Download presentation
Presentation is loading. Please wait.
1
Council Rock High School South
Construction Information Construction Started – September Scheduled Completion – December 2002 Total Cost: $74 million Project Team Owner: Council Rock School District Construction Manager: Bovis Lend Lease General Contractor: Bilt-Rite Contractors Architect: Gilbert Architects Structural Engineer: Baker, Ingram & Associates Mechanical/Electrical Engineer: Moore Engineering Company Lighting/Electrical Fluorescent lamps in classrooms High Intensity Discharge Fixtures in certain areas Low voltage switching system Each classroom wired with RJ-45 network cabling Architecture 360, 000 SF Total Area Two stories of classrooms Exterior walls are a colored brick façade Large Auditorium and Gymnasium Areas 500 seat cafeteria Site Development Full outdoor Tennis and Basketball Facilities ¼ mile Track Football, softball and baseball fields throughout site Two road relocations Structural Concrete footing system Primarily a steel system Slab on Metal Deck Flooring Large Truss systems in Auditorium and Gym Mechanical Forced air system Two Boilers Air Conditioning throughout Rooftop Cooling Tower Seth A. Glinski AE Senior Thesis Construction Management Option Council Rock High School South 2002 Rock Way Holland, PA 18966
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.