Enzyme Stabilized Mud (Earthen) Construction using DBV-1
(Project funded by NABARD) Supported by: Marketed by: Developed and MFG by: Technology Verified by:
2
Enzyme Stabilized Mud (Earthen) Construction
Modern building industry dealing with providing shelter comprises of using materials such as “Fired/burned/fused bricks”, “Cement” and “Steel” to produce rock solid buildings, at an astronomically rising cost, mainly due to the cost of producing the above mentioned products. Moreover, the buildings constructed from these materials are major energy guzzlers requiring energy to COOL, HEAT AND ILLUMINATE. EARTHEN BUILDINGS HAVE BEST INSULATION AGAINST HEAT AND COLD.
3
Enzyme Stabilized Mud (Earthen) Construction
Mud has been used as a construction building material for the last years. Mud offers the same versatility in construction offered by burnt clay bricks/blocks, and then even more. Offers to save up to 658kg of Carbondioxide emissions per 100 sq. foot of construction
4
Enzyme Stabilized Mud (Earthen) Construction
Enzyme(DBV-1) stabilized Mud blocks are cast in either: adobe method if the soil is permitting or using a press to make compressed earth blocks.
5
Enzyme Stabilized Mud (Earthen) Construction
Manual Adobe block mould Compressed Earth block press and mold
6
Enzyme Stabilized Mud (Earthen) Construction
DBV-1 stabilized Earthen Hollow blocks cast with already available machines in Nigeria
7
Enzyme Stabilized Mud (Earthen) Construction
DBV-1 stabilized Earthen Hollow blocks cast with already available machines in Nigeria
8
Enzyme Stabilized Mud (Earthen) Construction
Mud is mixed with DBV-1 and sufficient water and allowed to incubate until homogenous wetting and plasticity is achieved
9
Enzyme Stabilized Mud (Earthen) Construction
Mud is mixed with DBV-1 and sufficient water and allowed to incubate until homogenous wetting and plasticity is achieved
10
Enzyme Stabilized Mud (Earthen) Construction
Mud is mixed with DBV-1 and sufficient water and allowed to incubate until homogenous wetting and plasticity is achieved
11
Enzyme Stabilized Mud (Earthen) Construction
Earth mixed with water and DBV-1 soil stabilization enzyme cast into desired sized blocks.
12
Enzyme Stabilized Mud (Earthen) Construction
Earth mixed with water and DBV-1 soil stabilization enzyme cast into desired sized blocks.
13
Enzyme Stabilized Mud (Earthen) Construction
Adobe blocks cast and set to dry for 1-3 days
14
Enzyme Stabilized Mud (Earthen) Construction
Prior to any construction a proper base using stone or burnt clay bricks has to be prepared
15
Enzyme Stabilized Mud (Earthen) Construction
Prior to any construction a proper base using stone or burnt clay bricks has to be prepared
16
Enzyme Stabilized Mud (Earthen) Construction
Concrete with reinforced steel is used to add extra strength to the base of the construction to allow for resistance to Earthquakes (As per Building construction codes)
17
Enzyme Stabilized Mud (Earthen) Construction
Concrete with reinforced steel is used to add extra strength to the base of the construction to allow for resistance to Earthquakes (As per Building construction codes)
18
Enzyme Stabilized Mud (Earthen) Construction
Concrete with reinforced steel is used to add extra strength to the base of the construction to allow for resistance to Earthquakes (As per Building construction codes)
19
Enzyme Stabilized Mud (Earthen) Construction
Foundation built for a home of 22’ x 17’, with one partition wall to provide for two rooms. Plinth taken 1’ above highest recorded flood line
20
Enzyme Stabilized Mud (Earthen) Construction
A plastic sheet is placed on the concrete to further ensure no water via capillary action seeps into the earthen wall. Enzyme stabilized blocks are then placed onto the base, stuck to each other using mortar made from the same earth used to cast the blocks
21
Enzyme Stabilized Mud (Earthen) Construction
Enzyme stabilized blocks are now placed the same way conventional red clay burnt bricks are laid to construct a wall, the difference being they are stuck to each other using mortar made from the same earth used to cast the blocks
22
Enzyme Stabilized Mud (Earthen) Construction
Enzyme stabilized blocks are now placed the same way conventional red clay burnt bricks are laid to construct a wall, the difference being they are stuck to each other using mortar made from the same earth used to cast the blocks
23
Enzyme Stabilized Mud (Earthen) Construction
Enzyme stabilized blocks are now placed the same way conventional red clay burnt bricks are laid to construct a wall, the difference being they are stuck to each other using mortar made from the same earth used to cast the blocks
24
Enzyme Stabilized Mud (Earthen) Construction
How to Lay earthen wall using blocks cast of DBV-1
25
Enzyme Stabilized Mud (Earthen) Construction
Earthen Mortar used to cement the earthen blocks to each other
26
Enzyme Stabilized Mud (Earthen) Construction
27
Enzyme Stabilized Mud (Earthen) Construction
28
Enzyme Stabilized Mud (Earthen) Construction
29
Enzyme Stabilized Mud (Earthen) Construction
30
Enzyme Stabilized Mud (Earthen) Construction
Top coping made of concrete reinforced with steel bars. Arrangement to get slope to adjust roofing
31
Enzyme Stabilized Mud (Earthen) Construction
32
Enzyme Stabilized Mud (Earthen) Construction
33
Enzyme Stabilized Mud (Earthen) Construction
Water proofing application onto the earthen walls
34
Enzyme Stabilized Mud (Earthen) Construction
Water proofing application onto the earthen walls
35
Enzyme Stabilized Mud (Earthen) Construction
Post water proofing the basic structure is ready for outfitting of electrical and plumbing lines and any cosmetic work such as plasters.
36
Enzyme Stabilized Mud (Earthen) Construction
Smooth Plasters on walls
37
Enzyme Stabilized Mud (Earthen) Construction
Rough Plasters on walls
38
Enzyme Stabilized Mud (Earthen) Construction
Low Cost House Extension
39
Enzyme Stabilized Mud (Earthen) Construction
Low Cost House under Construction
40
Enzyme Stabilized Mud (Earthen) Construction
Finished Building
41
Enzyme Stabilized Mud (Earthen) Construction
Finished Building Interior
42
Enzyme Stabilized Mud (Earthen) Construction
Floors stabilized with Enzymes and Sealants
43
Enzyme Stabilized Mud (Earthen) Construction
THE CONSTRUCTED BUILDING CAN BE FITTED WITH WINDOWS AND DOORS OF CHOICE. THE FINISHED SURFACES CAN BE PAINTED WITH ANY COLOUR OF CHOICE OR CAN BE LEFT UNPAINTED TO ENJOY THE NATURAL COLOUR OF THE EARTH. FLOORINGS, LIGHT-FITTINGS, AND PLUMBING IS ALL DONE THE SAME WAY AS IN ANY OTHER CONSTRUCTED BUILDINGS.