Download presentation
Presentation is loading. Please wait.
1
Budget vs Actual Reporting Tool
2
Budget vs Actual Reporting Tool - Budget
Add filter by description and description as drop down list Ask how access level (cluster level, site level, etc) are changed Budget Summary Lists all budgets created visible to each user’s access level. Starting point in budget encoding using the Create New Budget button
3
Budget vs Actual Reporting Tool - Budget
Add filter by description and description as drop down list Ask how access level (cluster level, site level, etc) are changed
4
BART Budget - Add New Reference
* Add New Reference will register a reference for budget computation. This alone will not add budget to the tool. Select the desired CE Variable Fill up all the required details: Value – Number of units in Sq.M., Slot, Pcs, etc Unit – Unit of measurement (Sq.M., Slot, Pcs, etc) Unit Cost – cost per unit or value Sub Description - Specific description for an item (Slot 1-10, Slot 1-10 Rate Increase, 1-10F Rental, etc) * Reference are used for the following GLs to have computation embedded in the tool: – Building Leases – Facility Maintenance Contracts – Utility Cost (Fixed) HC based GLs – Cleaning – Security – Courier and Postage – Reproduction and Printing
5
BART Budget - Add New Budget
*Add New Budget will register the budget in the tool using a reference for computation or manual input for no reference GLs. Select the desired CE Variable (For both reference and non-reference) Click on Look up – This will display the monthly values from a referenced GL and zero (0) on a non-referenced GL Edit the monthly values for non-referenced GLs Check the monthly values for the referenced GLs. Adjust if necessary Click on save
6
BART Budget - Guidelines
GL Code Cost Element Description Items included Encoding Guideline 630000 Building Leases Building Rental, Storage, etc. Building Rental (Cost per Sq.M) Value: Total Sqm for all floors Unit : Sq.M Unit Cost: Rate per Sqm based on contract Sub Description: Building Rental [Floor number] Period: All months (no rate increase) or months applicable (with rate increase) *For any FY with an increase in rate based on contract: 1. One budget reference should be created for the current/old rate for the applicable months and 2. Another budget reference should be added for the new/updated rate for the months applicable. Parking, Riser Sleeve, Pylon, etc. Parking Rental (Cost per Unit/Slot) Value: Total Slots or Units with the same rate (Charged to AWS only) Unit : Slot/s or Unit/s Unit Cost: Rate per Slot or Unit based on contract Sub Description: Parking [Slot number], Riser Sleeve, etc
7
BART Budget - Guidelines
GL Code Cost Element Description Items included Encoding Guideline 632000 Facility Maintenance - Contracts Common Use Service Area/ Management dues CUSA Value: Total Sqm for floors with same CUSA rate Unit : Sq.M Unit Cost: Rate per Sqm based on contract Sub Description: CUSA [Floor number] Period: All months (no rate increase) or months applicable (with rate increase) *For any FY with an increase in rate based on contract or approved provision for increase: 1. One budget reference should be created for the current/old rate for the applicable months and 2. Another budget reference should be added for the new/updated rate for the months applicable. Preventive maintenance for UPS, fire equipment, data center, PACU, Plant rentals, etc. Encode monthly cost per item using ‘Add New Budget’ only. No need to add reference or computation. 632100, , , Facility Maintenance – Others and Low Value Capital GLs On Call Services, Electrical and Plumbing consumables, repairs and other maintenance New furniture and new equipment less than CAPEX threshold
8
BART Budget - Guidelines
GL Code Cost Element Description Items included Encoding Guideline 634000 Catering Consumables Hot Drinks – Nescafe Hot Drinks – Creamer Sugar, Ice, BCM Food Encode monthly cost per item using ‘Add New Budget’ only. No need to add reference or computation. Expected Monthly Recoveries Recovery amount should be negative. 635000 Utility Cost Fixed Cost Aircon Fixed Cost Value: Total Sqm for floors with same AC rate or Operating Hours Unit : Sq.M Unit Cost: Rate per Sqm based on contract Sub Description: AC Fixed [Floor number] Period: All months (no rate increase) or months applicable (with rate increase) *One reference should be added per total hour of operations (ex. 24 hr, 10, hr, etc) *For any FY with an increase in rate based on contract: 1. One budget reference should be created for the current/old rate for the applicable months and 2. Another budget reference should be added for the new/updated rate for the months applicable. Aircon Extension (Variable)
9
BART Budget - Guidelines
GL Code Cost Element Description Items included Encoding Guideline 635001 Electricity Cost Encode monthly cost per item using ‘Add New Budget’ only. No need to add reference or computation. 635002 Water Cost 635100 Office Cleaning Housekeeping HC Office Cleaner HC Value: Total number of Headcount of Cleaners per Shift and Position Unit : HC Unit Cost: Rate per HC per Shift and Position based on contract Sub Description: [Position and Shift] Period: All months Provision for Wage Increase Mark up of Regular Pay Cleaning Materials, Tools and Equipment Mark up of Materials, Tools and Equipment Overtime Pest Control, Carpet Cleaning, Toilet Fragrance, Trash Bags, etc. 635200 Office Security Security Guard HC Value: Total number of Headcount of Guards per Shift and Position
10
BART Budget - Guidelines
GL Code Cost Element Description Items included Encoding Guideline 635200 Office Security Incentives Security Guard HC Value: Total number of Headcount of Guards per Shift and Position Unit : HC Unit Cost: Rate per HC per Shift and Position based on contract Sub Description: [Position and Shift] Period: All months Provision for Wage Increase Overtime Elevator Operators Encode monthly cost per item using ‘Add New Budget’ only. No need to add reference or computation. 640000 Purchase Consumables Office Supplies Expected Monthly Recoveries Recovery amount should be negative. 641000 Courier and Postage Cost Messenger HC Messenger HC (In house and POC) Value: Total number of Headcount of Messenger per Shift and Position
11
BART Budget - Guidelines
GL Code Cost Element Description Items included Encoding Guideline 641000 Courier and Postage Cost Shared Messenger Cost, Overtime, Courier Charge Encode monthly cost per item using ‘Add New Budget’ only. No need to add reference or computation. Intermec Device, Motorized Cost Intermec and Motorized Cost Value: Total number of Intermec Device, 1 for Motorized Cost Unit : Unit Unit Cost: Rate per Device/ Cost per site for Motorized Cost Sub Description: [Item] Period: All months 642000 Reproduction and Printing Photocopier Rental, Toners Expected Monthly Recoveries Recovery amount should be negative. Photocopier Operator UBIX Operator Value: Total number of Headcount of Copier Operator Unit : HC Unit Cost: Rate per HC based on contract Sub Description: Copier Operator 643000 Other Office Expenses Utensils, Others
12
Budget vs Actual Reporting Tool – PO Management
Lists all Purchase order (POs) created visible to each user’s access level.
13
BART PO Management – Add New PO
* Add New PO will register a PO and will be the reference for PO-based expenses. * Status determines if the goods/service was already delivered/rendered: Approved – PO is already approved but the goods/services are not yet delivered/rendered Delivered/Service Rendered – PO is both approved and the goods/services are delivered/rendered. This is a requisite before an expense can be recorded. Will require a delivery date input * Since delivery date is required before an expense can be recorded, there will be instances that the PO will be tagged as delivered before the actual delivery for accrual purposes. When this happen, please attach a confirmation from the vendor that the delivery will happen before the current month ends, otherwise, C&A will not accept the accrual as valid.
14
Budget vs Actual Reporting Tool – Expense Management
Lists all expense created visible to each user’s access level. Expense are classified into: Invoices – expenses incurred which are already paid Accrual – expenses incurred but are not yet paid
15
BART Expense Management – Add New Expense
* Add New Expense will register an expense (either Invoice or Accrual) for a specific month for both Non-PO and PO items. * Overall there are 4 types of expense that can be recorded: Non-PO Invoice Non-PO Accrual PO Invoice PO Accrual *Status determines if the expense being recorded is an Invoice or Accrual: PO and Non-PO Invoice expenses should have an Invoice number, amount and date PO Expenses will require An existing PO number recorded in the tool The PO itself should be tagged as Delivered/Service Rendered The PO should already have a delivery date * Since delivery date is required before an expense can be recorded, there will be instances that the PO will be tagged as delivered before the actual delivery for accrual purposes. When this happen, please attach a confirmation from the vendor that the delivery will happen before the current month ends, otherwise, C&A will not accept the accrual as valid.
16
End
Similar presentations
© 2025 SlidePlayer.com. Inc.