Presentation is loading. Please wait.

Presentation is loading. Please wait.

Organization of ATLAS computing in France

Similar presentations


Presentation on theme: "Organization of ATLAS computing in France"— Presentation transcript:

1 Organization of ATLAS computing in France
ATLAS visit to CC-Lyon, Apr. 2007 Eric Lançon

2 French Labs in ATLAS IN2P3 : CEA : Total of 103 PhD holders (M&O)
Annecy Clermont-Ferrand Grenoble Marseille Orsay LPNHE-Paris CEA : Saclay Total of 103 PhD holders (M&O) ~220 ATLAS accounts at Computer Center Members of /atlas/fr VO group : ~70 ATLAS visit to CC-Lyon, Apr. 2007 Eric Lançon

3 Calcul ATLAS France (CAF) - I
1-2 members / lab Computer Center (CC) ATLAS contact (Ghita Rahal) Regular meetings At CC With CC staffs And recently with Japanese colleagues ~15 people ATLAS visit to CC-Lyon, Apr. 2007 Eric Lançon

4 Calcul ATLAS France (CAF) - II
User support : Twiki on ATLAS environment at CC to help physicists ATLAS-operation meetings : Constant presence To insure feedback And communication ATLAS visit to CC-Lyon, Apr. 2007 Eric Lançon

5 ATLAS FR Sites Tier-2 Tier-1 GRIF CC-Lyon AF CC-Lyon Tier-3 LAPP
CEA/DAPNIA LAL LLR LPNHE IPNO Tier-1 CC-Lyon Strasbourg AF CC-Lyon Ile de France Nantes Clermont-Ferrand Tier-3 LAPP Tier-2 LPC Annecy Lyon Marseille Tier-3 CPPM ATLAS visit to CC-Lyon, Apr. 2007 Eric Lançon

6 2006 MC production on FR-sites
jobs 15% of LCG wall-time ATLAS visit to CC-Lyon, Apr. 2007 Eric Lançon

7 MC production on the FR Cloud
Executor (CondorG) at CC Operated by team of ~5 people One shifter (2-3 weeks rotation) One expert in backup (Jerome Schwindling) 80% of CC resources for production (batch priority) Dedicated monitoring tools developed on top of standard ones 2007 stat. 14% outside .fr Efficiency vs time ATLAS visit to CC-Lyon, Apr. 2007 Eric Lançon

8 List of tasks assigned to FR-cloud
Select task details Task status ATLAS visit to CC-Lyon, Apr. 2007 Eric Lançon

9 DDM Organization : We want to have all AODs at the Tier-1
Experts : Stephane + Ghita Plus 2-3 rotating people, mainly for cleaning DDM leftovers We want to have all AODs at the Tier-1 Where the Analysis Facility will be Precise AOD placement policy within cloud under discussion ATLAS visit to CC-Lyon, Apr. 2007 Eric Lançon

10 Ongoing activities Joint meeting with BNL and FZK, May 22-23
Test of PANDA at Lyon (Torre Wenaus) Investigating : Xrootd Proof for interactive analysis ATLAS visit to CC-Lyon, Apr. 2007 Eric Lançon

11 Concerns ROOT/DPM problem for data analysis in T2s
dCache/srm instability DDM : Lack of monitoring tools (what is transferred by whom, why dataset is not complete?) Time delay between file registering and physical presence on device Disk cleanup (RDOs remain on DISK when task finished) Increase of resources (Memory, Event size) Roles in FTS (for writing in T2s) Releases (number and cycles) /afs space to be watched What about xrootd? More information needed on what is going on and when ATLAS visit to CC-Lyon, Apr. 2007 Eric Lançon


Download ppt "Organization of ATLAS computing in France"

Similar presentations


Ads by Google