Download presentation
Presentation is loading. Please wait.
1
Jan 2007
2
AB = 5.5 BC = 8 AI = 9 BD = 13 DE = 9 DG = 11 DF = 12* HI = 16.5 Total = 84 There should be n – 1 edges 9 – 1 = 8 edges *EF or GF could also be used
3
Note there are two other spanning trees you could have drawn had you used either EF or GF instead of DF. You MUST label each vertex with its corresponding letter There are two other spanning trees you could have drawn had you used either EF or GF instead of DF
4
GH = 5 GE = 7 HJ = 8 EB = 10 BD = 11 HI = 14 DC = 15 AC = 6 FJ = 19
Jan 2009 GH = 5 GE = 7 HJ = 8 EB = 10 BD = 11 HI = 14 DC = 15 AC = 6 FJ = 19 HK = 22 Total = 117 Total length = 117 miles Next Slide
5
Label and highlight each vertex
Minimum Spanning Tree K I G H J F C A D B E Label and highlight each vertex
6
AC = 13 AE = 14 EI = 15 CD = 16 CH = 20 EF = 21 FB = 19 BG = 19
Jan 2010 AC = 13 AE = 14 EI = 15 CD = 16 CH = 20 EF = 21 FB = 19 BG = 19 Total Spanning tree = 137
7
G B C A F H E D I
8
ODD vertices at B, C, D, E BC + DE BC (22) + DE (18) = 40 BD + CE BD (38) + CE (27) = 65 BE + CD BE (22) + CD (16) = 38 Repeat BE + CD = 38 Total route is 307m + (BE + CD) 38 = 345 metres
9
Jan 2011
10
EB = 5 EH = 7 AB = 8 HI = 9 AD = 10 DG = 4 EF = 12 FC = 6 Length of spanning tree = = 61
11
Original Spanning tree = 61
aiii) b) A 8 B A H F B E C I D G C 5 E D F 11 G H I Original Spanning tree = 61 AB and BE dropped = -13 GE added= 11 New Spanning tree = (61 – ) = 59
12
June 2012
13
AD AB AC 16 DE 19 EG 10 GI 12 IH 13 IF 17 Total 97 Total 97
14
IF
15
AC
16
Jan 2013 𝐴𝐵=6.1 𝐶𝐵=7.4 𝐵𝐸=9.7 D𝐸=7.2 𝐹𝐸=10.6 𝐸𝐻=12.5 𝐻𝐼=6.7 𝐺𝐻=8.9 𝑇𝑜𝑡𝑎𝑙=69.1 𝑆𝑒𝑒 𝐴𝑏𝑜𝑣𝑒
17
GH
18
EF
19
AB (The Lowest Value) EH (The Highest Value, from the Spanning Tree)
20
June 2011
21
AC = 10 CH = 9 FH = 8 CE = 10 ED = 11 Could use CD GH = 13 DB = 14 1 8
2 6 5 4 7 3 CH = 9 FH = 8 CE = 10 ED = 11 Could use CD GH = 13 DB = 14
22
75p AC = 10 CH = 9 FH = 8 CE = 10 ED = 11 GH = 13 DB = 14
Total Spanning Tree = 13 14 G B 75p
23
70p Delete ALL edges connected to H Total Spanning Tree =
10 C 10 E 11 9 11 8 F H D 14 13 14 Total Spanning Tree = 70p G B From the matrix TWO more edges need to be added, (AF 11 and any one of GC, GA, GD and GF all 14 are the lowest)
24
June 2014
25
4 1 2 3 7 5 6 70 + 80 + 80 + 85 + 60 + 110 = 485
26
70 80 80 85 110 60 FI and IS FI and GH
27
June 2008 𝑛−1= 𝟏𝟎 𝒏−𝟏
28
AB = 18 BC = 13 BD = 15 CF = 16 DG = 17 GK = 12 KJ = 16 KH = 17 KI = 17 IE = 14 Total Length = 155 Total Length = 155
29
G D B H A E K C I F J
30
June2006 AB = 5 BD = 3 DC = 1 DE = 4 DF = 5 FG = 6 GI = 10 GH = 11 HJ = 13 Total = 58 Total = 58
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.