Download presentation
Presentation is loading. Please wait.
1
Work Review and Plan China App Support
Han Chenglong 2017/4
2
Contents 2016 Work Summary 2016 Highlights 2017 Work Plan
3
Work Summary
4
2016 Testing Highlights Reclassified the test equipment and store
Optimized the China IQA test procedure Rewrote the towing-truck hands-on training
5
2016 App Support Highlight-Training
AE basic and advanced training AE Control monthly sharing Towing-truck hands-on AE training
6
2016 AE Support Highlight-Advisor 6
270+ FR are ready to use in Advisor 6 Released Advisor 6 to CCI and JVs Advisor 6 training for CCI
7
2016 App Support Highlight-FE
VPI CE workshop(Data for CE, SRD and M review) App Support FE meeting(MCAD process and checklist, Advisor 6 & Function Plan)
8
2016 AE Support Highlight-VPI
Gas engine CE leader: L8.9G and B6.7G Industrial engine CE leader: QSF2.8 Automotive engine CE leader: ISF4.5 AE Support: QSL9.3, ISG12G and so on
9
Work Plan - 2017 - Test Implement China IQA test procedure
Enforce the JSA pre-travel process Improve technicians’ capability following skill matrix Add aftertreatment procedure into IQA test procedure Standardize AE IQA test report
10
Work Plan - 2017 - App Support
Enforce VPI CE FE(Data for CE, SRD and M review) Promote Advisor 6 in China and translate CEB Training: AE basic, advanced, hands-on, monthly control Optimize AE basic training content Hold App Support and VPI CE FE meetings
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.