Analog System Review and Status Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1
2
Outline Top-level subsystem description Module-level design and construction status – 2-meter Front End assembly – Front End auxiliary electronics cabinet – Downconverter module – LO Distribution modules – Timing Generation and Distribution module – Correlator Clock Generation module Rack-level design & cabling Budget and current schedule September 24-26, 2012EOVSA Prototype Review2
3
Analog Subsystem Diagram September 24-26, 2012EOVSA Prototype Review3
4
2-Meter Front End Assembly September 24-26, 2012EOVSA Prototype Review4
5
2-Meter Front End Block Diagram September 24-26, 2012EOVSA Prototype Review5
6
September 24-26, 2012EOVSA Prototype Review6
7
Half-side Interior View, 2-meter Front End Assembly September 24-26, 2012EOVSA Prototype Review7
8
20 GHz Laser Transmitter September 24-26, 2012EOVSA Prototype Review8
9
Optical Mux / Demux September 24-26, 2012EOVSA Prototype Review9
10
Front End Module Design and Construction Current status Most components on hand, except low-loss coax cables, BPF, bulkhead fiber adapter. Module mechanical design 50% done; will contract Segars Engineering to complete. Apex mounting plate design is TBD (Segars ) Module wiring diagram is TBD Ethernet cable is under construction (Kjell N.) Front End interface board circuit design 90% done; PCB layout, fab and assembly TBD. Parts ordering TBD. Software interface document, embedded firmware and control GUI are TBD. September 24-26, 2012EOVSA Prototype Review10
11
Front End Auxiliary Cabinet September 24-26, 2012EOVSA Prototype Review11
12
Auxiliary Cabinet Wiring Diagram September 24-26, 2012EOVSA Prototype Review12
13
September 24-26, 2012EOVSA Prototype Review13
14
Auxiliary Cabinet Design and Construction Current status Nearly all components on hand; two Lambda supplies on backorder, opt. RX units in transit. Wiring of first cabinet is well underway All 4 power and signal cables completely specified, parts on hand at OVRO (Kjell to build) 1PPS fiber patch cords on order; will arrive ~9/28 Outdoor analog fiber drop cables on order; will arrive ~11/1. Ethernet cable under construction (Kjell N.) Multifiber cable termination inside cabinet TBD September 24-26, 2012EOVSA Prototype Review14
15
Downconverter Module September 24-26, 2012EOVSA Prototype Review15
16
Downconverter Block Diagram (1 of 2) September 24-26, 2012EOVSA Prototype Review16
17
Downconverter Block Diagram (2 of 2) September 24-26, 2012EOVSA Prototype Review17
18
Downconverter Module Interior Layout September 24-26, 2012EOVSA Prototype Review18
19
Downconverter Front/Rear Panels September 24-26, 2012EOVSA Prototype Review19
20
Downconverter Module Interface PCB September 24-26, 2012EOVSA Prototype Review20
21
Downconverter Module Design and Construction - Current status All components in, except one 2.92mm cable Module mechanical design complete, metal work on order. Assembly drawings TBD. Need to generate module wiring diagram; mechanical assembly of 1 st module will begin ~ Oct. 8. Downconverter interface board in assembly stage, firmware development and GUI TBD. Rack DC power cables under construction September 24-26, 2012EOVSA Prototype Review21
22
LO Distribution Module September 24-26, 2012EOVSA Prototype Review22
23
LO Distribution Subsystem: LO1 September 24-26, 2012EOVSA Prototype Review23
24
LO Distribution Subsystem: LO2, DC input September 24-26, 2012EOVSA Prototype Review24
25
LO1-A, LO1-B Synthesizer September 24-26, 2012EOVSA Prototype Review25
26
LO Distribution Module Interior Layout September 24-26, 2012EOVSA Prototype Review26
27
LO Distribution Module Rear Panel September 24-26, 2012EOVSA Prototype Review27
28
Quinstar Power Amplifiers for LO1 September 24-26, 2012EOVSA Prototype Review28
29
LO Distribution Module Interface PCB September 24-26, 2012EOVSA Prototype Review29
30
LO Subsystem Design and Construction Current status All components in, except 2.92mm cables. Distribution module mechanical design complete, metal work on order. Assembly drawings delivered. Need to generate detailed wiring diagram; mechanical assembly will begin ~ Oct. 1. LO interface module under assembly, firmware development and GUI in progress. Power supply module mechanical design and fab is TBD; DC power cable is ready. September 24-26, 2012EOVSA Prototype Review30
31
Timing Generation and Distribution Subsystem September 24-26, 2012EOVSA Prototype Review31
32
Timing & Reference Distribution Block Diagram September 24-26, 2012EOVSA Prototype Review32
33
Timing Generator Module Interior Layout September 24-26, 2012EOVSA Prototype Review33
34
Timing Generator Module Rear Panel September 24-26, 2012EOVSA Prototype Review34
35
1 PPS Driver, 50 Hz Generator PCB September 24-26, 2012EOVSA Prototype Review35
36
1PPS Laser Transmitter Unit September 24-26, 2012EOVSA Prototype Review36
37
EDFA / 16-way splitter (PRD-16) September 24-26, 2012EOVSA Prototype Review37
38
PRD-16 Rear Panel September 24-26, 2012EOVSA Prototype Review38
39
1PPS Optical Receiver September 24-26, 2012EOVSA Prototype Review39
40
Labview GUI for PRD-16 September 24-26, 2012EOVSA Prototype Review40
41
Timing Generation and Distribution Subsystem Design and Construction - Current status All components are in. TGD module mechanical design complete, metal work on order (fast turnaround) Assembly drawing delivered. Need to generate module wiring diagram; mechanical assembly will begin ~ Oct. 1. Timing generator boards built, tested. Will need a small additional PCB for output buffering of the optical RX, to correct polarity, pulse width and drive level for cRIO. September 24-26, 2012EOVSA Prototype Review41
42
Correlator Clock Generation (CCG) Module September 24-26, 2012EOVSA Prototype Review42
43
CCG Module Block Diagram September 24-26, 2012EOVSA Prototype Review43
44
CCG Module Interior layout September 24-26, 2012EOVSA Prototype Review44
45
CCG Module Rear Panel September 24-26, 2012EOVSA Prototype Review45
46
CCG Module Design and Construction Current status All components in, except 1200 MHz PLO; expect it to ship 9/28/12 from vendor. CCG module mechanical design complete, metal work on order (fast turnaround) Assembly drawing delivered. Need to generate CCG module wiring diagram; mechanical assembly will begin ~ Oct. 1. September 24-26, 2012EOVSA Prototype Review46
47
Rack-Level Design and Cabling September 24-26, 2012EOVSA Prototype Review47
48
Layout of Equipment Racks, Front View September 24-26, 2012EOVSA Prototype Review48
49
Partial Drawing of Analog Racks, Rear View September 24-26, 2012EOVSA Prototype Review49
50
LO Inter-rack Cable Routing September 24-26, 2012EOVSA Prototype Review50
51
Downconverter Subrack Frame September 24-26, 2012EOVSA Prototype Review51
52
Analog Rack Layout and Construction Current status Equipment racks on order; delivery expected at end of October. 6U subrack kits received; awaiting guide rail hardware PDUs and UPS ordered and received by Kjell N. Fiber cables to Patch Panel on order, quick delivery. LO2 cables on hand; LO1 cables expected late Oct. DC supplies and filters for Downconverter rack on hand, in sufficient quantity for prototype build. Mechanical layout and wiring of Downconverter power supply panel is TBD. Will use DIN rails and terminal blocks like Auxiliary cabinet, but with separate 19 wide panel for power cable mating. Downconverter IF output cables to Correlator rack not yet specified or ordered. Short lead-time item. September 24-26, 2012EOVSA Prototype Review52
53
Schedule, Costing and Personnel September 24-26, 2012EOVSA Prototype Review53
54
Revised Module Delivery Timeline Module construction ~1-3 months behind original schedule. Will have staged deliveries: – Expect to assemble, test and ship TGD and CCG modules mid-October, with PRD-16. – Begin assembly of LO Distribution module mid-October, test and ship by mid-November, assuming GUI and firmware are ready. – Assemble Downconverters by early November, test and ship by end of November, assuming software GUI available and firmware is done. – Fab of mechanical pieces in Front End assembly by mid- November, assembly complete in early Dec. Test and ship all units by end of year. September 24-26, 2012EOVSA Prototype Review54
55
Schedule Risks and Assumptions Remaining deliveries from vendors are on time. Moderate risk. Assume full-time technician help available through end of November. Moderately high risk. Assume firmware and GUI available when needed for module testing. Moderately high risk. No 11 th -hour design changes. – Low risk for TGD, LO Dist. and CCG modules – Moderate risk for Downconverter, Front End modules Other unforeseen catastrophes (??). Low risk. September 24-26, 2012EOVSA Prototype Review55
56
Costing and Personnel Prototype and production costing tracked with top-level Excel bill of materials (view) Additional personnel in VA working on EOVSA: – Chuck Neff, Mechanical draftsman/designer, Segars Engineering. 3D mechanical design of modules. – Steve Nuttall, Senior Technician, NRAO. Board and cable assembly, wiring, mechanical assembly. – Bob Treacy, Tech Spec. I, NRAO. PCB layout. – Jason Castro, Engineer II, NRAO. Embedded firmware and Labview GUIs. September 24-26, 2012EOVSA Prototype Review56
57
September 24-26, 2012EOVSA Prototype Review57