1
Vanderbilt Senior Design Project
AMCOM Digital Archive Vanderbilt Senior Design Project
2
Presentation Topics Review of this Week’s Milestones Hardware Update
Software Update Next Week’s Milestones
3
Status of this Week’s Milestones
February 8, 2005 Website progress report and last week’s presentation posted – Jostin Weekly presentation – Jon Functional implementation schedule complete - Bill
4
Current Video Architecture
Camera DV-Deck Monitor Splitter (1/cam) Patch Panel Coax/Fiber Fiber/Coax Conf. Camera DV-Deck Monitor Coax/Fiber Fiber/Coax Conf. Camera DV-Deck Monitor Coax/Fiber Fiber/Coax Conf. Camera DV-Deck Monitor Coax/Fiber Fiber/Coax Conf. RG-59 Cable Cat 5 Cable
5
DV Deck Input/Output
6
DV Deck Input/Output
7
DV Deck Input/Output
8
DV Deck Input/Output
9
IO Industries Quote Streams Software Manufacturer
Based in London, ON Canada System quoted will support 4 S-video inputs 4 Euresys Picolo cards Capture software (Streams 5) Record for a maximum duration of 20 minutes Quotation Price $8,844 (Non-GSA Pricing) IO Industries Quote Sheet
10
Pelco DX8000 Quote System quoted will support Quotation Price
8 BNC-video & audio inputs Can be upgraded to 16 inputs Allows for playback while recording Includes remote PC, Web, and Handheld Client Software Proprietary Technology with AVI Export Feature 80 GB HDD 48 Hour Delivery Quotation Price $6,712 (Non-GSA Pricing from a local small business) Pelco has GSA Pricing
11
Venom Application Scope of the application
Will implement the core functionality of the overall system needed Create a new test record with basic test parameters Date of test Test Name Manufacturer Requestor Test Type Add test data to the test record Provide method to find a test and download the associated test data
12
Venom Application Rough Draft of Functional Specification Complete
Consolidated the Architectural Specification and the Functional Specification into a single document Copies available on the website
13
Venom Application Coding of the basic framework of the application has begun Need asp scripting available on our website to demonstrate the application
14
Next Week’s Milestones
February 15, 2005 Development environment setup complete including application server, data storage server, client computer, and connection to the Internet – Jostin, Ryan, Jon Phase 1, Phase 2, and Phase 3 quality assurance documents complete - Ryan Website progress report and last week’s presentation posted – Jostin Weekly presentation – Jostin