Presentation is loading. Please wait.

Presentation is loading. Please wait.

July 2004 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG3c Project Timeline] Date Submitted: [13.

Similar presentations


Presentation on theme: "July 2004 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG3c Project Timeline] Date Submitted: [13."— Presentation transcript:

1 July 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG3c Project Timeline] Date Submitted: [13 July 2004] Source: [Reed Fisher]        Company [Oki Electric Industry Co., Ltd.] Address [2514E. Maddox Rd. Buford, GA 30519,USA] Re : [] Abstract:[Description of SG3c Project Timeline] Purpose:[ Development of SG3c work plan] Notice :This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release:The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P Reed Fisher Oki Electric Industry

2 IEEE 802.15.SG3c Project Work Plan
January 2003 doc.: IEEE /056r0 IEEE SG3c Project Work Plan July 2004 May 04 Develop SG work plan Begin discussion of PAR & 5C Draft Call For Applications (CFA) June 04 Issue of official CFA July 04 Hear responses to CFA Begin characterization of applications Begin work on system requirements Continue discussion of PAR & 5C New contributions September 04 Derive Application Requirements from CFA Continue discussion / drafting on PAR & 5C Begin work of channel model Sub-Study Group (SSG) November 04 Draft and submit PAR & 5 Criteria Motion to have PAR & 5C adopted to form Task Group (January 2005) Continue channel model SSG activities Reed Fisher Oki Electric Industry

3 IEEE 802.15.SG3c Project Timeline
July 2004 IEEE SG3c Project Timeline 2004 2005 May Interim June July Plenary September November January March SG TG Work Plan Revision Draft CFA Issue CFA Hear CFA responses Technical Requirement / Selection Criteria Application Requirement Develop PAR & 5Criteria Motion SG to TG Channel Model Definition Reed Fisher Oki Electric Industry


Download ppt "July 2004 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG3c Project Timeline] Date Submitted: [13."

Similar presentations


Ads by Google