Presentation is loading. Please wait.

Presentation is loading. Please wait.

Virtual Design and Construction Case Study Martin Fischer Cristina Garcia Calvin Kam John Kunz Kathleen Liston Marcus Schreyer Vibha Singhal.

Similar presentations


Presentation on theme: "Virtual Design and Construction Case Study Martin Fischer Cristina Garcia Calvin Kam John Kunz Kathleen Liston Marcus Schreyer Vibha Singhal."— Presentation transcript:

1

2 Virtual Design and Construction Case Study Martin Fischer Cristina Garcia Calvin Kam John Kunz Kathleen Liston Marcus Schreyer Vibha Singhal

3 Source: DPR

4 Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis

5 Site Plan

6 Construction Photos and Site Context

7 Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis

8 Site Plan

9 Construction Photos and Site Context

10 Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis

11 Site Plan

12 Construction Photos and Site Context

13 Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis

14 Site Plan AP AR AT

15 Construction Photos and Site Context

16 Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis

17 Common Point 4D Color Legend for iRoom Demo SimVision Color Legend for iRoom Demo Direct Work Hidden Work

18 3D Legend Diagram

19 Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis

20 Baseline Case Target 2002 Thanksgiving and Christmas season Tight site -> single crew per trade Low coordination risk, but little slack

21 Functional Requirements (Time and Cost)

22 Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis

23 DESCRIPTIVE (40%) When do we have access to retail zone AR-7? Where are you placing the crane? EXPLANATIVE (20%) What drives the turnover date for the theater? PREDICTIVE (10%) Can we get access to the parking a week earlier? EVALUATIVE (30%) Which acceleration alternative is better? How we spend time in meetings

24

25 4D Demo (Plan View)

26 4D Demo (Perspective View)

27 MSP and Time-Controller Demo

28 Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis

29 SimVision Demo (highlights activity received from MSP)

30 MSP sends activity to SimVision

31 Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis

32 Micro View

33 Macro ViewOrganization and Process

34 Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis

35 Predicted Critical Path Predicted Work Composition

36 Schedule Growth Risk Predicted Work Composition

37 Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis

38 Delay Case Hazardous materials found during excavation 2-month delay (MSP #56)

39

40 4D Demo (Baseline Case)

41 4D Demo (Delay Case)

42 MSP+Time Controller Demo (Delay Case)

43 Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis

44 Functional Requirements (Time)

45 Functional Requirements (Cost)

46 Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis

47 How to accelerate construction?

48

49 Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis

50 4D Demo Opportunities for Acceleration

51 MSP Demo Opportunities for Acceleration

52 Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis

53 AccelerationHybrid Case Concrete Acceleration Add crew on pile caps and grade beams (MSP #85, 151) Add horizontal formwork for soffits 2 and 3 (MSP #263, 270) Reuse horizontal formwork for theater Lv3 (MSP #421, 428) Rebar crew works overtime (11-hour day) Add crew for bolt-up and welding Steel Acceleration Add crew for fireproofing Steel erection and slab-on-deck crews work overtime work (11-hour day) MSP #708-737, 807-823

54

55 Concrete Acceleration Add crew on pile caps and grade beams (MSP #85, 151) Add horizontal formwork for soffits 2 and 3 (MSP #263, 270) Reuse horizontal formwork for theater Lv3 (MSP #421, 428) Rebar crew works overtime (11-hour day) Add crew for bolt-up and welding Steel Acceleration Add crew for fireproofing Steel erection and slab-on-deck crews work overtime work (11-hour day) MSP #708-737, 807-823

56 4D Demo (Hybrid Acceleration)

57 MSP Demo (Hybrid Acceleration)

58 Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis

59 Predicted Critical Path Predicted Work Composition

60 Position Backlog Resource Allocation

61 Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis

62 Comparison of Predicted Finish Dates Comparison of Predicted Work Composition Hybrid Acceleration Delay Case Hybrid Acceleration Delay Case

63 Comparison of Predicted Work Breakdown Hybrid Acceleration Delay Case

64 Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis

65 Functional Requirements (Time)

66 Functional Requirements (Cost)

67 Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis

68 cost increases as schedule is shortened

69

70 Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis

71 cost increases as schedule is shortened

72 Hybrid Steel Concrete Delay

73 Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis

74 Product No change (4D Model) Acceleration is possible (MS Project) Acceleration costs money (Excel) Coordination needs increase as schedule accelerates (SimVision) Organization Process VDC (iRoom) Summary of alternative analyses

75 The Macro Problem

76 Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis

77 to be the worlds premier academic research center for Virtual Design and Construction Virtual Design and Construction: develop and test new ways to model, visualize, analyze and evaluate the multi- disciplinary performance of design– construction projects to support explicit business objectives Education: increase awareness of the value and costs of strategic IT for practitioners and Stanford students CIFE Mission

78 Need: macro and micro problems require timely stakeholder involvement Tools available, effective, affordable –iRoom, 4D, organization, TEI, … Objectives and metrics exist –Management theory –Manufacturing Actions: 1.Plan your VDC implementation strategy 2.Become CIFE member; plan pilot Call to Action for VDC

79 Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis

80 Build project model early, before committing large money or time What –Product, process, organization How: –Detailed: to show the product, process, organization entities that use significant project time, money –Virtual: in the computer –Visual: multi-discipline, multi-view, for multiple stakeholders –Objective-based: set and track explicit public objectives VDC Big Ideas

81 Need: macro and micro problems require timely stakeholder involvement Tools available, effective, affordable –iRoom, 4D, organization, TEI, … Objectives and metrics exist –Management theory –Manufacturing Actions: 1.Plan your VDC implementation strategy 2.Become CIFE member; plan pilot Call to Action for VDC

82 The End

83

84


Download ppt "Virtual Design and Construction Case Study Martin Fischer Cristina Garcia Calvin Kam John Kunz Kathleen Liston Marcus Schreyer Vibha Singhal."

Similar presentations


Ads by Google