CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS
2
25 YEARS OF EXPERIENCE ROCK AND SOIL DRILLING CUT-OFF/DIAPHRAGM WALLS STRUCTURAL WALLS BUILDING AND BRIDGE FOUNDATIONS EXCAVATION SUPPORT PILEDRIVING SHEET PILES WIND and ELECTRICAL TOWER FOUNDATIONS
3
ROCK AND SOIL DRILLING 6 to 2.5 METER DIAMETER DRILLS DEPTHS REACHING OVER 100 METERS DRILLING IN MARINE AND LAND BASED ENVIRONMENTS DRILLING THROUGH ANY ROCK OR SOIL
4
CDI DRILLING SYSTEMS
5
BARBER DR40 DRILLS THROUGH ROCK AND SOIL EFFICIENTLY DRILLS OVER 100 METERS DEEP DRILLS UP TO 40 DIAMETER MOBILE QUICK SETUP
6
WIRTH DRILL DEEP DRILL DEPTHS DRILLS THOUGH ANY ROCK AND SOIL UP TO 3.5 METER DIAMETER REVERSE CIRCULATION CLOSED SYSTEM
7
WIRTH DRILL SYSTEM
8
SOILMEC R-416 FAST DRILLING/AUGERING QUICK SETUP MOBILE 16- 4 METER DIAMETER
9
DOWN-HOLE HAMMER FAST DRILLS THROUGH HARD ROCK WORKS WELL WITH CASING UP TO 2.4 METERS DIAMETER
10
LODRILL LOW HEAD ROOM WORKING CONDITIONS ROUGH TERRAIN MOBILE FAST
11
ROTATOR CDI DESIGNED AND BUILT DRILLS THROUGH ROCK AND SOIL UP TO 40 DIAMETER COMPACT VERSATILE
12
WORKING IN ENVIRONMENTALLY SENSITIVE AREAS
13
DRILLING IN ALL TERRAINS
14
TRANSPORT BY RAIL
15
WORKING ON SLOPES
16
CUT-OFF and DIAPHRAGM WALLS PREVENT UNDERGROUND MIGRATION OF CONTAMINANTS GROUNDWATER CONTROL EXCAVATION SUPPORT (vertical walls) STRUCTURAL CAPABILITIES DELINIATE CLEAN FROM CONTAMINATED AREAS PROPERTY LINES PASSIVE WALLS – ACTIVE FILTRATION OF GROUNDWATER
17
TYPICAL CUT-OFF WALL OPERATION
18
CUT-OFF WALLS ENABLE VERTICAL EXCAVATION
19
SECANT DESIGN AS STRUCTURAL WALL
20
SECANT WALL AS SHORING
21
SECANT REINFORCEMENT DESIGNS
22
CLOSE PROXIMITY TO PROPERTY LINES AND BUILDINGS
23
LOW DISTURBANCE INSTALLATION
24
CASE STUDIES
25
SECANT WALL, Victoria BC CHALLENGES – Foreshore Installation of Secant Wall – Boulder/Rip Rap Substrate – Caissons 10 meters below sea level – Tidally Influenced – Concerns of caisson deviation
26
SECANT WALL, Victoria BC SOLUTIONS – Installation of earth berms to contain water – Specially designed tools for drilling and removing obstructions – Pumps and Bailers to remove water – Specialized tremie pipe system for pouring concrete under water – Design and build specific guide wall to align caissons
27
WALL GUIDE
28
SECANT WALL MINE SHAFT, Ontario CHALLENGES – Sub-surface layer of fractured rock – High ground water inflow rate – Running sand at 10-12 meters
29
SECANT WALL MINE SHAFT, Ontario SOLUTIONS – Advance socket through fractured layer – Utilize special tool to remove sand – Create positive head pressure with water to prevent sand from re-entering caisson
30
SECANT WALL GUIDE
31
SECANT WALL MINE SHAFT
32
HEALTH & SAFETY AND ENVIRONMENTAL PROTECTION CORE CERTIFIED COMPREHENSIVE HEALTH AND SAFETY PROGRAM – Toolbox Meetings – Safe Work Practices – Hazard Control Procedures – Near Miss Reporting SPILL RESPONSE TRAINED EXPERIENCED SUPERVISORS/FOREMAN
33
CONSTRUCTION DRILLING INC. SUMMARY SPECIALIZE IN UNIQUE AND DIFFICULT DRILLING/AUGERING AND CUT-OFF WALL SOLUTIONS. 150+ YEARS OF COMBINED EXPERIENCE INNOVATIVE SOLUTIONS WORLDWIDE CAPABILITIES
34
CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS