Presentation is loading. Please wait.

Presentation is loading. Please wait.

2017 PS HHP AE plan Wang Jiuchun 2017-4-20 Beijing Gateway.

Similar presentations


Presentation on theme: "2017 PS HHP AE plan Wang Jiuchun 2017-4-20 Beijing Gateway."— Presentation transcript:

1 2017 PS HHP AE plan Wang Jiuchun Beijing Gateway

2 Content 2016 highlights 2017 key initiatives Supports needed

3 2016 AE work summary 18 new applications 14 design reviews
25 installation reviews

4 2016 IQA highlights OEM: NHL Engine model: QSK60-HPI-2Stage Equipment model: NTE260H Dump Truck The IQA testing at the highest altitude in the worldwide On-site testing at 5200m altitude Insert Data Classification

5 2016 IQA highlights OEM: Elite Engine Model: QSK60-MCRS-Tier 2
Equipment Model: MCC400A4 Insert Data Classification

6 2016 IQA highlights OEM: CRRC Feb.7
Engine Model: QST30-C1050; QSB6.7-C220 Equipment Model: BS1200 OEM: KCRC Engine model: QST30-C950, QSK19-C760 Equipment model: GCX-1000 snow cleanout Insert Data Classification

7 2017 key initiatives Focus on “One belt one road” projects, ensure IQA quality to meet the OEM’s global demands Support localized DPM project to pull Oil drilling market share growth Introduce QSK95 into the rail locomotive market Support DBU QSK19-R powerpack project

8 Supports needed Julong Mine site, QSK60 operates from 5100m to 5600m altituide Cold start issue: Cranking time > 20 minutes, Cranking speed stalling at 200 ~ 300 rpm Cranking Idle speed


Download ppt "2017 PS HHP AE plan Wang Jiuchun 2017-4-20 Beijing Gateway."

Similar presentations


Ads by Google