PRESENTATION ON MPT ICS SYSTEM
2
Integrated Control System
At our MPT site there is a large installation of ICS system. ICS consists of the following systems, PCS (Process Control System) ESD (Emergency Shutdown System) FGS (Fire and Gas System) RTU (Remote Terminal Units) For Well Pads
3
Integrated Control System
SYSTEMS USED AT OUR SITE PCS - Yokogawa CS3000 ESD – Yokogawa Prosafe Rs FGS – Yokogawa Prosafe RS RTU – Yokogawa Stardom PLC CONNECTIVITY – Cisco Multi Layer Switch
4
Integrated Control System
SYSTEM DOMAIN DISTIBUTION AT OUR SITE DOMAIN 1 – OIL AND GAS AREA / UTILITY / WELLADS DOMAIN 2 – RGT DOMAIN 3 – BOILERS and EPC 2 DOMAIN 4 – BHAGYAM DOMAIN 5 – AISHWARYA and EPC 1 & 3
5
Integrated Control System
WHAT IS DOMAIN A Domain is typically a project, consisting of : Field control stations Operator stations Engineering Stations Marshalling Panels
6
Integrated Control System
SYSTEM IN DOMAIN 1 PCS – 8 Nos. ESD – 25 Nos. ( 6 for MPT and 19 for Wellpads) F&G – 4 Nos. SIOS – 2 Nos. ( For RTU Connectivity with Wellpads) Operator Stations – 14 Nos. PCS Engg. Station – 1 Nos. ESD and F&G Engg. Station – 1 Nos. SOE – 1 Nos. (Sequence of events viewer) PRMS – 1 Nos. (Process Recourse Management Server) RMS – 1 Nos. (Remote monitoring station) OPC – 2 Nos. ( For Data Transfer to Midstream and DOF)
7
Integrated Control System
SYSTEM IN DOMAIN 3 PCS – 2 Nos. ESD – 5 Nos. PCS Engg. Station – 1 Nos. ESD Engg. Station – 1 Nos. ALL THE SYSTEMS ARE LOCATED IN SS1A, SS4A, Wellpads and the final data is coming to CCR for Operation and Monitoring through redundant communication Vnet bus.
8
System Architecture for ICS System at CCR
Vnet Cable Bus 1 Bus 2 PCS ESD FGS RTU Connection Vnet Connection
9
System Architecture for SS1A
Connected to CCB
10
System Architecture for SS4A
Connected to CCB
11
System Architecture for individual WP – ESD/FGS
12
System Architecture for individual WP – RTU
13
System Architecture for Cluster A & B – ESD/FGS
14
System Architecture for Cluster A & B – RTU
15
System Architecture for Cluster C & D - RTU
16
System Architecture for Cluster C & D – ESD/FGS
17
Statistics for Cabinets
CCB PCS ESD FGS System 1 Marsh.-Digital 2 Marsh.-Analog PDB Total 4 5 SS1A PCS ESD FGS System 2 1 Marsh.-Digital 3 Marsh.-Analog PDB Total 7 5 SS4A PCS ESD FGS System 5 4 2 Marsh.-Digital 7 3 Marsh.-Analog PDB 1 Total 18 12 Typical For All Well Pad RTU ESD/FGS System 1 Marsh.-Digital 2 Marsh.-Analog PDB Total 4
18
Statistics for Cabinets
BOILER SS1A PCS ESD FGS System 1 3 Marsh.-Digital 2 Marsh.-Analog PDB Total 4 5 RGT PCS ESD FGS System 1 5 Marsh.-Digital - Marsh.-Analog PDB Total BOILER SS1B PCS ESD FGS System 1 2 Marsh.-Digital Marsh.-Analog PDB Total 4 6
19
Statistics for ICS Stations and I/O
In CS3000 system, in one domain, maximum of 64 stations can be connected. At MPT, approx 60 stations have been used. Still there is a provision for 4 more stations in the existing domain. Total I/O Counts: for MPT – approx. 9800, Well Pad – approx
20
Integrated Control System Loop
Primary measuring Instruments Transmitters/ Flow meters /Analyzers etc. PCS Measurement/Auto control/Manual Control Measured Values to Controller Controller Output to Field Final Control Instruments Valves / Dampers / Motors etc.
21
ICS Input and Output signal flow
Field Inputs Field Junction Box Control Room Marshaling Panel PCS Controller PCS Input Cards Signal Conditioning Cards Control Room Marshaling Panel PCS Output Cards Signal Conditioning Cards Field Outputs Field Junction Box
22
Integrated Control System Redundancy
REDUNDANCY IN THE SYSTEM AT OUR SITE Communication redundancy: through two communication bus Vnet BUS 1 and Vnet Bus 2. Control redundancy: through redundant Input and out put cards and redundant processers. Power Supply redundancy: through redundant UPS 230 Vac power supply for all the controllers.
23
Integrated Control System Maintenance
Maintenance activities for ICS System Daily checking of the system status and card healthiness through system status display and system alarms. Checking of Communication for Wellpads through IP ping. Temperature and Humidity checking for all the panel rooms and control rooms. Every quarter system routine checking with vendor support as part of AMC and annual shut down maintenance for the system if shutdown is provided .
24
Integrated Control System Spares
Spares for ICS System We are maintaining important cards for system in our stock. We have contract with vendor for keeping spares at our site and billing for the spares would be done if they are consumed. Emergency services for ICS system We have contract for 24 hour telephonic support and provision for service engineer visit at out site within 24 hours in case of emergency.
25
Integrated Control System
QUESTIONS
26
Integrated Control System
THANK YOU