DOE Review May, 2005 Steve Lewis

Similar presentations


Presentation on theme: "DOE Review May, 2005 Steve Lewis"— Presentation transcript:

1 DOE Review 10-12 May, 2005 Steve Lewis
X-ray Transport, Optics, and Diagnostics: Controls Status DOE Review May, Steve Lewis

2 Layout Each hutch is 10 m long FEH NEH FEE Tunnel Experiments:
Atomic Physics Front End Enclosure Fast Close Valve Slits Attenuators Shielding Experiments Optics Structual Bio Nano-scale Femtochem FEL Measurements & Experiments: Low Power Imaging High Power Imaging Spectrometer Calorimeter Flipper Mirror Experiments: Optics Warm Dense Matter

3 Major Effort Areas Getting an accurate count of all devices Naming devices (and extending SLC convention) Aligning XTOD controls devices with LCLS global standards Reviewing cost+schedule Installing EPICS at LLNL

4 Counting Devices Layout and instrument list has changed since original design Original design was not “EPICS-aware” LCLS-wide standards are (just) now being set All of above are basis for accurate cost+schedule

5 Will conform to (and extend) SLC conventions
Naming Devices Will conform to (and extend) SLC conventions Especially for “SLC-aware” devices Allows uniform notation on spread-sheets, one-line diagrams, as well as EPICS configuration Implicitly forces accurate counting

6 Safety must be engineered in
LCLS Global Standards Safety must be engineered in Commerical products are one way to ensure this (UL, CE, …) Initial Q/A will take place at LLNL for many items

7 Reviewing Cost+Schedule
Possible additions based on quick-look: I/O hardware and cabling costs Approx $200K to be added for master PLCs Configuring+Commissioning Effort Approx 1500 hours to be added for Tunnel Vacuum Licenses (PLC…)

8 Borrow small VME crate, CPU, EVR and EVG from SLAC
EPICS at LLNL Set up a server RH Linux or MacOS X? Keep CVS at SLAC Intellectual property issue? Borrow small VME crate, CPU, EVR and EVG from SLAC Gas Attenuator prototype is first application First use of PLC Will train LLNL staff