AG BUILDING CONSTRUCTION. Unskilled / Semi-skilled Labor Skilled Trade / Craftsman Technicians Design & Management.

Similar presentations


Presentation on theme: "AG BUILDING CONSTRUCTION. Unskilled / Semi-skilled Labor Skilled Trade / Craftsman Technicians Design & Management."— Presentation transcript:

1 AG BUILDING CONSTRUCTION

2 Unskilled / Semi-skilled Labor Skilled Trade / Craftsman Technicians Design & Management

3 Type of Barn / Building Size Function Cost FACTORS TO CONSIDER WHEN DECIDING A BUILDING

4 3 BASIC SYSTEMS IN CONSTRUCTION It always starts from the ground up A.Foundations B.Framing C.Roofing

5 KEY TERMS Foundation – It is what the building rest on Footer – Must support the weight of the entire building

6 TYPES OF FOUNDATINS 1. Slab 2. Floating Slab 3. Craw Space 4. Footer Pads 5. Basements

7 FOUNDATION TYPES Slab Footer with a concrete floor. Utilities go through the walls & ceilings Can run pipes under slap Floating Slab No Footer Built for sheds or buildings with not much weight

8 FOUNDATION TYPES Crawl Space 18-24 Gap between the gravel base & the floor joist Tile in gravel to divert excess water Utilities can be ran through crawl space Basements / Cellars 8-10 deep Adds sq ft to the home – cheaper to heat and cool Most basements have a sump pump to divert water around footers. Walls are water proofed with black sealant (outside Gravel Backfill

9

10 FOUNDATION TYPE Post Frame A hole must be dug at least 3 deep Concrete pad that post on / in Post is anchored by concrete No footer


Download ppt "AG BUILDING CONSTRUCTION. Unskilled / Semi-skilled Labor Skilled Trade / Craftsman Technicians Design & Management."