Download presentation
Presentation is loading. Please wait.
1
Setting up campaign pages in Synkron Via
Campaign pages - setting up Synkron Via pages - January 2015, Catharina Brodka, AMD Campaign pages Setting up campaign pages in Synkron Via
2
Campaign pages - setting up Synkron Via pages - March 2015, Catharina Brodka, AMD
Introduction When setting up the new campaign pages it is important to stay focused on the purpose of the campaign pages The overall goal is to increase the conversion of site visitors. When creating landing pages it should be a focus to utilise a module based approach where each module has focused intent. This ensures a clean landing page structure where values and conversion points are presented clearly. The following examples of setup is based on the Home Owner Initiative (HOI) but the campaign pages are relevant to used in connection to any campaign.
3
Campaign pages - setting up Synkron Via pages - January 2015, Catharina Brodka, AMD
Module based approach A module consist of a clearly outlined content-element or feature. Each module must have a specific intent and main action (Not necessarily a conversion CTA) By creating a base of reusable modules it will be easy to compose and create new landing pages Each landing page should be composed in a way that emphasise the main value points and CTA’s of the specific page. Different types of page compositions can be determined (e.g. Front page and Subpage)
4
Text Texts are delivered by Marketing Communication
Campaign pages - setting up Synkron Via pages - January 2015, Catharina Brodka, AMD Text Texts are delivered by Marketing Communication The text should be considered as a sample text to illustrate how we try to keep it short and to the point Be aware that the content should be check against local conditions and adjusted accordingly.
5
Example – HOI campaign Sample page has been set up
Campaign pages - setting up Synkron Via pages - January 2015, Catharina Brodka, AMD Example – HOI campaign Sample page has been set up Main page: 4in1: Installation guide: Installer search: RW-DE live page Main page: 4in1: Installation guide: Installer search: Dealer search:
6
Campaign pages - setting up Synkron Via pages - January 2015, Catharina Brodka, AMD
New elements For the new campaign landing pages two new dcoument types and one new content layout grid have been created Document: Landingpage top element Document: Landingpage content element Content layout grid: Ladning page (1 column content full width) All the pages for your campaign should be set up using the new grid Most content on the page is set up using the two new document types Additional custom HTML and standard boxes are used Custom HTML code will be delivered by Digital Media The documents are reused across the 4 pages All content elements should be placed in the full width content area
7
Front page Landingpage top element ddBoxed content: Standard box
Campaign pages - setting up Synkron Via pages - January 2015, Catharina Brodka, AMD Front page Landingpage top element ddBoxed content: Standard box HTML from Delaer Finder Landingpage content element HTML, custom
8
4in1 (subpage 1) Landingpage top element HTML, custom
Campaign pages - setting up Synkron Via pages - January 2015, Catharina Brodka, AMD 4in1 (subpage 1) Landingpage top element HTML, custom HTML from Delaer Finder Landingpage content element HTML, custom ddBoxed content: Standard box
9
Installer guide (subpage 2)
Campaign pages - setting up Synkron Via pages - January 2015, Catharina Brodka, AMD Installer guide (subpage 2) Dd HTML, custom HTML, custom (only shown on mobile version Landingpage content element HTML from Delaer Finder ddBoxed content: Standard box
10
Installer search (subpage 3)
Campaign pages - setting up Synkron Via pages - January 2015, Catharina Brodka, AMD Installer search (subpage 3) Landingpage top element HTML from Delaer Finder Landingpage content element HTML, custom HTML, custom Dd Boxed content: Standard box
11
Landingpage top element
Campaign pages - setting up Synkron Via pages - January 2015, Catharina Brodka, AMD Landingpage top element The following settings are possible to get the correct look Placement of text (left, right, center) Heading and subheading: Use HTML tagging for bold and line breakes: Bold: <b></b> Breake: <b/> Link: Will create a link in a green button Wistia movie id: Will create an additional link button next to the green one to play the video Background image: Will be shown as backgorund image untill the movie plays
12
Landingpage content element
Campaign pages - setting up Synkron Via pages - January 2015, Catharina Brodka, AMD Landingpage content element Textblock allignment: Placement of the text element Subheading Subheading image: image to the left of the subheading Heading Heading image: Image to the left of the heading Text Link list: 1. link will crate green button, 2. link will create a more discreate link to the right of the 1. link Image: Image placet next to the text Blob text: Will create a black boble in upper right corner of image Use HTML tagging for bold and line breakes: Bold: <b></b> Breake: <b/> Wistia HTML: To use videos instead of images
13
Campaign pages - setting up Synkron Via pages - January 2015, Catharina Brodka, AMD
Installer search The installer search is using the installer search from Dealer Finder There should be created separate maps for desktop and mobile versions The installer search is inserted in Synkron Via using the XHTML document To createt the code for the XHTML document, please follow the instructions in the document ”Installer_Search_Instructions_HOI”
14
Videos We are using the tool Wistia for the videos
Campaign pages - setting up Synkron Via pages - January 2015, Catharina Brodka, AMD Videos We are using the tool Wistia for the videos The 4in1 videos have already been uploaded by to Wistia by Digital Media The code for the 4in1 videos are provided by Digital Media as a part of the Web content package For the top banner the video (tv spot) needs to be uploaded to Wistia You can request Catharina Brodka for a login to Wisita
15
Campaign pages - setting up Synkron Via pages - January 2015, Catharina Brodka, AMD
3 Inserting 4in1 videos 4 Create a ”landingpage content” document Choose placement of the text box Add a subheading Add a subheading image. E.g. DURABILITY-icon_22x20px Add a heading Add a text Add a link to the page the installer page Use a anchor to link directly to the search on the page, e.g. If you find it relevant you can add a second link. We reccomend that only the first link is used Take the code for the video provided by Digital Media, e.g. the code ”Durability_video_code” and add it to the filed marked with ”8” Click OK 5 6 7 8
16
Inserting the tv-spot topbanner
Campaign pages - setting up Synkron Via pages - January 2015, Catharina Brodka, AMD Inserting the tv-spot topbanner 2 3 Create a ”Landingpage top element” document Choose placement of the text Add a heading. E.g. <b>Save money<br/> throughout the winter</b> Add a subheading Add a link text Insert a link to the Installer page Use a anchor link like Insert the ID for the Wistia video Insert the text for the View video button Insert a background image 4 5 6 7 8 9
17
How to get the ID for Wistia videos
Campaign pages - setting up Synkron Via pages - January 2015, Catharina Brodka, AMD How to get the ID for Wistia videos Login to Wistia If you don’t already have a login, please request one with Catharina Brodka Go to the project folder where the video is placed Click on the video Go to the Video Action menu >> Choose Embed & Share Choose ”Inline Embed” Copy the code into a note page >> Then copy the last part of the ID: <div id="wistia_izckqpjv0s“ and insert it into the Synkron document
18
Campaign pages - setting up Synkron Via pages - January 2015, Catharina Brodka, AMD
Top banner 3D house On the Installation Guide page the top banner has a 3D house with hotspots. This is set up using a custom HTML. In the document ” Top-banner_Installtion-guide_3D-house_code” you’ll find the code Make relevant local text adjustments Implement the code using a XHTML document On the mobile version these hotspots are not active Instead the number elements are used. This is set up a XHTML document only to be shown on the mobile The code can be found in the document ” Number-row_Installer-page_code”
19
USP element and Guides & inspiration
Campaign pages - setting up Synkron Via pages - January 2015, Catharina Brodka, AMD USP element and Guides & inspiration These two elements are set up using HTML code The HTML code is provided by Digital Media Text and links for images and files should be localy adjusted USP element You can choose to link to e.g. the 4in1 videos on the 4in1 page You insert the link on the images and make a anchor link to the videos You also shoose to let the USP stand alone with the text, without linking. Guides & inspiration Please select the 4 borchure that is relevant for you The link to the brochure should be taken from Umbraco Link to the brochures in both the link text and in the image
20
Anchor linking – Installer Search
Campaign pages - setting up Synkron Via pages - January 2015, Catharina Brodka, AMD Anchor linking – Installer Search In the code for the installer search you can set the anchor name. This can be named anything and wlll server as the anchor It needs to be set three places in the code The anchor will then e.g. be #installerSearch The anchor will then be added at the end of URL that the anchor element is placed on, e.g. :
21
Anchor linking – content element
Campaign pages - setting up Synkron Via pages - January 2015, Catharina Brodka, AMD Anchor linking – content element To create a anchor link to a content element add the anchore name you like to the fiels ”Anchor” The anchor will then e.g. be #1_Dach-von-aussen The anchor will then be added at the end of URL that the anchor element is placed on, e.g. : If linking within the same page you’ll just insert the anchor #1_Dach-von-aussen
22
Inserting anchor links – top element
Campaign pages - setting up Synkron Via pages - January 2015, Catharina Brodka, AMD Inserting anchor links – top element Take the anchor link to the installer serach created earlier Insert the link in the link destination
23
Inserting anchor links – content element
Campaign pages - setting up Synkron Via pages - January 2015, Catharina Brodka, AMD Inserting anchor links – content element Take the anchor link to the installer serach created earlier Insert it as the first link in the link list
24
Inserting anchor links – 3D house top element
Campaign pages - setting up Synkron Via pages - January 2015, Catharina Brodka, AMD Inserting anchor links – 3D house top element To link the numbers in the house to the elments below you will need to insert a anchor link Take the anchor link to the content element created earlier Insert into the XHTML code the anchor, e.g. #1_Dach-von-aussen
25
Mobile setup The following elements has a special setup for mobile
Campaign pages - setting up Synkron Via pages - January 2015, Catharina Brodka, AMD Mobile setup The following elements has a special setup for mobile Installer Search Number element: Is inserted on the mobile version and the hotspots in the house no longer works
26
Campaign pages - setting up Synkron Via pages - January 2015, Catharina Brodka, AMD
Tracking When setting up a campign landing page make sure you have the relevant tracking Adobe Analytics, heat map, campaign tracking (banner, SEM etc.) Analyse the performance througout the life time of the campaign to make sure it performance as expected. Adjust the content if needed to improve performance
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.