyright 2006 John Wiley & Sons, Inc.
13
Specialized BOMs Phantom bills K-bills Transient subassemblies
Never stocked Immediately consumed in next stage K-bills Group small, loose parts under pseudo-item number Reduces paperwork Copyright 2006 John Wiley & Sons, Inc.
14
Specialized BOMs (cont.)
Modular bills Product assembled from major subassemblies and customer options Modular bill kept for each major subassembly Simplifies forecasting and planning X10 automobile example 3 x 8 x 3 x 8 x 4 = 2,304 configurations = 26 modular bills Time-phased bills an assembly chart shown against a time scale Copyright 2006 John Wiley & Sons, Inc.
15
Modular BOMs Copyright 2006 John Wiley & Sons, Inc. X10 Automobile
4-Cylinder (.40) Bright red (.10) Leather (.20) Grey (.10) Sports coupe (.20) 6-Cylinder (.50) White linen (.10) Tweed (.40) Light blue (.10) Two-door (.20) 8-Cylinder (.10) Sulphur yellow (.10) Plush (.40) Rose (.10) Four-door (.30) Neon orange (.10) Off-white (.20) Station wagon (.30) Metallic blue (.10) Cool green (.10) Emerald green (.10) Black (.20) Jet black (.20) Brown (.10) Champagne (.20) B/W checked (.10) X10 Automobile Engines Exterior color Interior Interior color Body (1 of 3) (1 of 8) (1 of 3) (1 of 8) (1 of 4) Copyright 2006 John Wiley & Sons, Inc.
16
Time-phased Bills Forward scheduling: start at today‘s date and schedule forward to determine the earliest date the job can be finished. If each item takes one period to complete, the clipboards can be finished in three periods Backward scheduling: start at the due date and schedule backwards to determine when to begin work. If an order for clipboards is due by period three, we should start production now Copyright 2006 John Wiley & Sons, Inc.
17
Item Master File DESCRIPTION INVENTORY POLICY
Item Pressboard Lead time 1 Item no. 734 Annual demand 5000 Item type Purch Holding cost 1 Product/sales class Comp Ordering/setup cost 50 Value class B Safety stock 0 Buyer/planner RSR Reorder point 39 Vendor/drawing EOQ 316 Phantom code N Minimum order qty 100 Unit price/cost 1.25 Maximum order qty 500 Pegging Y Multiple order qty LLC 1 Policy code 3 Copyright 2006 John Wiley & Sons, Inc.
18
Item Master File (cont.)
PHYSICAL INVENTORY USAGE/SALES CODES On hand 100 YTD usage/sales 1100 Location W142 MTD usage/sales 75 On order 100 YTD receipts 1200 Allocated 75 MTD receipts 0 Cycle 3 Last receipt 8/25 Last count 9/5 Last issue 10/5 Difference -2 Cost acct Routing 00326 Engr 07142 Copyright 2006 John Wiley & Sons, Inc.
19
MRP Processes Exploding the bill of material Netting out inventory
Lot sizing Time-phasing requirements Copyright 2006 John Wiley & Sons, Inc.
20
MRP Matrix Copyright 2006 John Wiley & Sons, Inc.
21
MRP: Example Master Production Schedule 1 2 3 4 5
Clipboard Lapdesk Item Master File CLIPBOARD LAPDESK PRESSBOARD On hand On order 175 (Period 1) 0 0 (sch receipt) LLC 0 0 1 Lot size L4L Mult 50 Min 100 Lead time 1 1 1 Copyright 2006 John Wiley & Sons, Inc.
22
MRP: Example (cont.) Product Structure Record Clipboard Lapdesk
Pressboard (2) Trim (3’) Beanbag (1) Glue (4 oz) Level 0 Clip Ass’y Rivets Level 1 Copyright 2006 John Wiley & Sons, Inc.
23
MRP: Example (cont.) ITEM: CLIPBOARD LLC: 0 PERIOD
LOT SIZE: L4L LT: Gross Requirements Scheduled Receipts 175 Projected on Hand 25 Net Requirements Planned Order Receipts Planned Order Releases Copyright 2006 John Wiley & Sons, Inc.
24
MRP: Example (cont.) (25 + 175) = 200 units available
ITEM: CLIPBOARD LLC: 0 PERIOD LOT SIZE: L4L LT: Gross Requirements Scheduled Receipts 175 Projected on Hand Net Requirements 0 Planned Order Receipts Planned Order Releases ( ) = 200 units available ( ) = 115 on hand at the end of Period 1 Copyright 2006 John Wiley & Sons, Inc.
25
MRP: Example (cont.) 115 units available
ITEM: CLIPBOARD LLC: 0 PERIOD LOT SIZE: L4L LT: Gross Requirements Scheduled Receipts 175 Projected on Hand Net Requirements 0 0 Planned Order Receipts Planned Order Releases 115 units available ( ) = 20 on hand at the end of Period 2 Copyright 2006 John Wiley & Sons, Inc.
26
MRP: Example (cont.) 20 units available
ITEM: CLIPBOARD LLC: 0 PERIOD LOT SIZE: L4L LT: Gross Requirements Scheduled Receipts 175 Projected on Hand Net Requirements Planned Order Receipts Planned Order Releases 100 20 units available ( ) = -100 — 100 additional Clipboards are required Order must be placed in Period 2 to be received in Period 3 Copyright 2006 John Wiley & Sons, Inc.
27
MRP: Example (cont.) ITEM: CLIPBOARD LLC: 0 PERIOD LOT SIZE: L4L LT: Gross Requirements Scheduled Receipts 175 Projected on Hand Net Requirements Planned Order Receipts Planned Order Releases Following the same logic Gross Requirements in Periods 4 and 5 develop Net Requirements, Planned Order Receipts, and Planned Order Releases Copyright 2006 John Wiley & Sons, Inc.
28
MRP: Example (cont.) ITEM: LAPDESK LLC: 0 PERIOD
LOT SIZE: MULT 50 LT: Gross Requirements Scheduled Receipts Projected on Hand 20 Net Requirements Planned Order Receipts Planned Order Releases Copyright 2006 John Wiley & Sons, Inc.
29
MRP: Example (cont.) ITEM: LAPDESK LLC: 0 PERIOD LOT SIZE: MULT 50 LT: Gross Requirements Scheduled Receipts Projected on Hand Net Requirements Planned Order Receipts Planned Order Releases Following the same logic, the Lapdesk MRP matrix is completed as shown Copyright 2006 John Wiley & Sons, Inc.
30
MRP: Example (cont.) ITEM: CLIPBOARD LLC: 0 PERIOD
ITEM: PRESSBOARD LLC: 0 PERIOD LOT SIZE: MIN 100 LT: Gross Requirements Scheduled Receipts Projected on Hand 150 Net Requirements Planned Order Receipts Planned Order Releases ITEM: CLIPBOARD LLC: 0 PERIOD LOT SIZE: L4L LT: Planned Order Releases ITEM: LAPDESK LLC: 0 PERIOD LOT SIZE: MULT 50 LT: Planned Order Releases Copyright 2006 John Wiley & Sons, Inc.
31
MRP: Example (cont.) x1 x2 ITEM: CLIPBOARD LLC: 0 PERIOD
ITEM: PRESSBOARD LLC: 0 PERIOD LOT SIZE: MIN 100 LT: Gross Requirements Scheduled Receipts Projected on Hand 150 Net Requirements Planned Order Receipts Planned Order Releases ITEM: CLIPBOARD LLC: 0 PERIOD LOT SIZE: L4L LT: Planned Order Releases ITEM: LAPDESK LLC: 0 PERIOD LOT SIZE: MULT 50 LT: Planned Order Releases x2 x1 Copyright 2006 John Wiley & Sons, Inc.
32
MRP: Example (cont.) ITEM: CLIPBOARD LLC: 0 PERIOD
ITEM: PRESSBOARD LLC: 0 PERIOD LOT SIZE: MIN 100 LT: Gross Requirements Scheduled Receipts Projected on Hand Net Requirements Planned Order Receipts Planned Order Releases ITEM: CLIPBOARD LLC: 0 PERIOD LOT SIZE: L4L LT: Planned Order Releases ITEM: LAPDESK LLC: 0 PERIOD LOT SIZE: MULT 50 LT: Planned Order Releases Copyright 2006 John Wiley & Sons, Inc.
33
MRP: Example (cont.) Planned Order Report PERIOD ITEM 1 2 3 4 5
Clipboard Lapdesk Pressboard Copyright 2006 John Wiley & Sons, Inc.
34
Lot Sizing in MRP Systems
Lot-for-lot ordering policy Fixed-size lot ordering policy Minimum order quantities Maximum order quantities Multiple order quantities Economic order quantity Periodic order quantity Copyright 2006 John Wiley & Sons, Inc.
35
Advanced Lot Sizing Rules: L4L
Total cost of L4L = (4 X $60) + (0 X $1) = $240 Copyright 2006 John Wiley & Sons, Inc.
36
Advanced Lot Sizing Rules: EOQ
minimum order quantity Total cost of EOQ = (2 X $60) + [( ) X $1)] = $220 Copyright 2006 John Wiley & Sons, Inc.
37
Advanced Lot Sizing Rules: POQ
periods worth of requirements Total cost of POQ = (2 X $60) + (20 X $1) = $180 Copyright 2006 John Wiley & Sons, Inc.
38
Planned Order Report Item #2740 Date 9 - 25 - 05
On hand 100 Lead time 2 weeks On order 200 Lot size 200 Allocated 50 Safety stock 50 SCHEDULED PROJECTED DATE ORDER NO. GROSS REQS. RECEIPTS ON HAND ACTION 50 9-26 AL 9-30 AL 10-01 GR 10-08 SR Expedite SR 10-01 10-10 CO 10-15 GR 10-23 GR 10-27 GR Release PO 10-13 Key: AL = allocated WO = work order CO = customer order SR = scheduled receipt PO = purchase order GR = gross requirement Copyright 2006 John Wiley & Sons, Inc.
39
MRP Action Report Current date 9-25-05 ITEM DATE ORDER NO. QTY. ACTION
# Expedite SR 10-01 # Move forward PO 10-07 # Move forward PO 10-05 # Move backward PO 10-25 # De-expedite SR 10-30 # Release PO 10-13 # Release WO 10-24 Copyright 2006 John Wiley & Sons, Inc.
40
Capacity Requirements Planning (CRP)
Creates a load profile Identifies under-loads and over-loads Inputs Planned order releases Routing file Open orders file Copyright 2006 John Wiley & Sons, Inc.
41
CRP MRP planned order releases Routing file Capacity requirements
planning Open orders Load profile for each machine center Copyright 2006 John Wiley & Sons, Inc.
42
Leveling Under-load Conditions
Acquire more work Pull work ahead that is scheduled for later time periods Reduce normal capacity Copyright 2006 John Wiley & Sons, Inc.
43
Reducing Over-load Conditions
Eliminating unnecessary requirements Rerouting jobs to alternative machines, workers, or work centers Splitting lots between two or more machines Increasing normal capacity Subcontracting Increasing efficiency of the operation Pushing work back to later time periods Revising master schedule Copyright 2006 John Wiley & Sons, Inc.
44
Initial Load Profile Hours of capacity Normal capacity Time (weeks)
Time (weeks) Normal capacity 120 – 110 – 100 – 90 – 80 – 70 – 60 – 50 – 40 – 30 – 20 – 10 – 0 – Copyright 2006 John Wiley & Sons, Inc.
45
Adjusted Load Profile Hours of capacity Normal capacity Time (weeks)
Time (weeks) Normal capacity 120 – 110 – 100 – 90 – 80 – 70 – 60 – 50 – 40 – 30 – 20 – 10 – 0 – Pull ahead Push back Overtime Work an extra shift Copyright 2006 John Wiley & Sons, Inc.
46
Relaxing MRP Assumptions
Material is not always the most constraining resource Lead times can vary Not every transaction needs to be recorded Shop floor may require a more sophisticated scheduling system Scheduling in advance may not be appropriate for on-demand production. Copyright 2006 John Wiley & Sons, Inc.
47
Enterprise Resource Planning (ERP)
Software that organizes and manages a company’s business processes by sharing information across functional areas integrating business processes facilitating customer interaction providing benefit to global companies Copyright 2006 John Wiley & Sons, Inc.
48
ERP Modules Copyright 2006 John Wiley & Sons, Inc.
49
Organizational Data Flows
Source: Adapted from Joseph Brady, Ellen Monk, and Bret Wagner, Concepts in Enterprise Resource Planning (Boston: Course Technology, 2001), pp. 7–12 Copyright 2006 John Wiley & Sons, Inc.
50
Selected Enterprise Software Vendors
Copyright 2006 John Wiley & Sons, Inc.
51
ERP Implementation Analyze business processes
Choose modules to implement Which processes have the biggest impact on customer relations? Which process would benefit the most from integration? Which processes should be standardized? Align level of sophistication Finalize delivery and access Link with external partners Copyright 2006 John Wiley & Sons, Inc.
52
Customer Relationship Management (CRM)
Software that Plans and executes business processes Involves customer interaction Changes focus from managing products to managing customers Analyzes point-of-sale data for patterns used to predict future behavior Copyright 2006 John Wiley & Sons, Inc.
53
Supply Chain Management
Software that plans and executes business processes related to supply chains Includes Supply chain planning Supply chain execution Supplier relationships Distinctions between ERP and SCM are becoming increasingly blurred Copyright 2006 John Wiley & Sons, Inc.
54
Collaborative Product Commerce (CPC)
Software that Incorporates new product design and development and product life cycle management Integrates customers and suppliers in the design process though the entire product life cycle Copyright 2006 John Wiley & Sons, Inc.
55
ERP and Software Systems
Customer Relationship Management (CRM) Enterprise Resource Planning (ERP) Collaborative Product Commerce (CPC) Supply Chain Management (SCM) Time to Market Time to Customer Customers Product Design Suppliers Collaborative Design Manufacture & Delivery Collaborative Manufacture DFMA Source: Adapted from George Shaw, “Building the Lean Enterprise: Reducing Time to Market.” Industry Week (Webcast, June 14, 2001), pent0614.html Copyright 2006 John Wiley & Sons, Inc.
56
Connectivity Application programming interfaces (APIs)
give other programs well-defined ways of speaking to them Enterprise Application Integration (EAI) solutions EDI is being replaced by XML Copyright 2006 John Wiley & Sons, Inc.
57
Copyright 2006 John Wiley & Sons, Inc. All rights reserved
Copyright 2006 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in section 117 of the 1976 United States Copyright Act without express permission of the copyright owner is unlawful. Request for further information should be addressed to the Permission Department, John Wiley & Sons, Inc. The purchaser may make back-up copies for his/her own use only and not for distribution or resale. The Publisher assumes no responsibility for errors, omissions, or damages caused by the use of these programs or from the use of the information herein. Copyright 2006 John Wiley & Sons, Inc.