Alternative Project Delivery: Lessons Learned and Yet to be Learned

Similar presentations


Presentation on theme: "Alternative Project Delivery: Lessons Learned and Yet to be Learned"— Presentation transcript:

1 Alternative Project Delivery: Lessons Learned and Yet to be Learned
Shivaji Deshmukh, executive Manager (Engr & Ops), West Basin MWD Tim Busch, GM, Woodland Davis CWA Neil Callahan, Director, Louis Berger US Bob Siemak, Moderator, AGM, United Water CD

2 What is Alternative Project Delivery and Why Use it?
Delivering a project other than by the traditional project delivery method (i.e. design-bid-build) ISSUE TRADITIONAL ALTERNATIVE Control/Risk Sharing Owner DB/O/F entity Time Slower (Series) Faster (Parallel) Cost Price (Low Bid) Best Value Complexity Std Approach Innovation

3 APD is all about control of various phase of a project: life cycle approach
Plan Finance Design Build Operate

4 Owner does it all Rare; Limited to large agencies MWD of SC LADWP
Plan Finance Design Build Operate OWNER Rare; Limited to large agencies MWD of SC LADWP Projects are usually repair and replacement Pipelines are most common facilities

5 Traditional Delivery (DBB)
Plan Finance Design Build Operate OWNER Design Build PARTNER Owner has control but also most of the risk Low Bidder

6 DBB structure Design/Builder finger pointing More detailed design
Owner Designer Builder Design/Builder finger pointing More detailed design Longer time (series activities) Cost established late

7 DBB variation – Construction Management at Risk (CMAR)
Owner Designer Builder ( or CMAR) Quals-based Selection More collaboration Cost (GMP)at 60%

8 West Basin MWD Design Build (DB) Plan Finance Design Build Operate
OWNER West Basin MWD Design-Build Entity PARTNER

9 BD Structure Who leads team Contractor Integrated Firm JV
Owner Who leads team Contractor Integrated Firm JV Performance vs. Prescriptive Lump Sum or Progressive DB Entity Designer Builder

10 Design Build Operate (DBO)
Plan Finance Design Build Operate OWNER Woodland Davis CWA Design-Build-Operate Entity PARTNER

11 DBO Structure Term is key 5 to 15 years Operator is guarantor
Limited No. of Ops firms Owner DBO Entity Designer Builder Operator

12 DBO Structure Term is usually short (1-3 yrs)
Start-up, commissioning and validation More competitive landscape Like DB Owner DBO Entity Designer Builder Operator

13 Design Build Finance Operate (DBFO)
Plan Finance Design Build Operate OWNER Carlsbad Ocean Desalination DBFO Entity PARTNER

14 DBOF Structure DBFO Entity is financially sophisticated Debt vs Equity
Investment Grade Debt Owner DBFO Entity Financing Partner Designer Builder Operator