Presentation is loading. Please wait.

Presentation is loading. Please wait.

West Elementary School May 16, 2006 - 100% Construction Documents.

Similar presentations


Presentation on theme: "West Elementary School May 16, 2006 - 100% Construction Documents."— Presentation transcript:

1 West Elementary School May 16, 2006 - 100% Construction Documents

2

3 PRIME CONSTRUCTION CONTRACTS 1.General Construction 2.SItework 3.Food Facilities Equipment 4.Mechanical Construction 5.Electrical Construction 6.Temperature Controls

4 ALTERNATE BIDS 1A. Schlage Locks 1B. Sargent Locks 2. Terrazzo Flooring in Main Lobby & Main Corridor 3. Terrazzo Flooring in Cafeteria 4. Wood Flooring in Gymnasium 5. Vinyl Wall Covering in Admin. Areas 6. Blue Glass & Blue Storefront frames 7. Additional Storage Cabinets Above Cubbies in Classrooms 8. Two Additional Classrooms on 2-4 Classroom Wing 9. Altro Sheet Vinyl Floor in Kitchen (Deduct) 10. Perforated, Wavy Ceiling Panels in Corridors 11. Ceramic Wall Tile in Staff Toilets 115 & 116 on wet walls 12. FRP Exterior Doors 13. Baseball & Soccer/Football Fields

5 COST ESTIMATE

6 PROJECT SCHEDULE April 25, 2006 – May 9, 2006Cost Estimate Prepared for Bid Package #2 – 95% Construction Documents May 15, 2005Construction Documents are complete May 16, 2006Board Approval of Bid Package #2 Construction Documents May 22, 2006Construction Documents available to Contractors May 31, 2006Pre-bid Meeting June 16, 2006Bids Due June 20, 2006Board Approval of Bids June 26, 2006 – July 27, 2007Construction July 30, 2007 – August 10, 2007Owner Move In

7 Architects Conceptual Drawings

8

9

10

11

12

13


Download ppt "West Elementary School May 16, 2006 - 100% Construction Documents."

Similar presentations


Ads by Google