1 Work experience presentation
Wise energy company Work experience presentation Transmission · Substation · Distribution EPC & Design/Build · Maintenance

2 ABOUT COMPANY WISE ENERGY was founded in 2010, has aim to bring high level of service in the energy and power sector. For international and local clients . Our services is -Transmission lines · Substations · Distribution- EPC & Design/Build · Maintenance -Equipment supply. In the context of international trade and cooperation with foreign contractors, WISE ENERGY has been started from Turkey, with bringing services in Azerbaijan ,Turkmenistan, Kyrgyzstan, Kazakhstan ,Russian and Europe The desire and honor of WISE ENERGY is reaching the best level of customer satisfaction.

3 TRANSMISSION CONSTRUCTION AND MAINTENANCE
Construction and maintenance of overhead high-voltage transmission lines through 1200kV is our specialty. We build and service major assets for many of the nation’s largest utilities, regional cooperatives and municipalities and are known for safe practices, efficiency and exceeding our clients’ expectations. TRANSMISSION LINE SERVICES 1- Pre-construction design and engineering consulting 2- Right-of-way (ROW) preparation and clearing 3- Environmental mitigation and compliance 4- Turnkey foundation installation 5- Wood, steel and concrete pole erection 6- Lattice tower assembly and erection 7- Wire stringing, sagging, clipping and dead-ending 8- Reconductoring of existing transmission lines 9- Energization and testing 10- 24/7 Emergency and storm response

4 OUR PROJECTS 0.4/1200KV

5 OUR PROJECTS 0.4/1200KV

6 SUBSTATION CONSTRUCTION AND MAINTENANCE
Power Line Services provides complete substation services in construction, design/build and commissioning of high-voltage substations and related equipment. Our skilled substation technicians, combined with our fleet of specialized equipment for low-overhead clearances, provide construction services to utilities, municipalities, electric cooperatives and industrial customers for substations ranging from 0.4kV to 1200kV. SUBSTATION SERVICES 1- Substation design/build and upgrades 2- GIS, SVC and HVDC installation 3- Steel erection and bus welding 4 -Installation of equipment, including switches, metal-clad switches, circuit breakers, instrumentation, SCADA and control panels 5- Power transformer relocation, assembly and degasification 6- 24/7 Emergency and storm response

7 OUR PROJECTS

8 OUR PROJECTS

9 OUR PROJECTS

10 STORM RESPONSE With assets located throughout the RUSSIA/EUROPE Power Line Services is able to mobilize our fleet of equipment and support vehicles rapidly across a wide geography. Our skilled transmission and distribution crews have developed a history of providing our clients with safe, high-quality performance, even under the most adverse weather conditions experienced during storm response. STORM RESPONSE SERVICES 24/7 Dispatch for emergency response Proven experience in restoration of transmission and distribution infrastructure throughout RUSSIA .IRAG, the Gulf Coast and the Midwest Multi-year storm contracts with several major utilities Teams with sister MTL Group Company Air3 for helicopter-based damage assessments, repairs and reconstruction Teams with sister MTL Group Company Artuser Services to provide amphibious response and rebuilding of foundations and structures

11 EPC & DESIGN/BUILD Power Line Services has extensive Design/Build experience for transmission lines, substations and distribution systems. The PLS team can provide turnkey facilities that will meet the owner’s requirements, budget and schedule. The Design/Build model provides owners with the security needed to bring projects in successfully. Benefits for the owner include the following: EPC & DESIGN/BUILD SERVICES Reduction of bid to completion time Comprehensive pre-construction planning Allows for strong communication between the owner, engineers and construction team Coordinated project that reduces project risk Single point of contact

12 COMPLETED PROJECTS PROJECT - Cyprus PROJECT TYPE- SUBSTATION
DISCRIPTION - Below grade work to include conduit, foundation, grounding grid, cable trench, all excavation is Hydro, Top rock installation. PROJECT - Turkey DISCRIPTION - Construction of approximately 70 km of 500kV transmission line PROJECT - Russia DISCRIPTION- Expansion of 800kv substation into a 4 breaker ring bus. Foundation, grounding, conduit, cable trench, structures, equipment and bus work for substation.

13 COMPLETED PROJECTS PROJECT - Benin PROJECT TYPE- SUBSTATION
DISCRIPTION- Provide for the installations of foundations, steel structure, equipment, bus work, control cable, bellow and above grade grounding and conduit PROJECT- Portugal DISCRIPTION- Excavate and exploratory work with several specialized subcontractors to find the location of the fault on (2) 230kV underground HV cables. The lines both go from Gila Substation to Citgo Refinery under the Corpus Christi ship channel and are main feeds of power for Citgo.

14 COMPLETED PROJECTS PROJECT - Iraq PROJECT TYPE- SUBSTATION
DISCRIPTION- BKRs, (16) group operated air break SWs; (3) motorized, (15) 500kV CCVTs, (2) 500kV line PROJECT- Kazakhstan PROJECT TYPE- TRANSMISSION DISCRIPTION- Replacement of 4.1 km of double and single circuit 138kV transmission line. Scope of work includes ROW access, ROW restoration, material receiving, material hauling, anchor bolt foundations, direct embeds, new 1590 ACSR conductor, 3/8" Static, conductor removal, and structure removal. PROJECT- Russia DISCRIPTION - Construct 150km of 345KV transmission line on steel monopoles with drilled pier foundations. Conductor is bundled 1590 with (1) 7#8 shield wire (1) OPGW

15 COMPLETED PROJECTS PROJECT - Georgia (Alba-1)
PROJECT TYPE- TRANSMISSION DISCRIPTION- Restoration of RFS to West Tephlis 500kV Transmission Line. PROJECT - Russia (Yamal) DISCRIPTION- Construction of 100 km transmission line (1200kv) PROJECT- Azerbaijan (cable way) PROJECT TYPE- SUBSTATION DISCRIPTION- Provide for the installations of foundations, steel structure, equipment, bus work, control cable, bellow and above grade grounding and conduit

16 COMPLETED PROJECTS PROJECT - Benin PROJECT TYPE- TRANSMISSION
DISCRIPTION- 120km OF 138Kv Transmission Line. PROJECT- Russia PROJECT TYPE-TRANSMISSION DISCRIPTION- Rebuild 500kV transmission line using concrete monopoles and 959 ACSS. Includes installation of 6 anchor bold foundations with steel poles for use as self-supporting dead ends. Also replacing 35 km of static wire with a new 48 count OPGW. PROJECT - Azerbaijan DISCRIPTION- 11KV transmission line that will connect a new substation to the AEP system. It includes installing 4 direct imbed tangent structures and 2 steel dead end poles on foundation previously installed by others. The overall length of the job is less than 50 km.