Download presentation
Presentation is loading. Please wait.
1
AMS 02 Electronics TRD Crate Arrangement
Mike CAPELL Senior Research Scientist Massachusetts Institute of Technology TRD Meeting, CERN - July ‘02 M.Capell July 2002 AmsE TRD Crates
2
TRD Crate Arrangement (1/4) : on ISS
3+ years on ISS (altitude=400km) M.Capell July 2002 AmsE TRD Crates
3
TRD Crate Location (2/4) : on AMS
Crates are arranged in rows, Fixed to the USS, Supporting the radiators M.Capell July 2002 AmsE TRD Crates
4
TRD Crate Location (3/4) M.Capell July 2002 AmsE TRD Crates
5
TRD Crate Location (4/4) UGB PORT STAR. M.Capell July 2002
CAB CVB TTCS hole CCEB PORT STAR. M.Capell July 2002 AmsE TRD Crates
6
TRD U-Crate Mechanics M.Capell July 2002 AmsE TRD Crates
7
Board Mechanics (stiffener optional)
M.Capell July 2002 AmsE TRD Crates
8
UPD Mechanics M.Capell July 2002 AmsE TRD Crates
9
TRD Electronics Mechanics
Flight Design Locations 2 U-Crates (Wake Up, Ram Up) Centered in row per TRD request. 2 UPD (Wake Port, Ram Port) Symmetrically located near to U-Crates 1 UG-Crate (Wake Up) Near to UGB(S,C) 1 UGPD (Wake Port) Near to UG-Crate M.Capell July 2002 AmsE TRD Crates
10
21 Slot Crate (as T-Crate) contains:
U-Crate 21 Slot Crate (as T-Crate) contains: M.Capell July 2002 AmsE TRD Crates
11
11 Slot “xPD”, contains 9pr DC-DC
UPD 11 Slot “xPD”, contains 9pr DC-DC Not the same as TPD ! M.Capell July 2002 AmsE TRD Crates
12
11 Slot Crate (as S-Crate?):
UG-Crate 11 Slot Crate (as S-Crate?): Assuming single width cards. M.Capell July 2002 AmsE TRD Crates
13
7 Slot “xPD”?, contains 5pr DC-DC ?
UGPD 7 Slot “xPD”?, contains 5pr DC-DC ? M.Capell July 2002 AmsE TRD Crates
14
M.Capell July 2002 AmsE TRD Crates
15
Crate Design Status – Drawings exist:
M.Capell July 2002 AmsE TRD Crates
16
Crate Design Status – Crate Exists (CSIST, TW)
M.Capell July 2002 AmsE TRD Crates
17
24 Slot “J-Crate” produced. Few problems to clear up
Crate Design Status 24 Slot “J-Crate” produced. Few problems to clear up Complicated surface treatment (electrical vs thermal requirements) under review at CGS. Slots for “EMI” plates very difficult to machine. Drop for next version of crates – wait for QM results. Drawings for U, UG Crates could be ready “soon”. M.Capell July 2002 AmsE TRD Crates
18
xPD Design Status – Drawings started.
M.Capell July 2002 AmsE TRD Crates
19
Drawings started based on FlightDesign Tables for TPD.
xPD Design Drawings started based on FlightDesign Tables for TPD. Complete set reviewable by 1 Sept. Need input from xPD responsibles (btw – who is that for UPD?). M.Capell July 2002 AmsE TRD Crates
20
Crate and xPD production:
CSIST has agreed to produce: Mechanics: 4 U-Crates + 4 UPDs (nothing for UG, UGPD) M.Capell July 2002 AmsE TRD Crates
21
RWTH has agreed to produce:
Crate & xPD Production RWTH has agreed to produce: 2 U-Crates (“QM1”, =EM?) 0? UPD 3? UG-Crates (EM=QM, FM, FS?) 3? UGPD (ditto). Crate Production (1 U & 1 UG) could start Sep ’02 ? (assume number of slots fixed) xPD Production (0? UPD & 1 UGPD) Could start Q4 ’02 ? (assuming contents fixed) M.Capell July 2002 AmsE TRD Crates
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.