From I-24 (MP 44) to I-64 (MP 92) is 48 miles ADT 2009 ADT = 30,000 vehicles per 2.2% growth rate 2030 ADT = 48,000 vpd 2009 Average Daily Truck.

Similar presentations


Presentation on theme: "From I-24 (MP 44) to I-64 (MP 92) is 48 miles ADT 2009 ADT = 30,000 vehicles per 2.2% growth rate 2030 ADT = 48,000 vpd 2009 Average Daily Truck."— Presentation transcript:

1

2 From I-24 (MP 44) to I-64 (MP 92) is 48 miles ADT 2009 ADT = 30,000 vehicles per day @ 2.2% growth rate 2030 ADT = 48,000 vpd 2009 Average Daily Truck Traffic = 30% or 10,000 Trucks per day Estimated Cost to Widen to 6 lanes = $350 M (does not include rehabilitation of the exist. Pavement)

3 IDOT conducted a Feasibility Study in Franklin County to investigate adding the 3 rd lane to I-57

4 Yes, the I-57 traffic warrants an additional lane Widening should be accomplished by widening to the inside : minimizes right of way cost and impacts includes closed drainage where median is less than 64 requires widening of bridges does not impact overhead structures and interchanges Costs (excludes structures & rehabilitation of the existing pavement) Inside Alternate (50 existing median): $890/ft Inside Alternate (64 existing median): $1,030/ft Inside Alternate (80 existing median): $790/ft

5 Typical Sections : Inside Widening with 64 median (closed drainage in median ) Typical Sections : Inside Widening with 80 median (open drainage in median)

6

7

8

9 INCLUDES: FED. STIMULUS AND 2009 JUMP START PROJECTS

10 1. When replacing I- 57 Structures add the 3 rd lane … Underway 2. Rehabilitate I- 57 Pavement ….Underway 3. Begin design work on small fundable contracts to add the third lane, begin to introduce into the program or have ready for new funding initiatives ….Underway

11 Bridges completed that accommodate 3 lanes MP 51, I-57 over Crab Orchard Creek (S of Marion) MP 53, I-57 over old IL 13 in Marion MP 53, I-57 over the Crab Orchard and Egyptian RR MP 59, I-57 over Lake Creek (S of Johnston City) MP 90, I-57 over Casey Fork Creek (S of Mt. Vernon) Bridges in the program that will be built and will accommodate 3 lanes MP 54, I-57 over new IL 13 MP 65, I-57 over 7 th Street in West Frankfort MP 71, I-57 over the UP Railroad

12 PROJECT LOCATION ON INTERSTATE 57 IN FRANKLIN COUNTY REMOVAL AND REPLACEMENT OF TWO STRUCTURES OVER 7 TH ST. AND THE ABANDONED C&EI RAILROAD. LOCATED 0.7 MILES NORTH OF IL. RTE. 149 June 11, 2010 Letting

13 PROJECT LOCATION ON INTERSTATE 57 IN FRANKLIN COUNTY REMOVAL AND REPLACEMENT OF TWO STRUCTURES OVER THE UNION PACIFIC RAILROAD. LOCATED 1.1 MILES SOUTH OF IL. RTE. 14 IN BENTON September 17, 2010 letting (pending ruling by IL commerce commission)

14 Complete – I-57 NB IL 13 to Williamson/Franklin Co. Line Complete – I-57 NB & SB IL 14 to Franklin Co. Line Rubblization of I-57 will be complete in 2011 from IL 13 (Marion) to 1 mile north of Bonnie (south of Mt. Vernon)

15 I-57 Rubblization in Williamson and Franklin County, 2 nd Federal Stimulus (Jobs for Main St. Act: NB – Williamson/Franklin County line to IL 14 SB – IL 14 to north of IL 13 NB – 9.9 miles SB – 16.2 miles Estimated Cost - $32.7 M Summer 2010 - work should begin in May and be complete in September Lane closures and delays expected

16 I-57 Rubblization in Jefferson County, Construction Now program: NB & SB - from the Franklin County line to 1 mile north of Bonnie 6.6 miles Estimated Cost - $15.8 Work in late 2010 and 2011 Work may begin in September, 2010 and be completed by July 1, 2011 Lane closures and delays expected

17 RUBBLIZATION EQUIPMENT

18 3 rd Lane Complete – Marion; South of MP 53 to north of MP 53- (not open to traffic) Funded in MYP- MP 92, I-64 south of Mt. Vernon, to MP 96, I-64 north of Mt. Vernon; design under way to add third lane and replace the pavement. Construction planned for 2011. Funded in MYP - MP 54 Marion, design underway to complete the 3 rd lane through Marion

19 Unfunded ---- 1 st priority: add third lane for 12.7 miles from north of IL 13 in Williamson County to south the Middle Fork Big Muddy River in Franklin County (north of Benton) Total Cost = $65 M 12.7 miles of 3 rd lane = $56 M I-57 over Pond Creek, SN 028-0001&0002, replacement, $6.0 M I-57 over Lake Creek Branch, SN 100-0010 & 0011, widen structure and superstructure replacement, $3.0 M

20 Unfunded – 2 nd choice: add third lane for 8 miles from north of IL 13 in Williamson County to the Williamson / Franklin County Line Total Cost = $36.5 M 8 miles of 3 rd lane (80 median, open drainage) = $33.5 M I-57 over Lake Creek Branch, SN 100-0010 & 0011, widen structure and superstructure replacement, $3.0 M May be ready for a September, 2010 letting

21 The Federal Highway Administration (FHWA) estimates that a $1 billion of Federal highway expenditure supports 30,000 jobs which includes direct, supporting, and induced positions, defined as: Construction oriented employment, includes all jobs created by the construction firms that work directly on the project or by the firms that provide direct inputs (paving materials, steel, concrete, etc.) to the construction project; Supporting industries' employment, includes jobs in firms that provide inputs to the industries that directly provide materials and equipment used in highway construction. For example, a firm that produces guard rails is counted as 'construction oriented' employment but the firm that provides the sheet steel to make the guard rails is considered part of 'supporting industries' employment; and Induced employment, includes all of the jobs supported by consumer expenditures resulting from wages to 'construction oriented' and 'supporting industries' employment.

22 $1 billion of Federal-aid expenditure supported: 10,300 construction oriented jobs; 4,600 supporting industries' jobs; and 15,000 induced employment jobs $350 M in highway expenditures, according to FHWA, should translate into: 3600 construction oriented jobs; 1600 supporting industries' jobs; and 5250 induced employment jobs

23 Tuesday, January 26, 2010, from 4:00 p.m. to 6:00 p.m. at the Williamson County Pavilion, 1602 Sioux Drive, Marion, IL IDOT is seeking additional public feedback on development of its proposed Multi-Year Program for Highway Improvements

24 IDOTS WEBSITE www.dot.il.gov