Download presentation
Presentation is loading. Please wait.
Published byBaby Whitham Modified over 10 years ago
1
DD DD GG GG GG MM MM MM AA AA L LL LL LL L Layout
2
What Is Layout Planning? What centres should the layout include? How much space and capacity does each centre need? How should each centres space be configured? Where should each centre be located?
3
Strategic Issues Facilitating the flow of materials Increasing the efficient utilization of labour and equipment Increasing customer convenience Reducing hazards to workers Improving employee morale Improving communication
4
Criteria for a Good Layout Maximum flexibility Maximum co-ordination Maximum use of volume Maximum visibility Maximum accessibility
5
Criteria for a Good Layout Minimum distance Minimum handling Minimum discomfort Inherent safety Maximum security Efficient material flow Identification
6
Layout Types Process Layout Product Layout Fixed-Position Layout Hybrid Layout - Cells
7
Layout Types - Process Layout
8
Organizes resources around the process and groups work stations or departments according to function Intermittent, low volume, high-variety
9
Layout Types - Process Layout Foundry Milling machines LathesGrinding PaintingDrills Office Welding Forging (a) Layout of a job shop
10
Layout Types - Process Layout (a) Layout of a job shop Foundry Milling machines LathesGrinding PaintingDrills Office Welding Forging
11
Layout Types - Process Layout (a) Layout of a job shop Foundry Milling machines LathesGrinding PaintingDrills Office Welding Forging
12
Layout Types - Process Layout (a) Layout of a job shop Foundry Milling machines LathesGrinding PaintingDrills Office Welding Forging
13
Layout Types - Process Layout Foundry Milling machines LathesGrinding PaintingDrills Office Welding Forging (a) Layout of a job shop
14
Layout Types - Process Layout Advantages General purpose, flexible resources are less capital intensive Less vulnerable to changes in product mix or new market strategies Equipment utilization can be higher, because not dedicated to one product line Employee supervision can be more specialized
15
Layout Types - Process Layout Disadvantages –Slower processing rates –Lost production time during setups –More capital and more floor space tied up with inventory –Longer manufacturing lead times –Costly materials handling, requiring variable path devices –Production planning and control more difficult
16
Layout Types - Process Layout A major challenge in designing process layouts is to identify dominant flow patterns among the jumbled traffic and to locate centres so that materials handling is minimized.
17
Layout Types - Product Layout
18
Dedicates resources to a product or closely related product family Repetitive, high-volume, continuous production Workstations or departments are arranged in a linear path, which is consistent with the routing sequence of the product.
19
Layout Types - Product Layout (b) Layout of a production line Station 1Station 2Station 3Station 4
20
Layout Types - Product Layout (b) Layout of a production line Station 1Station 2Station 3Station 4
21
Layout Types - Product Layout (b) Layout of a production line Station 1Station 2Station 3Station 4
22
Layout Types - Product Layout Station 1Station 2Station 3Station 4 (b) Layout of a production line
23
Layout Types - Product Layout Advantages Faster processing rates Lower inventories Infrequent setups
24
Layout Types - Product Layout Disadvantages –More risk of layout redesign –Less flexible –For low volume, dedicated resources have low utilization
25
Layout Types - Product Layout Challenge in designing product layouts –Minimize resources used to achieve desired output rate –Balance tasks, equalize the workload assigned to resources
26
Layout Types - Fixed-position Layout
27
Product is fixed in place. Resources come to the product, minimizing number of times product must be moved. Used for: Very large products, ships, roads, power plants, airplanes Service of fragile or bulky items
28
Layout Types - Fixed-position Layout Product Process
29
Layout Types - Fixed-position Layout Advantages –Material movement is reduced to a minimum. –The task is usually carried out by a gang of operators, hence continuity of operators and responsibility is required. –Production centres often operate independently of each other, and effective scheduling can be planned to ensure minimum total production time.
30
Layout Types - Fixed-position Layout Limitations –Movement of machines and equipment to the production centre may be costly and time consuming. –Positioning of the material or object or machines may be cumbersome and costly. –Machine and equipment utilisation is usually low, owing to handling and positioning time. –High grades of skill are required.
31
Muthers P-Q Chart
32
Group Technology
33
Machine 1 Machine 2 Machine 3 Machine 4 Machine 5 Materials in Finished goods out One Worker, Multiple Machines
34
Group Technology
35
Parts Families Source: Mikell P. Groover. Automation, Production Systems, and Computer-Aided Manufacturing. Englewood Cliffs, NJ: Prentice-Hall, 1980, p. 540. Used by permission.
36
Group Technology
37
Drilling DD DD Grinding GG GG GG Milling MM MM MM Assembly AA AA Lathing Receiving and shipping L LL LL LL L
38
Group Technology (a) Jumbled flows in a job shop without GT cells Drilling DD DD Grinding GG GG GG Milling MM MM MM Assembly AA AA Lathing Receiving and shipping L LL LL LL L
39
Group Technology (a) Jumbled flows in a job shop without GT cells Drilling DD DD Grinding GG GG GG Milling MM MM MM Assembly AA AA Lathing Receiving and shipping L LL LL LL L
40
Group Technology (a) Jumbled flows in a job shop without GT cells
41
Group Technology (b) Line flows in a job shop with three GT cells Cell 3 LM G G Cell 1 Cell 2 Assembly area A A L M D L L M Shipping D Receiving G
42
Group Technology (b) Line flows in a job shop with three GT cells Cell 3 LM G G Cell 1 Cell 2 Assembly area A A L M D L L M Shipping D Receiving G
43
Group Technology (b) Line flows in a job shop with three GT cells Cell 3 LM G G Cell 1 Cell 2 Assembly area A A L M D L L M Shipping D Receiving G
44
Group Technology (b) Line flows in a job shop with three GT cells Cell 3 LM G G Cell 1 Cell 2 Assembly area A A L M D L L M Shipping D Receiving G
46
Longhorn Machine
47
60' 90' Longhorn Machine Department Area Needed(ft 2 ) 1 Burr and grind1000 2 NC equipment950 3 Shipping and receiving750 4 Lathes and drills1200 5 Tool crib800 6 Inspection700 Total5400
48
60' 90' 243 651 Longhorn Machine Department Area Needed(ft 2 ) 1 Burr and grind1000 2 NC equipment950 3 Shipping and receiving750 4 Lathes and drills1200 5 Tool crib800 6 Inspection700 Total5400 Figure 10.6
49
60' 90' 243 651 Longhorn Machine
50
60' 90' 243 651 Longhorn Machine Trips Between Departments Department123456 1 Burr and grind 2 NC equipment 3 Shipping and receiving 4 Lathes and drills 5 Tool crib 6 Inspection
51
60' 90' 243 651 Longhorn Machine Trips Between Departments Department123456 1 Burr and grind202080 2 NC equipment1075 3 Shipping and receiving1590 4 Lathes and drills70 5 Tool crib 6 Inspection
52
60' 90' 243 651 Longhorn Machine
53
60' 90' 243 651 Longhorn Machine Closeness Rating Between Departments Department123456 1 Burr and grind 2 NC equipment 3 Shipping and receiving 4 Lathes and drills 5 Tool crib 6 Inspection
54
60' 90' 243 651 Longhorn Machine Closeness Rating Between Departments Department123456 1 Burr and grind 2 NC equipment 3 Shipping and receiving 4 Lathes and drills 5 Tool crib 6 Inspection Closeness Rating Rating Definition AAbsolutely necessary EEspecially important IImportant OOrdinary closeness UUnimportant XUndesirable
55
60' 90' 243 651 Longhorn Machine Closeness Rating Between Departments Department123456 1 Burr and grindEUIUA 2 NC equipmentOUEI 3 Shipping and receivingOUA 4 Lathes and drillsEX 5 Tool cribU 6 Inspection Closeness Rating Rating Definition AAbsolutely necessary EEspecially important IImportant OOrdinary closeness UUnimportant XUndesirable
56
60' 90' 243 651 Longhorn Machine Closeness Rating Between Departments Department123456 1 Burr and grindEUIUA 2 NC equipmentOUEI 3 Shipping and receivingOUA 4 Lathes and drillsEX 5 Tool cribU 6 Inspection Explanation Codes Code Meaning 1Materials handling 2Shared personnel 3Ease of supervision 4Space utilization 5Noise 6Employee attitudes
57
60' 90' 243 651 Longhorn Machine Closeness Rating Between Departments Department123456 1 Burr and grindEUIUA (3, 1)(2, 1)(1) 2 NC equipmentOUEI (1)(1)(6) 3 Shipping and receivingOUA(1) 4 Lathes and drillsEX (1)(5) 5 Tool cribU 6 Inspection Explanation Codes Code Meaning 1Materials handling 2Shared personnel 3Ease of supervision 4Space utilization 5Noise 6Employee attitudes
58
60' 90' 243 651 Longhorn Machine
59
60' 90' 243 651 Longhorn Machine 60' 90' 243 651 Departments 3 and 6 close together Departments 1 and 6 close together Departments 2 and 5 close together Departments 4 and 5 close together Figure 10.6
60
60' 90' 243 651 Longhorn Machine 60' 90' 43 Departments 3 and 6 close together Departments 1 and 6 close together Departments 2 and 5 close together Departments 4 and 5 close together Example 10.1
61
60' 90' 243 651 Longhorn Machine 60' 90' 43 Departments 3 and 6 close together Departments 1 and 6 close together Departments 2 and 5 close together Departments 4 and 5 close together 6 Example 10.1
62
60' 90' 243 651 Longhorn Machine 60' 90' 43 Departments 3 and 6 close together Departments 1 and 6 close together Departments 2 and 5 close together Departments 4 and 5 close together 61 Example 10.1
63
60' 90' 243 651 Longhorn Machine 60' 90' 43 Departments 3 and 6 close together Departments 1 and 6 close together Departments 2 and 5 close together Departments 4 and 5 close together 61 5 2 Example 10.1
64
60' 90' 243 651 Longhorn Machine 60' 90' 43 Departments 3 and 6 close together Departments 1 and 6 close together Departments 2 and 5 close together Departments 4 and 5 close together 61 5 2 Figure 10.7
65
60' 90' 243 651 Longhorn Machine
66
60' 90' 243 651 Longhorn Machine Trips Between Departments Department123456 1 Burr and grind202080 2 NC equipment1075 3 Shipping and receiving1590 4 Lathes and drills70 5 Tool crib 6 Inspection Example 10.2
67
60' 90' 243 651 Longhorn Machine Load Distance Analysis Current Plan Proposed Plan DeptClosenessDistanceDistance PairFactor, ld ld Scoredld Score 1,220 1,420 1,680 2,310 2,575 3,415 3,690 4,570 Example 10.2
68
60' 90' 243 651 Longhorn Machine Load Distance Analysis Current Plan Proposed Plan DeptClosenessDistanceDistance PairFactor, ld ld Scoredld Score 1,2203 1,4202 1,6802 2,3102 2,5752 3,4151 3,6903 4,5701 Example 10.2
69
60' 90' 243 651 Longhorn Machine Load Distance Analysis Current Plan Proposed Plan DeptClosenessDistanceDistance PairFactor, ld ld Scoredld Score 1,220360 1,420240 1,6802160 2,310220 2,5752150 3,415115 3,6903270 4,570170 ld =785 Example 10.2
70
60' 90' 243 651 Longhorn Machine Load Distance Analysis Current Plan Proposed Plan DeptClosenessDistanceDistance PairFactor, ld ld Scoredld Score 1,220360120 1,420240120 1,6802160180 2,310220330 2,5752150175 3,415115115 3,6903270190 4,570170170 ld =785 ld =400 Example 10.2
71
60' 90' 243 651 Longhorn Machine Load Distance Analysis Current Plan Proposed Plan DeptClosenessDistanceDistance PairFactor, ld ld Scoredld Score 1,220360120 1,420240120 1,6802160180 2,310220330 2,5752150175 3,415115115 3,6903270190 4,570170170 ld =785 ld =400 Example 10.2
72
A-1 Distribution Systems
73
Figure 10.8 DockAisle Storage area
74
A-1 Distribution Systems Trips to andArea Needed Departmentfrom Dock(blocks) 1.Toasters2801 2.Air conditioners1602 3.Microwaves3601 4.Stereos3753 5.TVs8004 6.Radios1501 7.Bulk storage1002 Example 10.3 DockAisle Storage area
75
A-1 Distribution Systems Trips to andArea Needed Departmentfrom Dock(blocks)RatioRank 1.Toasters2801280/1 = 280 2.Air conditioners1602160/2 = 80 3.Microwaves3601360/1 = 360 4.Stereos3753375/3 = 125 5.TVs8004800/4 = 200 6.Radios1501150/1 = 150 7.Bulk storage1002100/2 = 50 Example 10.3 DockAisle Storage area
76
A-1 Distribution Systems Trips to andArea Needed Departmentfrom Dock(blocks)RatioRank 1.Toasters2801280/1 = 2802 2.Air conditioners1602160/2 = 806 3.Microwaves3601360/1 = 3601 4.Stereos3753375/3 = 1255 5.TVs8004800/4 = 2003 6.Radios1501150/1 = 1504 7.Bulk storage1002100/2 = 507 Example 10.3 DockAisle Storage area
77
A-1 Distribution Systems Trips to andArea Needed Departmentfrom Dock(blocks)RatioRank 1.Toasters2801280/1 = 2802 2.Air conditioners1602160/2 = 806 3.Microwaves3601360/1 = 3601 4.Stereos3753375/3 = 1255 5.TVs8004800/4 = 2003 6.Radios1501150/1 = 1504 7.Bulk storage1002100/2 = 507 Example 10.3 DockAisle Storage area
78
A-1 Distribution Systems Trips to andArea Needed Departmentfrom Dock(blocks)RatioRank 1.Toasters2801280/1 = 2802 2.Air conditioners1602160/2 = 806 3.Microwaves3601360/1 = 3601 4.Stereos3753375/3 = 1255 5.TVs8004800/4 = 2003 6.Radios1501150/1 = 1504 7.Bulk storage1002100/2 = 507 Example 10.3 DockAisle Storage area 3
79
A-1 Distribution Systems Trips to andArea Needed Departmentfrom Dock(blocks)RatioRank 1.Toasters2801280/1 = 2802 2.Air conditioners1602160/2 = 806 3.Microwaves3601360/1 = 3601 4.Stereos3753375/3 = 1255 5.TVs8004800/4 = 2003 6.Radios1501150/1 = 1504 7.Bulk storage1002100/2 = 507 Example 10.3 DockAisle Storage area 3 1
80
A-1 Distribution Systems Trips to andArea Needed Departmentfrom Dock(blocks)RatioRank 1.Toasters2801280/1 = 2802 2.Air conditioners1602160/2 = 806 3.Microwaves3601360/1 = 3601 4.Stereos3753375/3 = 1255 5.TVs8004800/4 = 2003 6.Radios1501150/1 = 1504 7.Bulk storage1002100/2 = 507 Example 10.3 DockAisle Storage area 3 1 5 5 5 5
81
A-1 Distribution Systems Trips to andArea Needed Departmentfrom Dock(blocks)RatioRank 1.Toasters2801280/1 = 2802 2.Air conditioners1602160/2 = 806 3.Microwaves3601360/1 = 3601 4.Stereos3753375/3 = 1255 5.TVs8004800/4 = 2003 6.Radios1501150/1 = 1504 7.Bulk storage1002100/2 = 507 Figure 10.9 DockAisle Storage area 3 1 5 5 5 5 6427 4 4 27
82
Zone Systems
83
Shipping doors Tractor trailer Zones Figure 10.10
84
Zone Systems Click to add title Zones Shipping doors Tractor trailer Feeder lines Figure 10.10
85
Zone Systems Click to add title Zones Control station Shipping doors Tractor trailer Feeder lines Figure 10.10
86
Zone Systems Click to add title Zones Trunk line Control station Shipping doors Tractor trailer Overflow Feeder lines Figure 10.10
87
Addison Wesley Longman Distribution Center
88
Line Balancing Green Grass, Inc. Big Broadcaster
89
Line Balancing Big Broadcaster
90
Line Balancing Big Broadcaster ABolt leg frame to hopper40None BInsert impeller shaft30A CAttach axle50A DAttach agitator40B EAttach drive wheel6B FAttach free wheel25C GMount lower post15C HAttach controls20D, E IMount nameplate18F, G Total244 WorkTimeImmediate ElementDescription(sec)Predecessor(s) Example 10.4
91
Line Balancing Big Broadcaster ABolt leg frame to hopper40None BInsert impeller shaft30A CAttach axle50A DAttach agitator40B EAttach drive wheel6B FAttach free wheel25C GMount lower post15C HAttach controls20D, E IMount nameplate18F, G Total244 WorkTimeImmediate ElementDescription(sec)Predecessor(s) Example 10.4
92
Line Balancing Big Broadcaster ABolt leg frame to hopper40None BInsert impeller shaft30A CAttach axle50A DAttach agitator40B EAttach drive wheel6B FAttach free wheel25C GMount lower post15C HAttach controls20D, E IMount nameplate18F, G Total244 WorkTimeImmediate ElementDescription(sec)Predecessor(s) 40 A Example 10.4
93
Line Balancing Big Broadcaster ABolt leg frame to hopper40None BInsert impeller shaft30A CAttach axle50A DAttach agitator40B EAttach drive wheel6B FAttach free wheel25C GMount lower post15C HAttach controls20D, E IMount nameplate18F, G Total244 WorkTimeImmediate ElementDescription(sec)Predecessor(s) 40 30 B A Example 10.4
94
Line Balancing Big Broadcaster ABolt leg frame to hopper40None BInsert impeller shaft30A CAttach axle50A DAttach agitator40B EAttach drive wheel6B FAttach free wheel25C GMount lower post15C HAttach controls20D, E IMount nameplate18F, G Total244 WorkTimeImmediate ElementDescription(sec)Predecessor(s) 40 50 B C A 30 Example 10.4
95
Line Balancing Big Broadcaster ABolt leg frame to hopper40None BInsert impeller shaft30A CAttach axle50A DAttach agitator40B EAttach drive wheel6B FAttach free wheel25C GMount lower post15C HAttach controls20D, E IMount nameplate18F, G Total244 WorkTimeImmediate ElementDescription(sec)Predecessor(s) 40 50 30 40 D B C A Example 10.4
96
Line Balancing Big Broadcaster ABolt leg frame to hopper40None BInsert impeller shaft30A CAttach axle50A DAttach agitator40B EAttach drive wheel6B FAttach free wheel25C GMount lower post15C HAttach controls20D, E IMount nameplate18F, G Total244 WorkTimeImmediate ElementDescription(sec)Predecessor(s) 40 6 50 E 30 40 D B C A Example 10.4
97
Line Balancing Big Broadcaster ABolt leg frame to hopper40None BInsert impeller shaft30A CAttach axle50A DAttach agitator40B EAttach drive wheel6B FAttach free wheel25C GMount lower post15C HAttach controls20D, E IMount nameplate18F, G Total244 WorkTimeImmediate ElementDescription(sec)Predecessor(s) 40 6 50 E 30 25 40 D B F C A Example 10.4
98
Line Balancing Big Broadcaster ABolt leg frame to hopper40None BInsert impeller shaft30A CAttach axle50A DAttach agitator40B EAttach drive wheel6B FAttach free wheel25C GMount lower post15C HAttach controls20D, E IMount nameplate18F, G Total244 WorkTimeImmediate ElementDescription(sec)Predecessor(s) 40 6 50 15 E 30 25 40 D B F C A G Example 10.4
99
Line Balancing Big Broadcaster ABolt leg frame to hopper40None BInsert impeller shaft30A CAttach axle50A DAttach agitator40B EAttach drive wheel6B FAttach free wheel25C GMount lower post15C HAttach controls20D, E IMount nameplate18F, G Total244 WorkTimeImmediate ElementDescription(sec)Predecessor(s) 40 6 20 50 15 E 30 25 40 H D B F C A G Example 10.4
100
Line Balancing Big Broadcaster ABolt leg frame to hopper40None BInsert impeller shaft30A CAttach axle50A DAttach agitator40B EAttach drive wheel6B FAttach free wheel25C GMount lower post15C HAttach controls20D, E IMount nameplate18F, G Total244 WorkTimeImmediate ElementDescription(sec)Predecessor(s) 40 6 20 50 15 18 E 30 25 40 H I D B F C A G Example 10.4
101
Line Balancing Big Broadcaster 40 6 20 50 15 18 E 30 25 40 H I D B F C A G Figure 10.11
102
Line Balancing Big Broadcaster 40 6 20 50 15 18 E 30 25 40 H I D B F C A G Desired output rate = 2400/week Plant operates 40 hours/week Example 10.5
103
Line Balancing Big Broadcaster 40 6 20 50 15 18 E 30 25 40 H I D B F C A G Desired output rate = 2400/week Plant operates 40 hours/week r = 2400/40 = 60 units/hour Example 10.5
104
Line Balancing Big Broadcaster 40 6 20 50 15 18 E 30 25 40 H I D B F C A G Desired output rate = 2400/week Plant operates 40 hours/week r = 2400/40 = 60 units/hour c = 1/60 = 1 minute/unit = 60 seconds/unit Example 10.5
105
Line Balancing Big Broadcaster 40 6 20 50 15 18 E 30 25 40 H I D B F C A G Desired output rate = 2400/week Plant operates 40 hours/week c = 60 seconds/unit Example 10.5
106
Line Balancing Big Broadcaster 40 6 20 50 15 18 E 30 25 40 H I D B F C A G Desired output rate = 2400/week Plant operates 40 hours/week c = 60 seconds/unit TM = 244 seconds/60 seconds = 4.067 or 5 stations Example 10.5
107
Line Balancing Big Broadcaster 40 6 20 50 15 18 E 30 25 40 H I D B F C A G Desired output rate = 2400/week Plant operates 40 hours/week TM = 244 seconds/60 seconds = 4.067 or 5 stations Efficiency = [244\5(60)]100 = 81.3% c = 60 seconds/unit Example 10.5
108
Line Balancing Big Broadcaster 40 6 20 50 15 18 E 30 25 40 H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% Example 10.6
109
Line Balancing Big Broadcaster 40 6 20 50 15 18 E 30 25 40 H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% CummIdle StationCandidateChoiceTimeTime Example 10.6
110
Line Balancing Big Broadcaster 40 6 20 50 15 18 E 30 25 40 H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% CummIdle StationCandidateChoiceTimeTime S1AA4020 Example 10.6
111
Line Balancing Big Broadcaster 40 6 20 50 15 18 E 30 25 40 H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% CummIdle StationCandidateChoiceTimeTime S1AA4020 Example 10.6
112
Line Balancing Big Broadcaster 40 6 20 50 15 18 E 30 25 40 H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% CummIdle StationCandidateChoiceTimeTime S1AA4020 S1 Example 10.6
113
Line Balancing Big Broadcaster 40 6 20 50 15 18 E 30 25 40 H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% CummIdle StationCandidateChoiceTimeTime S1AA4020 S2B,CC5010 S1 Example 10.6
114
Line Balancing Big Broadcaster 40 6 20 50 15 18 E 30 25 40 H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% CummIdle StationCandidateChoiceTimeTime S1AA4020 S2B,CC5010 S1 Example 10.6
115
Line Balancing Big Broadcaster 40 6 20 50 15 18 E 30 25 40 H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% CummIdle StationCandidateChoiceTimeTime S1AA4020 S2B,CC5010 S1 S2 Example 10.6
116
Line Balancing Big Broadcaster 40 6 20 50 15 18 E 30 25 40 H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% CummIdle StationCandidateChoiceTimeTime S1AA4020 S2B,CC5010 S3B,F,GB3030 S1 S2 Example 10.6
117
Line Balancing Big Broadcaster 40 6 20 50 15 18 E 30 25 40 H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% CummIdle StationCandidateChoiceTimeTime S1AA4020 S2B,CC5010 S3B,F,GB3030 S1 S2 Example 10.6
118
Line Balancing Big Broadcaster 40 6 20 50 15 18 E 30 25 40 H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% CummIdle StationCandidateChoiceTimeTime S1AA4020 S2B,CC5010 S3B,F,GB3030 S1 S2 Example 10.6
119
Line Balancing Big Broadcaster 40 6 20 50 15 18 E 30 25 40 H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% CummIdle StationCandidateChoiceTimeTime S1AA4020 S2B,CC5010 S3B,F,GB3030 E,F,GF555 S1 S2 Example 10.6
120
Line Balancing Big Broadcaster 40 6 20 50 15 18 E 30 25 40 H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% CummIdle StationCandidateChoiceTimeTime S1AA4020 S2B,CC5010 S3B,F,GB3030 E,F,GF555 S1 S2 Example 10.6
121
Line Balancing Big Broadcaster 40 6 20 50 15 18 E 30 25 40 H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% CummIdle StationCandidateChoiceTimeTime S1AA4020 S2B,CC5010 S3B,F,GB3030 E,F,GF555 S1 S2 S3 Example 10.6
122
Line Balancing Big Broadcaster 40 6 20 50 15 18 E 30 25 40 H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% S1 S2 S3 Example 10.6
123
Line Balancing Big Broadcaster 40 6 20 50 15 18 E 30 25 40 H I D B F C A G c = 60 seconds/unit TM = 5 stations Efficiency = 81.3% S1 S2 S3 S5 S4 Figure 10.12