Rampion Offshore Wind Farm Meet the Buyer Onshore Substation
11th February 2015 Rampion Offshore Wind Farm Meet the Buyer Onshore Substation
2
The ABB team today David Firth – Senior Project Manager
Ian Clarkson – Supply Chain Development Manager
3
Rampion Offshore Wind Farm ABB Power Systems UK
11th February 2015 Rampion Offshore Wind Farm ABB Power Systems UK
4
A global leader in power and automation technologies Leading market positions in main businesses
In revenue (2013) billion 42 $ ~145,000 employees Present in countries +100 Formed in 1988 merger of Swiss (BBC, 1891) and Swedish (ASEA, 1883) engineering companies ABB - publicly owned company with head office in Switzerland July 23, 2014
5
Power and productivity for a better world ABB’s vision
As one of the world’s leading engineering companies, we help our customers to use electrical power efficiently, to increase industrial productivity and to lower environmental impact in a sustainable way. July 23, 2014
6
Where you will find ABB Integration of power generation in weak grids
Load balancing & integration of distributed resources Management of complex and less predictable power flows Upgrade of transmission systems FACTS, WAMS, EMS, PFC Secure grid stability and power quality Condition monitoring, real time state estimation and short/long term forecast of load and generation for operation management Demand Side Management Efficient cross-border interconnections, e.g. HVDC Connectivity and management of e-vehicles, intelligent industrial loads, micro-storage systems Protection concepts for grids with decentralized power generation
7
How ABB is organized Five global divisions
Revenues 2013 Power Products 3% $11 billion Power Systems 7% $8.4 billion Discrete Automation and Motion 5% $9.9 billion Low voltage Products 16% $7.7 billion Process Automation 4% $8.5 billion Employees at the end of 2013 (2012) Power Products 35,600 (35,800) Power Systems 20,300 (20,200) Discrete Automation and Motion 30,200 (29,300) Low voltage Products 31,700 (30,800) Process Automation 25,900 (28,000) ABB’s portfolio covers: Electricals, automation, controls and instrumentation for power generation and industrial processes Power transmission Distribution solutions Low-voltage products Motors and drives Intelligent building systems Robots and robot systems Services to improve customers productivity and reliability July 23, 2014
8
Power Systems in the UK Accredited to ISO9001/14001/18001
Project Managers – trained and accredited under a global ABB system Site Managers, projects managers, senior managers – IOSH/NEBOSH certified Rolling 12 Month AFR for ABB PS = 0.049 ABB supports wider industry bodies (IET Power Academy, NSAP, CIGRE, EEIBA, Renewable UK, Scottish Renewables) and in the community (schools programme, Special Olympics, charity fundraising, Young Offenders Programme)
9
Power Systems in the UK Circa 500 employees based at Stone, East Kilbride, London and across the UK on construction sites Business comprises turnkey substations, substation & network automation & test centre, grid systems, HVDC/FACT’s, EHV power cables & service Turnkey scope includes design, project management, civil works, electrical plant, I&C, EHV cabling , installation and commissioning Main TO’s & DNO’s form the main client segments but diversification of client base has developed the business into other markets Relatively small number of clients – performance and long term sustainable relationships are key – clients expect consistent approach with major focus on safety and construction delivery A flexible partner with a track record of adaptability to changing market environments and working cultures UK references last 3 years
10
Recent Projects Circa £200m 8 year substation framework
Hunterston, Torness and Wishaw 400kV substations Wakefield, Creyke Beck & Tynemouth 132kV GIS Substations Connahs Quay 28 bay 400kV GIS West Burton 400kV GIS generation connection & 400kV AIS banking connection 500MW HVDC Link Stalybridge 275kV GIS St Johns Wood/Lodge Road/City Road 400/132/66kV Pembroke 400kV GIS generation connection Pen-y-Cymoedd W/F 400/132kV 276MW Grid Connection VLU Package 4 BSP, RTU & SCADA Reading 132kV & Iver GIS substations © ABB Group October 14, 2018 | Slide 10
11
Rampion Offshore Wind Farm ABB Scope of Supply
11th February 2015 Rampion Offshore Wind Farm ABB Scope of Supply
12
ABB Proposed Scope of Supply
Enabling Works Temporary Access Road from Wineham Lane Permanent Access Road from Bob Lane Construction Platform Site Welfare Establishment Civil Construction Rampion & Bolney Equipment Foundations Compound Roads Control Buildings
13
ABB Proposed Scope of Supply
Equipment Installation Mechanical Erection Multicore Cables HV Cable Installation Duct Laying Cable Pulling Termination and Jointing
14
Overall Site Layout
15
Rampion Onshore Substation
16
National Grid Bolney – AIS
17
Rampion Offshore Wind Farm Sub-Contract Opportunities
11th February 2015 Rampion Offshore Wind Farm Sub-Contract Opportunities
18
Rampion Onshore Substation – Enabling Works
Description Contracting Opportunities Road Construction Stock Proof Fencing Ground Workers Road Surfacing Site Levelling Stabilisation Works Compound Fencing Supply of Temporary Fencing Supply and Installation of Permanent Palisade Fencing
19
Rampion Onshore Substation – Civil Construction
Description Contracting Opportunities Equipment Foundations Ground workers Carpenters Steel Fixers Concrete Workers Control Buildings Steelwork Erection Cladding M&E Fit Out Electricians Plumbers Finishing Works Landscaping Compound Lighting
20
Rampion Onshore Substation – Electrical Installation
Description Contracting Opportunities Mechanical Installation Mechanical Fitters Crane Hire Plant Hire Cabling Cable Containment Cable Pulling Wiremen
21
Rampion Onshore Substation – General
Description Contracting Opportunities General Services Site Security Waste Disposal Cleaning Contractors Plant Hire Generator Hire and Servicing
22
Questions? © ABB Group October 14, 2018 | Slide 22