Download presentation
Presentation is loading. Please wait.
Published byEric Parsons Modified over 6 years ago
1
Graduate Circle Housing Proposal for the Pennsylvania State University
BY The Lasso Corp 100 Kunkle Lounge University Park PA 16802
2
Presentation Overview
Section 1- Team Introduction Section 2- Site Investigation Section 3- Estimate Overview Section 4- Schedule Review Section 5- Construction Plan
3
Team Introduction
4
Project Executive Chris Stultz Team Introduction Site Investigation Estimate Overview Schedule Review Construction Plan Project Manager- 3D Modeler Jonathan Nelson Schedule Superintendent Adam De Luca Estimation Superintendent Scott Earley Org chart Team intro Contact Info Pictures Site Superintendent Hamad Alrahmani 100 Kunkle Lounge University Park PA 16802
5
Site Investigation “Digging into the past to build the future.....”
6
Proposed Site Topography Existing Structures
Team Introduction Site Investigation Site Investigation Building Description & Geometry Project Background Value Engineering Estimate Overview Schedule Review Construction Plan Vehicular Access Pedestrian Access Topography Existing Structures Maintenance Bldg. Lot to be removed 100 Kunkle Lounge University Park PA 16802
7
Façade Material and Features
Team Introduction Site Investigation Site Investigation Building Description & Geometry Project Background Value Engineering Estimate Overview Schedule Review Construction Plan Structural System Façade Material and Features Other Systems 100 Kunkle Lounge University Park PA 16802
8
Floor GSF Units Plan Geometry and Sizes Basement 430 1 26,248 39 2
Team Introduction Site Investigation Site Investigation Building Description & Geometry Project Background Value Engineering Estimate Overview Schedule Review Construction Plan Floor GSF Units Basement 430 1 26,248 39 2 28,298 52 3 27,881 4 4,165 7 Loft Area 3,913 Total 90,935 150 Building Perimeter 1,380 LF Façade Surface Area 53,000 SF 100 Kunkle Lounge University Park PA 16802
9
Team Introduction Site Investigation Site Investigation Building Description & Geometry Project Background Value Engineering Estimate Overview Schedule Review Construction Plan 100 Kunkle Lounge University Park PA 16802
10
Electrical & Mechanical
Foundation Team Introduction Site Investigation Site Investigation Building Description & Geometry Project Background Value Engineering Estimate Overview Schedule Review Construction Plan Structure Exterior Interior Layout Electrical & Mechanical 100 Kunkle Lounge University Park PA 16802
11
Estimate Overview “Putting a price on your ideas…”
Insert picture of cpm schedule “Putting a price on your ideas…”
12
Staffing Plan Team Introduction Site Investigation Estimate Overview Staff and General Conditions Monitor Project Estimate Schedule Review Construction Plan Project estimate to include general conditions, steel, concrete During presentation mention justification Make sure to justify fee 100 Kunkle Lounge University Park PA 16802
13
Structural Concrete Team Introduction Site Investigation Estimate Overview Staff and General Conditions Monitor Project Estimate Schedule Review Construction Plan Project estimate to include general conditions, steel, concrete During presentation mention justification Make sure to justify fee $1,264,771.72 100 Kunkle Lounge University Park PA 16802
14
Structural Steel $1,447,307.52 Total Structure = $2,712,079.24
Team Introduction Site Investigation Estimate Overview Staff and General Conditions Monitor Project Estimate Schedule Review Construction Plan Project estimate to include general conditions, steel, concrete During presentation mention justification Make sure to justify fee $1,447,307.52 Total Structure = $2,712,079.24 100 Kunkle Lounge University Park PA 16802
15
100 Kunkle Lounge University Park PA 16802
Team Introduction Site Investigation Estimate Overview Staff and General Conditions Monitor Project Estimate Schedule Review Construction Plan Project estimate to include general conditions, steel, concrete During presentation mention justification Make sure to justify fee 100 Kunkle Lounge University Park PA 16802
16
Schedule Review “Timing is everything.....”
Insert picture of cpm schedule “Timing is everything.....”
17
Team Introduction Site Investigation Estimate Overview Schedule Review CPM Schedule Narrative Cash Flow Projection & Payment Schedule Schedule Risks Construction Plan Substantial Completion: December 18, 2009 Building Turnover: December 21, 2009 100 Kunkle Lounge University Park PA 16802
18
Methods Employed to Compress Schedule:
Team Introduction Site Investigation Estimate Overview Schedule Review CPM Schedule Narrative Cash Flow Projection & Payment Schedule Schedule Risks Construction Plan Phase 1- 20% Phase 2- 30% Phase 3- 50% Methods Employed to Compress Schedule: Multiple Crews Well Defined Sequence of Trades Minimal Lag Time between Activities Consistent Steel Members Prefabrication of Trusses and Other Systems 100 Kunkle Lounge University Park PA 16802
19
Team Introduction Site Investigation Estimate Overview Schedule Review CPM Schedule Narrative Cash Flow Projection & Payment Schedule Schedule Risks Construction Plan 100 Kunkle Lounge University Park PA 16802
20
Team Introduction Site Investigation Estimate Overview Schedule Review CPM Schedule Narrative Cash Flow Projection & Payment Schedule Schedule Risks Construction Plan 100 Kunkle Lounge University Park PA 16802
21
Construction Plan “Coordinating safety and production.....”
22
Site Utilization Plan: Phase 1
Unexcavated Earth Team Introduction Site Investigation Estimate Overview Schedule Review Construction Plan Site Plan Phase Phase Phase 3 Waste Removal & Recycling Steel Sequence Plan Hazard Analysis & Safety Plan Site Utilization Plan: Phase 1 100 Kunkle Lounge University Park PA 16802
23
Site Utilization Plan: Phase 2
Unexcavated Earth Team Introduction Site Investigation Estimate Overview Schedule Review Construction Plan Site Plan Phase Phase Phase 3 Waste Removal & Recycling Steel Sequence Plan Hazard Analysis & Safety Plan Site Utilization Plan: Phase 2 100 Kunkle Lounge University Park PA 16802
24
Site Utilization Plan: Phase 3
Team Introduction Site Investigation Estimate Overview Schedule Review Construction Plan Site Plan Phase Phase Phase 3 Waste Removal & Recycling Steel Sequence Plan Hazard Analysis & Safety Plan Site Utilization Plan: Phase 3 100 Kunkle Lounge University Park PA 16802
25
Waste & Recycling Containers
Team Introduction Site Investigation Estimate Overview Schedule Review Construction Plan Site Plan Waste Removal & Recycling Steel Sequence Plan Hazard Analysis & Safety Plan Waste & Recycling Containers Animation on click for enlarged loading dock plan Animation on another click for dumpster circles 100 Kunkle Lounge University Park PA 16802
26
Building Sequencing Steel and Concrete Sequence
Team Introduction Site Investigation Estimate Overview Schedule Review Construction Plan Site Plan Waste Removal & Recycling Sequence Plan Overall Building Sequence Steel Sequence Hazard Analysis & Safety Plan Steel and Concrete Sequence Roof and Envelope Sequence Interior Trades Sequence 100 Kunkle Lounge University Park PA 16802
27
Steel Sequence Steel Sequence: Starting Bay
Team Introduction Site Investigation Estimate Overview Schedule Review Construction Plan Site Plan Waste Removal & Recycling Sequence Plan Overall Building Sequence Steel Sequence Hazard Analysis & Safety Plan Steel Sequence: Starting Bay Steel Sequence: Progression through Building 100 Kunkle Lounge University Park PA 16802
28
Team Introduction Site Investigation Estimate Overview Schedule Review Construction Plan Site Plan Waste Removal & Recycling Steel Sequence Plan Hazard Analysis & Safety Plan Hazard Analysis Activities Hazard Safety Plan The public parking lot is close to the construction site Construction equipment noise and vibrations Inclement Weather Football games welcome a lot of people to the campus The trees located between the buildings and in the way of crane swings Any debris could inflict damage onto the surround vehicles This could disturb classrooms or laboratories nearby Equipment or materials could cause harm if weather were to get out of hand Any wondering intoxicated fans that could potentially injure themselves at the site. Theft or vandalism could also occur on the site The crane or the pick may be knocked loose or become damaged putting workers in the area at risk Eliminate the option to park in the spaces that could be hit by any material. Utilize the unused space to park non-necessary contractor vehicles offsite to allow more space on site Operate loud machinery during times convenient to the buildings nearby after consulting with building occupants Monitor weather conditions actively from site trailers and cease crane operations during potentially hazardous situations. Put up necessary barriers to prevent any intrusion and provide a security detail during high attendance events on east campus Avoid pick paths that require crane swings in the areas of the trees. If picks are necessary, ensure proper elevation of pick to avoid collisions 100 Kunkle Lounge University Park PA 16802
Similar presentations