Presentation is loading. Please wait.

Presentation is loading. Please wait.

FOD Facilities Operations and Development November 1, 2011 Presented to Senate Cost Distribution Subcommittee.

Similar presentations


Presentation on theme: "FOD Facilities Operations and Development November 1, 2011 Presented to Senate Cost Distribution Subcommittee."— Presentation transcript:

1 FOD Facilities Operations and Development November 1, 2011 Presented to Senate Cost Distribution Subcommittee

2 What is FOD? Maintains grounds and provides utilities for the 1,762-acre Columbus main campus Maintains and cleans 250 buildings Provides environmental health and safety services Manages 500 active construction projects – spending over $243M/year 2 November 1, 2011

3 FOD Units Facilities Design & Construction Environmental Health & Safety Utilities Operations 3 November 1, 2011

4 4

5 Operations Performs campus maintenance, custodial, roads, landscaping and grounds services and offers an integrated service model that provides customers with a single point of contact and 24/7 service.

6 6

7 Utilities

8 8

9 Plant, Operations and Maintenance Funds FOD uses Plant, Operations and Maintenance (POM) funds to offset basic utilities, repairs, and ongoing maintenance and custodial costs in campus buildings. Repairs resulting from normal wear and tear, including repair of plumbing Maintenance of the building envelope (roof, windows, foundation, walls, floors) Maintaining clean and safe campus buildings POM rates are calculated yearly based on campus-wide planned costs per ASF calculated for utilities, custodial services, and maintenance. 9

10 FY 2012 POM Rates $8.07 Fuel purchase, utility debt service, utility operations Utilities $3.50 Includes Repair & Renovation $0.97/ ASF Maintenance $0.30 Building to $0.75/ ASF or approximately $5.5M annually Preventative Maintenance $0.65 Building endowment renewal Deferred Maintenance Renewal $0.39 Deferred Maintenance Projects $2.57 Custodial $15.48/ASF TOTAL 10


Download ppt "FOD Facilities Operations and Development November 1, 2011 Presented to Senate Cost Distribution Subcommittee."

Similar presentations


Ads by Google