Download presentation
Presentation is loading. Please wait.
Published byBeatrix Shelton Modified over 6 years ago
1
Presented By: Mike Stout – PPL Glenn Neises - INPO
INPO AP-929, Rev.1 Presented By: Mike Stout – PPL Glenn Neises - INPO
2
INPO AP-929, Rev. 1 Draft developed by INPO at the request of the CMBG Steering Committee Draft dated May 2003 never issued Draft really deals with modification process and some design basis; not a configuration management process Steering Committee and INPO have agreed to work together to develop the revision that describes a configuration management process
3
INPO AP-929, Rev. 1 Approach Establish scope of the document
80/20 rule – several members of the group will be asked to work on the document and meet for 2 days to develop the best document in that time frame Make it consistent with ANSI/NIRMA CM Start with new process model (IDEF0)
4
INPO AP-929, Rev. 1 Standard Nuclear Performance Model (IAEA same)
Evaluate problem or request Consider whether a design change is required If no, then consider whether a plant change is required If no, then consider whether a FCI change is required Or, do nothing more and document decision
5
INPO AP-929, Rev. 1 Missing Definitions are not complete Changes
Configuration Change Design Authority Design Specifications Time effect on completed and installed design Changes The activities in Rev. 1 are not incorrect, they are incomplete.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.