Download presentation
Presentation is loading. Please wait.
Published by아셩 여 Modified over 6 years ago
1
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples
2
Pigi Paolucci, I.N.F.N. of Naples
RPC Barrel I.N.F.N. Naples HV system ~ 480 channels config. param. = 8 cond. param. = 11 LV system ~ 750 channels Temperature ~ 300 channels Front End ~ 4680 Front-End Boards config. param. = Threshold & Width cond. param. = Rate/Occupancy histograms 21/09/2018 Pigi Paolucci, I.N.F.N. of Naples
3
9.360 Threshold + 9.360 width + 4.680 temp.
Front-End Board Data I.N.F.N. Naples Barrel FEB is equipped with 2 front-end chips (8 strips each) and 1 temperature sensor. For each chip there are: 2 threshold value (hardware defaults of 200 mV); 2 width values (hardware defaults of 100 ns); 1 temperature value. How many operations/bytes do we need to read/write this parameters ?? Read width/thresh. 2 write + 1 read 5 bytes Read temperature 2 write + 1 read 5 bytes Write width/thresh. 3 write 6 bytes TOTAL number of FEB parameters are 9.360 Threshold width temp. 21/09/2018 Pigi Paolucci, I.N.F.N. of Naples
4
RPC Barrel configuration Data
I.N.F.N. Naples Barrel RPC detector is equipped with 480 HV channels and with 780 LV channels. To configure the detector we need to set: Vset, Vmax, Iset, Imax, Trip, Rup, Rdown, On/Off. HV & LV configuration requires about 1260 ch * 8 par. = par * 2 bytes = 20 KB FEB configuration requires about 3.4 Kbytes per Link Board corresponding to 2 MB. 21/09/2018 Pigi Paolucci, I.N.F.N. of Naples
5
RPC configuration states
I.N.F.N. Naples The RPC detector will have “at least” 3 different configuration states (data, calibration, “injection/safe”); Plateau calibration needs from 5 to 7 runs with different configuration parameters (HV set-points) when the others muon systems are working/triggering in “normal mode”. Noise calibration runs (?) needs few runs with different FEB thresholds but fixed HV set-points. 21/09/2018 Pigi Paolucci, I.N.F.N. of Naples
6
Pigi Paolucci, I.N.F.N. of Naples
DCS connection Schema I.N.F.N. Naples SY1527 20 CANbus lines XDAQ PVSS 12 CANbus lines splitter HV crates LV + Temp LB crate Detector LV + Temp LB crate I2C I2C FEB 1 optical fibers per Master Link Boards ~ 300 fibers (barrel) LV + Temp LB crate LV + Temp LB crate I2C I2C FEB 21/09/2018 Pigi Paolucci, I.N.F.N. of Naples
7
Pigi Paolucci, I.N.F.N. of Naples
Link Board Schema 21/09/2018 Pigi Paolucci, I.N.F.N. of Naples
8
96 channels + 96 channels + 96 channels
Electronic architecture barrel sectors 5 MasterLinkBoards SlaveLinkBoards 1 SLB 1 SLB RB4 96 channels 96 channels 1 MLB 1 MLB RB3 96 channels 96 channels 1 SLB 1 SLB 1 MLB 96 channels + 96 channels + 96 channels RB2 1 SLB 1 SLB 96 channels + 96 channels 1 SLB 1 SLB 96 channels + 96 channels RB1 1 MLB 1 MLB 96 channels + 96 channels Box MLB SLB Sec 4-10 1 5 10 Other sec 8 Wheel 12 60 Barrel 300 500 5 optical links/sectors 60 optical link/wheel 300 optical link barrel
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.