Presentation is loading. Please wait.

Presentation is loading. Please wait.

Access charge in 2001 Cost of overhaul and materials for public infrastructure covered by the State Cost of maintenance of public infrastructure and operations.

Similar presentations


Presentation on theme: "Access charge in 2001 Cost of overhaul and materials for public infrastructure covered by the State Cost of maintenance of public infrastructure and operations."— Presentation transcript:

1 Access charge in 2001 Cost of overhaul and materials for public infrastructure covered by the State Cost of maintenance of public infrastructure and operations covered by operators through access charge Cost of utilization of facilities of private infrastructure (buildings, lines in stations, depots, etc.) covered by operators based on specific tariffs Cost of other services (telecom, IT, etc.) covered by operators based on specific tariffs

2 Subsidies from the state budget

3 Subsidy in Romania [millions lei]
Annual inflation 60% %

4 Income allocation Income Expenses Access charge Subsidy Tariffs
Modernizations Overhaul Fuel Energy Tariffs Spare parts Wages Special fees Others Others Income Expenses

5 Income allocation Income Expenses Access charge Subsidy Tariffs
Modernization Overhaul Fuel Energy Spare parts Tariffs Wages Special fees Others Others Income Expenses

6 Income allocation Income Expenses Access charge Subsidy Tariffs
Modernization Overhaul Fuel Tariffs Energy Spare parts Wages Special fees Others Others Income Expenses

7 Tariffs Reform

8 The predicted evolution of State contribution for railways subsidies

9 Tariffs Reform Principles
Tariffs to be modified according to inflation rate and raised on the basis of better services offered Maintaining a high social protection for local trains second class Annual adjustment of tariffs in accordance with the state subsidy level More flexibility for tariffs for special services (season tickets, round trips, monthly passes, etc.)


Download ppt "Access charge in 2001 Cost of overhaul and materials for public infrastructure covered by the State Cost of maintenance of public infrastructure and operations."

Similar presentations


Ads by Google