Download presentation
Presentation is loading. Please wait.
Published byFelice Gregorio Vitali Modified over 6 years ago
1
Softrock 20m SDR RX Buildathon Radio Play Days 11 July 2009
9/20/2018 MARS Buidathon 11 Jul 2009
2
The Circuit 9/20/2018 MARS Buidathon 11 Jul 2009
3
The kit 9/20/2018 MARS Buidathon 11 Jul 2009
4
Stages of the Build PS – Power Supply LO – Local Oscillator
2 ceramic caps; 1 SMT cap; 1 diode; 1 TO-92 voltage regulator; 9V power lead Smoke Test Station LO – Local Oscillator 3 ceramic caps; 1 SMT cap; 2 transistors; 7 resistors; 1 XTAL Smoke, Frequency Test Stations DIV – Dividers/Phasers 7 SMT caps; 2 SMT ICs SMT, Smoke, and Frequency Test Stations OPAMP – Operational Amplifiers 3 ceramic caps; 8 resistors; 1 SMT IC SMT, Smoke, and Op-Amp Test Stations BPF – Bandpass Filter 2 ceramic caps; 1 coil; 1 transformer MIX – Mixer 2 ceramic caps; 2 resistors CONN – Connect and go Stereo cable /plug (or jack); antenna coax; PC; software Final Test Station 9/20/2018 MARS Buidathon 11 Jul 2009
5
Fixtures/ Elmer Stations
1. Smoke Test – DMM (test current draw, limited and unlimited) 2. SMT (IC installation,) Soldering; Heat gun; Tweezers; lighted magnifier; Panavise Jr. 3. OpAmp Test (voltage gain) DMM; 10k resistors; clip leads (builder “borrows” resistors/leads) 4. Inductors (winding, tinning) DMM; Clamps; Paste Flux/Solder; Soldering Iron; extra #30 Magnet Wire; extra cores; ruler 5. Freq Test (LO, Div, phasing, audio I/Q) Freq meter; Sig generator; dual trace scope 6. Final Test (receiving) PC with SDR software; Stereo Soundcard; 20m dipole antenna or hamstick 7. Rework/Troubleshooting Club-furnished solder (63/ ”), RG-174 Coax, spare parts Solder wick, flux, heat gun, solder station 9/20/2018 MARS Buidathon 11 Jul 2009
6
Builder’s Station DMM Soldering Station: .032” or smaller tip; .015” solder Vise/Board Holder/Jig Bright light, with magnification Diagonal Cutters Wire strippers Tweezers recommended Uncoated Cookie sheet: 8 x 10 or 11 x 14 w/grounding lead Power strip Safety glasses 9V battery Power leads (red/black, mate with 9V battery) Stereo cable with stereo mini plug (or stereo jack) 9/20/2018 MARS Buidathon 11 Jul 2009
7
Builder Station Infrastructure
See Infrastructure Details Checklist: ☐Kit, with Components Organized(We do not have spare kits! ☐DMM(labeled with your call) ☐Solder Station(labeled with your call) ☐3rd Hand/Vise(labeled with your call) ☐Light and Magnification(labeled with your call) ☐Cookie sheet(labeled with your call) ☐Tweezers ☐Stripper ☐Cutter ☐Power Strip(labeled with your call) ☐Connectors ☐Grounding wire/clip ☐PC(Optional)(labeled with your call) 9/20/2018 MARS Buidathon 11 Jul 2009
8
Process – Pre-Build Day
Before build day, each registered builder does prep-work: Reviews “Getting Ready” Instructions (downloadable PDF) Studys & prints out documentation pages Prints out Stage BOMs and organizes BOM components by stage Obtains Builder Station Infrastructure Items (Optional) Loads Winrad and Rocky to PC (if have PC) (Optional) Winds coil and transformer at home before coming to Buildathon Pack “build-day kit” 9/20/2018 MARS Buidathon 11 Jul 2009
9
Process – Build Day Each builder to a build station (“home”)
Builder goes through each stage: PS: test at smoke test station; back to home for remaining tests. LO: test at smoke test, freq test stations ; back to home for remaining tests. DIV: go to SMT station for ICs (do caps at builder station); test at smoke test, freq test stations ; back to home for remaining tests. OP-AMP: go to SMT station for IC; test at smoke test, OpAmp Test stations ; back to home for remaining tests. BPF: wind coils, tin leads at Inductor Station ; back to home for remaining tests. MIX: test at smoke test ; back to home for remaining tests. EXT CONN: test at freq test station 9/20/2018 MARS Buidathon 11 Jul 2009
10
Smoke Test Elmer Station
9/20/2018 MARS Buidathon 11 Jul 2009
11
Smoke Test Procedure Start Select Resistor 1k 100 Record Limited
Value” Press “TEST” Record Unlimited Value DMM On < Nominal Value Current vs. Nominal Connect Board DMM OFF, Stop >= Nominal Value 9/20/2018 MARS Buidathon 11 Jul 2009
12
Frequency Test Elmer Station
9/20/2018 MARS Buidathon 11 Jul 2009
13
SMT Elmer Station 9/20/2018 MARS Buidathon 11 Jul 2009
14
Op-Amp Test Elmer Station
9/20/2018 MARS Buidathon 11 Jul 2009
15
Inductors Elmer Station
9/20/2018 MARS Buidathon 11 Jul 2009
16
Final Test Elmer Station
9/20/2018 MARS Buidathon 11 Jul 2009
17
Rework Elmer Station 9/20/2018 MARS Buidathon 11 Jul 2009
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.