Presentation is loading. Please wait.

Presentation is loading. Please wait.

Town Hall briefing to the AMTSO membership

Similar presentations


Presentation on theme: "Town Hall briefing to the AMTSO membership"— Presentation transcript:

1 Town Hall briefing to the AMTSO membership
Standards and Operational Pilot Update November 7, 2017 Town Hall briefing to the AMTSO membership

2 Town Hall Meeting Agenda
Introducing Our Members Web Site Reminder : Contact List Registration Operational Pilot Updates Test Plan Templates and Usage Guidelines Voluntary and Involuntary Attestations Compliance Confirmation Revised Standards (Draft 6) Information Remaining Areas of Confusion Your Questions Heading to Beijing

3 AMTSO Documentation and Artifacts
AMTSO Members Web Site

4

5 Operational Pilot Updates
AMTSO Operational Pilot (May 2017-November 2017) Operational Pilot Updates

6 Test Plan Templates Multiple Test Plan Creation Tools Tested
Word Edition (Produces DOC/PDF Files) On-Line Edition (Produces CSV Files) 6 Test Plans Built During Operational Pilot AV-Comparatives (3 Test Plans, 3 Tests) Mac, Mobile, Business SE Labs (1 Test Plan, 3 Tests) Endpoint (Consumer, SMB, Enterprise) SKD Labs (1 Test Plan, 1 Test) Endpoint (Consumer, China Market) AppEsteem/AV-C (1 Test Plan, Commissioned) Deceptor Test

7 Test Plan Structure Introduction Scope Methodology Participation
Environment Schedule Control Procedures Dependencies Scoring Process Dispute Process Tester Attestations On-Line Change Submission Process

8 Voluntary / Involuntary Feedback
Different Presentations Required < 2 Minutes for Voluntary Participants Meets the Posting Feedback Requirements

9 Compliance Confirmation
~50 Checklist Items Compares all Test Artifacts against Standard Relaxed requirements for publishing links Operational Pilot Confirmed Compliant Tests AV-Comparatives 2017 Mac Security Review SE Labs Q Endpoint Security Test AV-Comparatives 2017 Mobile Security Review

10 One-Page Test Review Summary
Test Plan At-a-Glance Feedback Click-Through Interface to Drill-Down for Detailed Feedback Tester Report Links Compliance Report

11 AMTSO Testing Standards and Change Control
Revised Draft 6

12 Standards Draft 6 Open Comment Period through November 15th
Detailed Change Logs Available on Web Site Change Process Followed with SWG Key Updates Section – Added definition of Fair, based on outcome of SWG Section 7.3 – Added requirement for “fairness” (aka common courtesy) in tester/vendor communications Section – Added informative reference for clarity Section – Updated language and added informative reference for clarity Section – Moved example out into informative reference and expanded for clarity

13 Clarifying Areas of Confusion
AMTSO Questions and Answers Clarifying Areas of Confusion

14 Voluntary and Involuntary
All participants are initially Involuntary Must opt-in to a test to be Voluntary Voluntary Participant : A Participant who has chosen to cooperate with the Tester on the Test in the manner designated in the Test Plan, and has complied with the Voluntary Participant requirements set forth in Section 7 of the Standards. A Voluntary Participant may cease complying with the requirements at any time and become Involuntary once again.

15 Process Too “Heavyweight”
Required < 2 Man-Days Tester Time Voluntary Attestations < 2 Minutes Per Test Compliance Review and Report < 1 Man-Day Continue to Automate Mailings and Workflow post-Pilot Phase

16 Your Questions Heading to Beijing


Download ppt "Town Hall briefing to the AMTSO membership"

Similar presentations


Ads by Google