Presentation is loading. Please wait.

Presentation is loading. Please wait.

MGT 402 Enthusiastic Studysnaptutorial.com

Similar presentations


Presentation on theme: "MGT 402 Enthusiastic Studysnaptutorial.com"— Presentation transcript:

1 MGT 402 Enthusiastic Studysnaptutorial.com

2 MGT 402 Module 1 Assignment 3 Defining the Project Scope For more classes visit www.snaptutorial.com Review the project case. Determine the scope of the District 4 Production Warehouse Move project from the information provided in the case. Using the Project Scope Checklist, prepare a scope document for review and approval by the project sponsor prior to starting the project.

3 MGT 402 Enthusiastic Studysnaptutorial.com MGT 402 Module 2 Assignment 2 Project Team and Stakeholder Management To Purchase This Material Click below LinTo Purchase This Material Click below Link For more classes visit www.snaptutorial.com Read the project case for this assignment. As the project manager for the District 4 Warehouse Move project, you will need to determine who your stakeholders and project team members are for this project. Remember that anyone connected to the project who has an interest or stake in the project should be considered as a stakeholder. This would include the project team, vendors and management among possible others.

4 MGT 402 Enthusiastic Studysnaptutorial.com MGT 402 Module 3 Assignment 2 LASA 1 Project Planning – Developing the Project Plan and Determining Critical Path For more classes visit www.snaptutorial.com Using the District4WarehouseMove WBS.xls provided, create a project plan for the District 4 Warehouse Move project. Use the PDF document, Project Plan Check – District4Move, to check your work to be sure you have created your starting project plan correctly. ProjectLibre is required for this task. If you have not yet downloaded ProjectLibre, please click here and follow the directions to do so now.

5 MGT 402 Enthusiastic Studysnaptutorial.com MGT 402 Module 4 Assignment 2 Project Schedule Changes For more classes visit www.snaptutorial.com You have kicked off the District 4 Production Warehouse Move project, your contractors are in place and working on receiving the proper building permits.

6 MGT 402 Enthusiastic Studysnaptutorial.com MGT 402 Module 5 Assignment 2 LASA Project Planning Developing the Project Plan and Determining Critical Path For more classes visit www.snaptutorial.com 1. Using the District4WarehouseMove WBS.xls provided, create a Microsoft project plan for the District 4 Warehouse Move project. Use the PDF document, Project Plan Check – District4Move, to check your work to be sure you have created your starting project plan correctly. Microsoft Project is required for this task. If you have not yet downloaded OpenProj, please click here and follow the directions to do so now.

7 MGT 402 Enthusiastic Studysnaptutorial.com


Download ppt "MGT 402 Enthusiastic Studysnaptutorial.com"

Similar presentations


Ads by Google