RASP MINE Community Presentation October 2014
2
Identified Mineralisation
Western Mineralisation Central Remnants Southern Remnants Zinc Lodes Northern Remnants Centenary Mineralisation
3
Upside/Exploration - Identified Mineralised Targets
4
Surface Infrastructure / U/G Position
5
Surface Infrastructure / U/G Position
Comstock Street Eyre Street Piper Street Bonanza Street South Road Eyre Street
6
Vibration Monitors Eyre Street Comstock Street Piper Street
Bonanza Street South Road Eyre Street
7
Summary - Management of Potential Risks
Subsidence: 60m crown pillar as minimum Geotechnical studies and monitoring Mining sequence Conservative stope design Immediate back-filling after extraction Ground control design Vibration: Drill and blast designs to meet criteria Ongoing blasting assessment to conditions and potential receivers Survey control to ensure separation distances are maintained with Perilya Vibration monitoring Scheduled blasting times and signage Trigger action response plan indicates effects at surface Infrastructure: Civil engineer indicates no damage to roads, power lines or underground pipework Noise: All activities to occur underground, fans at 100m+ below ground Study found no measurable difference Air Quality: Intake air Shaft 5, Exhaust air Shaft 6 located middle of CML7 Study found no measureable difference Heritage: Stabilisation works for Shaft 4