Presentation is loading. Please wait.

Presentation is loading. Please wait.

Hazards Planning and Risk Management

Similar presentations


Presentation on theme: "Hazards Planning and Risk Management"— Presentation transcript:

1 Hazards Planning and Risk Management
Lecture No. 07 GIS Lab 2 Fall 2016 US – Pakistan Center for Advanced Studies in Water

2 Learning Objectives Using arcgis How to Digitize create a gis layer from tabular data geo-reference an image

3 Digitizing - Buildings - Roads
Digitize on rectified image

4 Creating and Adding New Layers
Create New feature layers through ArcCatalog Polygon – for Buildings Feature class name = Buildings Add Field ‘Building_Type Line – for roads Feature class name = Roads Add Field ‘Road_Type’ Add New feature layers in ArcMap

5 Digitizing Roads

6 Creating Templates Right click Roads layer, go to properties > symbology > categories > unique values Value Field = Road_Type Add Values Highways Roads Local Roads OK, OK (symbology window)

7 Organizing Template Editor > Editing Window > Organize Feature Template (Create Feature window) Select ‘Roads’ Click ‘New Template’ Check Layer ‘Road’ Next Check Template Names √ Highways, √ Roads, √ Local Roads Finish Close ‘Organize Feature Template’

8 Start Digitizing Select type of Road (Highway, Roads, or Local Roads) from ‘Create Feature’ window Click the starting point (snapping is on as a default) Keep clicking along the road by adding vertices At finish point either Double click Click F2 Right click > Finish Sketch Select another template and create sketch

9 Digitizing Buildings

10 Class Assignment Digitize buildings in the image

11 processing tabular data

12 Look at Google Earth Image

13 Look at Google Earth Image

14 Converting XY Table into Point Feature Class
Get longitude (X) and Latitude (Y) from Google Earth

15 longitude (X) and Latitude (Y) from Google Earth
Save in Excel Convert in Decimal Degree format Add Excel worksheet in ArcMap Add Data > Add XY Data (geographic coordinate system, WGS 1984) Select a coordinate system for the data Points will be drawn as an event theme in ArcMap

16 Convert the event theme to a shapefile or geodatabase feature class
Right-click the file name, select Data > Export Data Points can be exported to a geodatabase feature class or to a shapefile Re-project to the UTM coordinate system

17 georeferencing

18 Georeferencing Save Google Earth Image (jpeg)
Select Ground Control Points (GCP) At least 3 points are required for Affine (1st Order polynomial transformation) Add Georeferencing tool bar Apply ‘Fit to Display’ on the image Add GCPs Update Georeferencing when satisfied Rectify for permanent transformation


Download ppt "Hazards Planning and Risk Management"

Similar presentations


Ads by Google