1 EOC LIMITED CORPORATE PRESENTATION MARCH 2011

2 DISCLAIMER This material includes forward-looking statements prepared by EOC Limited (“Company”). The opinions, forecasts, projections or other statements other than statements of historical fact, including, without limitation, estimates of proved reserves of oil and gas, reserves potential and plans and objectives of management of the Company for financing, are forward-looking statements. Although the Company believes that the expectations reflected in such forward-looking statements are reasonable, it can give no assurance that such expectations will prove to have been correct. All forward looking-statements contained in this presentation are expressly qualified in their entirety by the cautionary statements contained or referred to in this section. Readers should not place undue reliance on forward-looking statements. Each forward looking statement speaks only as of the date of this presentation. Neither the Company nor any of its subsidiaries and associates undertake any obligation to publicly update or revise any forward-looking statement as a result of new information, future events or other information. In light of these risks, results could differ materially from those stated, implied or inferred from the forward-looking statements contained in this presentation.

3 PRESENTATION AGENDA EMAS – Who We Are EOC – Construction & Production
INTRODUCTION EMAS – Who We Are EOC GROUP PROFILE EOC – Construction & Production Construction Activities FPSO Experience FINANCIALS & FORWARD STRATEGY Year-on-Year Financials Growth Mechanics

4 EMAS GROUP SERVICES MARINE Construction & Production Engineering
& Fabrication EMAS AMC

5 CONSTRUCTION & PRODUCTION
BUSINESS SEGMENTS CONSTRUCTION & PRODUCTION Construction Offshore Transport & Installation Offshore Heavy Lift Operations Jacket Launching Heavylift & Pipelaying Production Floating Production Storage & Offloading Systems Provision of Turret & Mooring Systems

6 AREAS OF OPERATIONS INDIA QATAR AUSTRALIA

7 EOCL ASSETS Description No of Vessels Accommodation Crane Barge 2
Derrick Accommodation Pipelay Vessel 1 FPSO

8 GROUP STRUCTURE Accommodation Construction Barge Delivered 2004
Lewek Conqueror (BVI) Ltd Accommodation Construction Barge Delivered 2004 Lewek Chancellor Shipping Pte Ltd Accommodation Construction Barge Delivered Mar 2007 Lewek Champion Shipping Pte Ltd Accommodation Construction Pipelay Barge Delivered Aug 2007 Emas Offshore Construction and Production Pte Ltd Contract/Commercial Mgmt Operations and Execution Emas Offshore Production Services (Vietnam) Pte Ltd FPSO Expected Delivery Mid-2011 Lewek Emerald Shipping Pte Ltd FPSO Delivered Dec 2008 Lewek Eversure Shipping Pte Ltd Lewek Evershine Shipping Pte Ltd

9 CONSTRUCTION ACTIVITIES
Riser Stalk-on in DP Piling Jacket and Topside Installation Pipelay

10 Vessel Specifications Suitable for Sikorsky S92
LEWEK CHAMPION DP2 Pipelay & Heavy Lift Construction Vessel S-Lay pipe-laying capabilities 3 double-joint, 6 single-joint welding stations 2 x 100 tonnes tensioners 6” – 60” Outer diameter pipeline m water depth operation Built 2007 Vessel Specifications Accommodation Overall length 142m Breadth 40m Deck strength 17t / sq.m Thrusters 6 x 2400 kw Crane Heavy Lift - 30m radius Helipad Suitable for Sikorsky S92

11 Commonwealth of Dominica Lloyd's Register of Shipping
ACCOMMODATION BARGES Large accommodation capacity Lifting capability for offshore construction and maintenance of oil and gas platforms Built for Construction and Work over 8 Point Anchor-mooring system Lewek Conqueror Lewek Chancellor Accommodation 308 men 290 men Overall length 100m 91.44m Beam 30.48m 27.43m Depth 7.29m 6.71m Draft 4.6m 4.5m Crane 30m radius 220T Helipad 22.2m x 27.5m 15.24m x m Mooring system 8 point Flag Panama  Commonwealth of Dominica Class ABS Lloyd's Register of Shipping

12 PRODUCTION Assets Services
Floating Production Storage & Offloading (FPSO) and FSO Services Operations and Maintenance of FPSO and FSO EPC mooring systems – in collaboration with LMC

13 FPSO LEWEK ARUNOTHAI Overall length, m 263.7 Breadth, m 40.8
Depth moulded, m 22.2 Gross Tonnage, tons 63,101 Dwt (tropical) 127,540 Lightweight, tons 18,661 Storage 725,000 bbl Export Gas psig, 50oC Condensate 6500 bbl / day

14 FPSO LEWEK EMAS Overall length, m 290.4 Breadth, m 50.6
Depth moulded, m 23.8 Gross Tonnage, tons 94,647 Dwt, tons 188,101 Lightweight, tons 29,457 Oil Production, bpd 50,000 Water Injection, bpd 60,000 Export Gas bar, 50oC

15 CONTRACT COVERAGE Brunei Thailand Vietnam Thai Mal/Thai Mal India
Till July 2017 Till Oct 2012 Till Mar 2014 Dec 2009 Jun 2010 Dec 2010 Jun 2011 Dec 2011 Jun 2012 Dec 2012 Till Dec 2011 Till Feb 2012 Brunei Thailand Vietnam Thai Mal/Thai Mal India Congo Firm Negotiation PNG

16 FORWARD STRATEGY

17 Current and Future FPSO
13 1 6 1 2 1 24 1 1 37 38 11 New Focus - Africa

18 FORWARD GROWTH STRATEGY
Expand Geographic Spread – Africa Extend presence in Asia. Build O&M service offering for FPSO Leverage on EMAS group capabilities for integrated services EPC mooring systems - LMC Construction – AMC Fabrication Acquire technology company Strategic alliances/M&A activity

19 FINANCIAL TRACK RECORD

20 FINANCIAL HIGHLIGHTS

21 Need Clarifications? For further information, please contact:

22 THANK YOU

23 APPENDIX

24 HEALTH, SAFETY, ENVIRONMENT & QUALITY (HSEQ)
Description 2008 2009 2010 LTI LTI Frequency Rate Total Recordable Injuries (TRIs) 5 2 Total Recordable Injury Frequency Rate (TRIFR) 4.0 2.2 3 Executive Management commitment to HSEQ Achieved goal of 0 LTI. Emas Offshore’s Quality System is certified to ISO9001:2008 by Lloyds Register.

25 MARINE Anchor Handling Towing/ Supply Bulk & Deck Cargo Transportation
Crew & Supply Transportation Fire Fighting Standby & Rescue Remotely Operated Vehicle Support Deep Sea Diving Support FPSO/FSO Towing, Installation of Moorings FPSO Mobilisation/ Decommissioning

26 SUBSEA SERVICES 2 MFSVs Heavy Lift DP3 Well Intervention
Subsea Construction Vessel Heavy Lift DP3 Well Intervention Subsea Construction Vessel II 2 MFSVs SURF Installation IMR Services Well Intervention Decommissioning

27 AKER MARINE CONTRACTORS
ENGINEERING Naval Architecture Hydrodynamic Analysis Structural Analysis & Engineering SURF Analysis & Engineering (SURF – Subsea, Umbilicals, Risers and Flowlines) OPERATIONS Client interface Engineering interface Logistics Procedure development Procurement Project Execution Support for Vessel Superintendents ASSIST WITH TENDERING – early engineering including feasibility checks

28 AKER MARINE CONTRACTORS
SURF FLOATERS REMOVAL FLOATOVER Shenzi (GoM) Blind Faith Subsea (GoM) Na Kika (GoM) King (GoM) Oudna Field Dev. (Tunisia) Oseberg Delta Structures (North Sea) Langeled SSVS & Risers (North Sea) Chinguetti Host Installation (Mauritania) Norne Satellite (North Sea) Snøhvit Structures (North Sea) Thunder Horse (GoM) Macando (GoM) Gladden (GoM) Popeye (GoM) Tamar (Mediterranean) Jubilee FPSO Transport and Installation (W. Africa) Skarv FPSO Transport and Installation (North Sea) Gjøa Semi Marine Installation (North Sea) Thunderhawk (GoM) Adriatic LNG (GBS) (Adriatic Sea) Blind Faith T&I (GoM) Chestnut (North Sea) KuMaZa Mooring and Riser Installation (PEMEX) Sakhalin (Russia) BAOBAB FPSO Mooring and Installation (W. Africa) Kristin Semi (North Sea) Frigg Cessation (North Sea) Ardmore SAL Mooring Removal (North Sea) Maureen Refloat (North Sea) Downed Platform (GoM) Chevron Noble Energy Angel (SE Asia) Bayu-Undan (SE Asia) Kristin (North Sea) Aker Marine Contractors is a global provider of marine operations and contracting services to the oil and gas industry within its four main services segments: mooring and floater installation, installation of SURF (that stands for Structure, Umbilicals, Risers and Flowlines), topside floatovers, and removal. We can offer: Safe and predictable on time delivery Solution oriented with a Mission possible attitude Flexibility to select fit for purpose vessels High technical capability Experience from harsh environment and ultra deep water A project execution model that secure experience transfer and continuous learning People – experienced, dedicated and motivated Aker Marine Contractors, Slide 28 28

29 ENGINEERING & FABRICATION
Access to engineering design expertise located in London. Two fabrication facilities in Vietnam providing design and provision of mooring systems for FPSOs and FSOs. Industry’s first-ever converted FSRU Turret Biggest turret designed by LMC

30 EMAS – CORPORATE MILESTONES
Acquisition of Aker Marine Contractors Established HQ in Houston for Americas Subsea and Well Intervention activities Listing of EOC on Oslo Stock Exchange Acquired Saigon Fabrication Shipyard Singapore IPO Incorporation of EMAS Offshore 2010/11 2009 2007 2005 2003 1992