Download presentation
Presentation is loading. Please wait.
1
Apparel Production Management info@answersheets.in +91 95030-94040
2
Apparel Production Management 1)The machine requirement in detail for manufacturing 300000 pieces a month with a description of the kind of machinery? ( 10 Marks) 2)The total plan for the Man power in terms of cutting unit, Finishing Unit and the washing unit as well as the administration staff? ( 10 Marks) 3)How many different production lines would you suggest provided the monthly requirement of 300000 pieces will be made in 10 different styles? ( 10 Marks)
3
4)The Production planning schedule for all 3 units for the next 6 months. ( 15 Marks) 5)The Overtime planning divided amongst all 3 units provided that each unit works for 25 days in a month. ( Different plan for Stitching and Printing) ( 10 marks) 6)The printing plan of unit#3 – Is it feasible to invest in additional capacity or to outsource the printing? ( 5 marks)
4
7) The operation break down in a stitching unit with a process flow for the following garments A. The basic 5 pocket jeans (10 Marks) B. The basic Formal single pocket shirt (10 Marks)
5
www.answersheets.in info.answersheets@gmail.com info@answersheets.in +91 95030-94040
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.