2
Virtual Design and Construction Case Study Martin Fischer Cristina Garcia Calvin Kam John Kunz Kathleen Liston Marcus Schreyer Vibha Singhal
3
Source: DPR
4
Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis
5
Site Plan
6
Construction Photos and Site Context
7
Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis
8
Site Plan
9
Construction Photos and Site Context
10
Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis
11
Site Plan
12
Construction Photos and Site Context
13
Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis
14
Site Plan AP AR AT
15
Construction Photos and Site Context
16
Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis
17
Common Point 4D Color Legend for iRoom Demo SimVision Color Legend for iRoom Demo Direct Work Hidden Work
18
3D Legend Diagram
19
Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis
20
Baseline Case Target 2002 Thanksgiving and Christmas season Tight site -> single crew per trade Low coordination risk, but little slack
21
Functional Requirements (Time and Cost)
22
Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis
23
DESCRIPTIVE (40%) When do we have access to retail zone AR-7? Where are you placing the crane? EXPLANATIVE (20%) What drives the turnover date for the theater? PREDICTIVE (10%) Can we get access to the parking a week earlier? EVALUATIVE (30%) Which acceleration alternative is better? How we spend time in meetings
25
4D Demo (Plan View)
26
4D Demo (Perspective View)
27
MSP and Time-Controller Demo
28
Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis
29
SimVision Demo (highlights activity received from MSP)
30
MSP sends activity to SimVision
31
Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis
32
Micro View
33
Macro ViewOrganization and Process
34
Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis
35
Predicted Critical Path Predicted Work Composition
36
Schedule Growth Risk Predicted Work Composition
37
Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis
38
Delay Case Hazardous materials found during excavation 2-month delay (MSP #56)
40
4D Demo (Baseline Case)
41
4D Demo (Delay Case)
42
MSP+Time Controller Demo (Delay Case)
43
Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis
44
Functional Requirements (Time)
45
Functional Requirements (Cost)
46
Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis
47
How to accelerate construction?
49
Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis
50
4D Demo Opportunities for Acceleration
51
MSP Demo Opportunities for Acceleration
52
Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis
53
AccelerationHybrid Case Concrete Acceleration Add crew on pile caps and grade beams (MSP #85, 151) Add horizontal formwork for soffits 2 and 3 (MSP #263, 270) Reuse horizontal formwork for theater Lv3 (MSP #421, 428) Rebar crew works overtime (11-hour day) Add crew for bolt-up and welding Steel Acceleration Add crew for fireproofing Steel erection and slab-on-deck crews work overtime work (11-hour day) MSP #708-737, 807-823
55
Concrete Acceleration Add crew on pile caps and grade beams (MSP #85, 151) Add horizontal formwork for soffits 2 and 3 (MSP #263, 270) Reuse horizontal formwork for theater Lv3 (MSP #421, 428) Rebar crew works overtime (11-hour day) Add crew for bolt-up and welding Steel Acceleration Add crew for fireproofing Steel erection and slab-on-deck crews work overtime work (11-hour day) MSP #708-737, 807-823
56
4D Demo (Hybrid Acceleration)
57
MSP Demo (Hybrid Acceleration)
58
Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis
59
Predicted Critical Path Predicted Work Composition
60
Position Backlog Resource Allocation
61
Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis
62
Comparison of Predicted Finish Dates Comparison of Predicted Work Composition Hybrid Acceleration Delay Case Hybrid Acceleration Delay Case
63
Comparison of Predicted Work Breakdown Hybrid Acceleration Delay Case
64
Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis
65
Functional Requirements (Time)
66
Functional Requirements (Cost)
67
Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis
68
cost increases as schedule is shortened
70
Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis
71
cost increases as schedule is shortened
72
Hybrid Steel Concrete Delay
73
Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis
74
Product No change (4D Model) Acceleration is possible (MS Project) Acceleration costs money (Excel) Coordination needs increase as schedule accelerates (SimVision) Organization Process VDC (iRoom) Summary of alternative analyses
75
The Macro Problem
76
Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis
77
to be the worlds premier academic research center for Virtual Design and Construction Virtual Design and Construction: develop and test new ways to model, visualize, analyze and evaluate the multi- disciplinary performance of design– construction projects to support explicit business objectives Education: increase awareness of the value and costs of strategic IT for practitioners and Stanford students CIFE Mission
78
Need: macro and micro problems require timely stakeholder involvement Tools available, effective, affordable –iRoom, 4D, organization, TEI, … Objectives and metrics exist –Management theory –Manufacturing Actions: 1.Plan your VDC implementation strategy 2.Become CIFE member; plan pilot Call to Action for VDC
79
Virtual Design and Construction Case Study Case Overview Baseline Delay Acceleration Summary and Analysis
80
Build project model early, before committing large money or time What –Product, process, organization How: –Detailed: to show the product, process, organization entities that use significant project time, money –Virtual: in the computer –Visual: multi-discipline, multi-view, for multiple stakeholders –Objective-based: set and track explicit public objectives VDC Big Ideas
81
Need: macro and micro problems require timely stakeholder involvement Tools available, effective, affordable –iRoom, 4D, organization, TEI, … Objectives and metrics exist –Management theory –Manufacturing Actions: 1.Plan your VDC implementation strategy 2.Become CIFE member; plan pilot Call to Action for VDC
82
The End