Agenda Presentations - Kerr Director Updates - Gilliam Other
Construction Funds Review MR/MS/HS bids Review MR & MS Abatement bids Construction Budget Review Review PennDOT Grant aka Pedestrian Safety Improvement Project NV Change Orders Furniture Updates Review Summer Hire List Director Updates - Gilliam NV/MR Summer Prep, Store & Clean Plan Summer Auction Planning Geothermal RFP Dectron Unit Pool Water Refresh Roof Updates Other
3
Funds
4
MR / MS / HS Project Bid
5
Abatement bid summary
6
Newville Plan
7
Newville Project
8
Middle School budget
9
MS budget revised
10
Middle school 2018 bids
11
Mt. Rock budget
12
Mt. Rock Revised Budget
13
Mt Rock 2018 bids
14
High School budget
15
Hs budget revised
16
HS 2018 bids
17
Oak flat
18
In the end
19
A long, long time a go….. In 2015:
20
Pedestrian Safety
21
Pedestrian Safety Improvement project Spec
The BSSD Pedestrian Safety Improvements Project base bid includes the following items: Raised intersection at Mt. Rock Road/Lefever/High School Access Drive intersection. Two Speed Humps along Mt. Rock Road. Crosswalk with flashing warning sign system at Mt. Rock Road/Lefever/High School Access Drive intersection. Pavement overlay of Mt. Rock Road between speed humps and raised intersection. Sidewalk and associated accessible ramps from the crosswalk at Mt. Rock Road/Lefever/High School Access Drive intersection to the Administrative Building access drive. Associated/required stormwater improvements (Raingarden). Intersection lighting of Mt. Rock Road/Lefever/High School Access Drive intersection. Four new School Speed Zone Flashing Warning Beacons at Newville Elementary School. Four new School Speed Zone Flashing Warning Beacons at Mt. Rock Campus. Network system to remotely control new school signals. Speed Limit signs for Lefever Road. Associated road signs and pavement markings.
22
Pedestrian Safety Alternates
Alternate 1 includes: Two Flashing warning signs for Oak Flat Elementary School to replace existing. Alternate 2 includes: Replace three existing School Speed Zone Flashing Warning Beacons at Mt. Rock Campus. Replace existing School Bus Crossing Flashing Warning Beacons at High School access drive. Alternate 3 includes: Sidewalk and associated accessible ramps from the Administrative Building access drive to the Big Spring Middle School (Replaces existing 3 foot wide sidewalk). Alternate 4 includes: Sidewalk and associated accessible ramps from the crosswalk at Mt. Rock Road/ Lefever/High School Access Drive intersection to the Mt. Rock Elementary School.
23
Change orders
24
Newville Furniture
25
Flexible Furniture (out for bid)
26
Summer Hires
27
Director updates NV/MR Summer Prep, Store & Clean Plan
Summer Auction Planning Geothermal RFP Dectron Unit Pool Water Refresh Roof Updates
29
Newville
32
Geothermal head end
33
Schedule of values
34
Schedule of values (cont.)
36
Schedule of values (cont.2)
37
Tentative summer schedule
38
Summer teams
39
Auction planning 25 June Inventory Items 2-18 July Auction
23 July Board approves sale Property Pickup