Download presentation
Presentation is loading. Please wait.
1
The New Equine Hospital
2
The New Equine Clinic. New treatment facilities:-
Two operating theatres – one specifically for colic surgery A dental theatre. A theatre for standing surgery A radiography room. A medicine / ultrasound room. Two consulting rooms
3
The New Equine Clinic. Better client facilities including:-
A proper waiting room with real coffee! A private client meeting room to view X rays and discuss your horse. Improved parking facilities for even the largest horse box A 58 seat client seminar room for meetings and educational events.
4
The New Equine Clinic. Better staff facilities:-
Proper office space for telephone answering and administration. A staff kitchen and rest area. A health and fitness room. Onsite accommodation for three students. A resident’s flat.
5
The New Equine Clinic.
6
The New Equine Clinic.
7
Preparatory work started in August to provide temporary staff parking, a new hard lunge ring and level tarmac trot up.
8
Site clearance started in the first week of Sept.
Over 1000 metric tonnes of stone brought in to establish a level base and dry working area.
9
Foundations poured 2nd week Sept.
10
First Week in Oct saw the portal frame taking shape.
11
2nd week of Oct – Portal frame completed
12
3rd week in October – roof fitted.
13
Last week In October
14
First week of November.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.