RMSPP Physical Facilities Unit
2
REMAINING UNINSPECTED SCHOOL FURNITURE TO BE SCHEDULED FOR INSPECTION IN THE MONTH OF AUGUST 2011.
3
2011 BEFF SCHOOL BUILDING PROGRAM For DepEd Implementation (Red and Black) 100% of the total number of school divisions finished the bidding process. Majority of the Divisions issued Notice To Proceed (NTP). Implementation/Construction started in the month of July 2011. To be finished by EO December 2011. For DPWH Implementation (RSBP), DPWH is finalizing the consolidation of recipient schools.
4
Updates on Other Programs/Projects Inventory and Valuing of the Applied Nutrition Center (ANC) Physical Properties Finished conducting the actual inventory of Physical Properties/Buildings, costing of which shall be based on the guidelines in the Handbook on Property and Supply Management. (Inventory conducted August 1, 2011)
5
Proposed Asphalting of the DepEd Ecotech Center Circumferential Road Meeting with the Engineers and Ecotech Staff was done August 1, 2011 with the following concerned surfaced: -There is a need to undertake first the Rehabilitation of the existing Drainage System of the Center which is substandard. Rehab is On-going. -The group will still have to prepare the Technical Specifications of the project taking into consideration whether to use Cold Mix or Hot Mix, asphalting. -The group scheduled to visit technical experts from the DPWH.
6
San Pascual NAHS High-LIFE Training and Research Center Site visit and appraisal together with the DepEd Engineers was done last August 5, 2011 at San Pascual, Ubay, Bohol The observations are as follows: -There is a need to level-off the topmost portion of the hill where the proposed Training Center is to be constructed. This includes the opening of an access road going to the proposed project. -The school principal agreed to the proposal that he will prepare communication and make representations to the LGU concerned on the solution of the prevailing concerns.
7
-The group agreed to go on with the preparation of Plans and Specifications on the proposed structures to be build at the proposed training center. -There is an initial appropriation of P5.7M for the structures,
8
END OF REPORT THANKS