1 National System and QA/QC: The Netherlands
Workshop UNFCCC Bonn, April 2005 Dirk Both (SenterNovem) woensdag 19 september 2018woensdag 19 september 2018

2 Overview presentation
National system developments QA/QC general approach taken monitoring protocols Quality control elements, experiences Quality assurance Evaluation and improvement continuous improvement, remaining start-up Conclusions Version April 7, 2005

3 National System - Developments
Historical situation: Pollution Emission Register (PER) for all emissions to water, air and soil Over many years, gradually extended Task Forces per (group of) ‘sectors’ Co-operation between various Ministries and institutes (e.g. RIVM, CBS/Statistics, TNO, WUR, AOO, etc.) Responsibilities divided over organizations Version April 7, 2005

4 National System - Developments
Assessment (around 2001) for GHG emissions: System not yet sufficient to comply with KP requirements Expert workshops> changes in methods required, white spots Since 1997: ISO parts of process. Study compared QA/QC with requirements under KP > additional actions needed Documentation not always sufficiently transparent Changes since 2001 for GHG emissions and sinks Improvement program (QA/QC + National System) since SenterNovem assigned coordination of this program up to 2006 Reorganization of PER in 2004 (RIVM) Version April 7, 2005

5 National System - Developments Present main structure
Version April 7, 2005

6 QA/QC - General approach taken
Improvement program QA/QC+National System: Bring methods in line with KP requirements (Quality) improvement projects > better data quality/methods Define, plan & describe methods, processes, tasks and responsibilities Monitoring Protocols Improve further QA/QC, where needed: Routine control during inventory preparation > Quality control Further assuring quality of inventory process > Quality assurance Enable continuous improvement Evaluation and improvement cycle Coordination by SenterNovem for Ministry of Environment (VROM). Guidance by advisory committee Version April 7, 2005

7 QA/QC - General approach taken
QA/QC programme, includes: Approach and objectives: Aim to comply with KP requirements Aim at continuous improvement Follow TCCCA principles Includes also ‘start-up’ activities (to timely comply with KP reqs.) Key element in NL for quality improvement: monitoring protocols QA/QC activities (plan) Quality control Quality assurance Documentation and archiving (not further elaborated in this presentation) Evaluation and improvement (incl. improvement plan) Annually to be updated Version April 7, 2005

8 QA/QC - General approach taken
Monitoring Protocols More general QA/QC character Elements a.o.: Source characteristics in NL Methodologies, work process AD sources, EF background Source specific QA/QC Uncertainty information Other relevant references/background documents Legal basis planned Elaborated with involved sectors/organisations, co-ordinated by SenterNovem Primarily for key sources; also ‘short’ version for non-key sources Version April 7, 2005

9 QA/QC - General approach taken
Monitoring Protocols (ctd): Experiences: Process takes time in initial phase, but it proved: Instrumental in assessing situation (relative to KP requirements), setting priorities and further (QA/QC) improvements Instrumental in transparency and consistency (in time) assesses actuality and completeness of documentation increases transparency (easier communication, facilitates reviews, increases reproducibility and training options, etc.) now also under preparation for non GHG emissions Instrumental in defining tasks, responsibilities, risk management Will be placed on Version April 7, 2005

10 Quality Control Main elements: General QC procedures (Tier 1)
Monitoring Protocols (see earlier sheets) Update of QA/QC of outside agencies (on-going) General QC Procedures (Tier 1) Source-specific QC procedures (Tier 2) General QC procedures (Tier 1) Existing procedures adapted to meet GPG requirements Implementation as part of Release process of Protocols e.g. checks on applicability of country specific EF, on completeness of documentation, etc. Annual checks of data and calculations e.g. in trend workshops Using supporting check forms (preferably embedded in normal process, thus ‘specific’ ) Sampling process to be defined in annual overall work plans. Version April 7, 2005

11 Quality Control Some examples of data checks:
Related to completeness, emission level and errors By staff from Task Forces; covers also the CRF data set Some automated checks (on completeness and consistency) Levels per sector per year compared with previous year Trend analysis workshops of Task Forces together If significant differences > checks on more detailed level (sub-sector, process related emissions, EF, AD) Checks on country specific emission factors Annually for industry --> comparing with defaults. For energy/traffic --> measurements Expert judgements + where needed, additional research Source specific QA/QC (Tier 2) Elaborated and described in monitoring protocols Version April 7, 2005

12 Quality Assurance Elements: Basic peer review of inventory:
Public review Other reviews (EU process, etc.) Verification Audits Basic peer review of inventory: In part done in Trend Analysis workshops Also annual Peer Review: for NIR 2005 in February 2005; planning of Peer Review interacts with EU MM process Public review of draft NIR: Public review: yearly since 2003 Version April 7, 2005

13 Quality Assurance Other reviews Verification: Audits:
Extensive reviews As part of protocol process and improvement programme, many sectors have been assessed in past few years Further updating schedule in QAQC programme Review within EU process Mutual review with Belgium under preparation Reconnaissance of further collaborative review in future Verification: Depending on data availability. Further assessed. Audits: Under study Planned: further adapting PER ISO system to new organisation ER Version April 7, 2005

14 Evaluation and improvement
Includes: improvement projects (from ‘start-up’ phase) Aimed to timely comply with KP requirements annual evaluation and improvement cycle Aimed at continuous improvement Inputs: mentioned reviews, experiences, UNFCCC reviews Improvement Projects (start-up) e.g. Improved method CO2 emissions from combustion (transparency, consistency) Re-evaluated CO2 emission factors fuels (transparency, accuracy) Improved distinction national<>international shipping (comparability) Tier 2 method CO2 from feedstock (accuracy) Tier 2 method CH4 from enteric fermentation cattle (accuracy) Updating CH4 emissions from landfills and waste water treatment plants (accuracy) Identification of significant non-CO2 sources (completeness) Assessment and ‘solving’ white spots for sinks/LULUCF monitoring (completeness) Version April 7, 2005

15 Evaluation and improvement
Improvement actions (‘ongoing’): Improvement projects: Updating uncertainty analyses Protocols: Further checks and upgrades, where needed, before next ‘round’ QA/QC Programme Update before next round To be placed on website Strengthening institutional and legal basis Covenants with data suppliers (partially realised) Legal basis for Protocols (planned for September 2005) Version April 7, 2005

16 Research but also Information
Finally…. Most QAQC resources needed at start-up phases of QAQC improvement. Many actions after first phases to be fully integrated in annual work plans of involved organisations Focus was needed on strengthening various QAQC elements Research but also Information management creativity orginality reproducibility of the results reputation consistency comparability transparency of the process confidence Source: DHV Version April 7, 2005