Presentation is loading. Please wait.

Presentation is loading. Please wait.

Project PORTLINK Customer Workshops DECEMBER 2004

Similar presentations


Presentation on theme: "Project PORTLINK Customer Workshops DECEMBER 2004"— Presentation transcript:

1 Project PORTLINK Customer Workshops DECEMBER 2004

2 AGENDA Welcome & Introductions Portlink Overview Project Methodology
Functionality Process Flows EDI Messages Technical Architecture Minimum User Requirements Questions Way forward

3 PORTLINK Overview

4 Alignment with e-port vision
To create a single point of access to NPA transactions and information for all Stakeholders The focus is to improve cargo flow and planning processes, especially marine operational efficiencies in the ports of South Africa.

5 THE VISION

6 What is Portlink? It is a service request and information system that provides real time access to information It maintains transactional details of billable activities provided through a secure web accessible interface

7 Project Methodology

8 Project Methodology The Rational Unified Process methodology is utilized for the implementation of Portlink and is characterized by the following phases: Inception Elaboration Construction and Development Transition

9 RUP Methodology 17 December 2004 September 2004

10 PORTLINK Functionality, Process Flows and EDI Messages

11 Portlink Functionality
Real-time visibility Marine operations visibility Marine services requests Dangerous goods declaration Work and bunker permits Electronic submission of cargo documentation Cargo dues orders Manifests Outturn reports

12 Vessel Arrival Notification Online Capture
Port Control/ Harbour Master ID 100 Agent Marine Operations NPA SAP Terminal Operators

13 Vessel Arrival Notification EDI Message
Port Control/ Harbour Master IFTSAI Agent Marine Operations NPA SAP Terminal Operators

14 Cargo Dues Order Online Capture and EDI
EDI Message NPA SAP Agent

15 Manifest Submission EDI Message
CUSCAR EDI Message NPA SAP Agent

16 Outturn Reports Online Capture and EDI Message
NPA SAP Terminal Operators

17 EDIFACT Message Process Flow
EDIFACT/XML XML NPA SAP CLIENT EDIFACT/XML XML

18 EDI Messages Message Purpose IFTSAI IFTDGN CUSCAR CARGO DUES
This EDI Message contains all information related to a vessel that arrives at the port e.g. Vessel Name, Voyage Number, Vessel Call Sign. This critical data will be utilized to generate an arrival number. IFTDGN This message contains all information related to dangerous goods that will be transported, loaded and/or discharged at any South African Port. The information provided will provide details needed to ensure the overall safety of the port system. CUSCAR This EDI message contains all information related to commodities loaded or discharged in any South African port, and will be utilized for collation and statistics. CARGO DUES (Custom XML) This message would contain all the information that NPA requires for cargo that will be handled and triggers the billing/invoicing process. INVOIC This message contains invoice information.

19 Technical Architecture

20 Technical Architecture
NPA USERS APPLICATION INTEGRATION DATA STORE PORTAL DB DEDICATED BANDWIDTH HTTP & Network Dispatcher FIREWALL FIREWALL CLIENTS APPLICATION INTEGRATION DATA STORE PORTAL DB

21 Minimum User Requirements

22 Minimum User Requirements
Two Alternatives Internet connection which will enable access to PORTLINK and web templates that need to be completed and submitted Own systems with the ability to construct, send and receive EDIFACT messages

23 Questions ?

24 Way Forward

25 Way Forward Presentation Handouts Future Port Sessions
PORTLINK Project Updates User Participation

26 Contact Information Akesh Lalla – Project Manager (011) Reyhana Karim – B2B Stream Lead PORTLINK Project Office (011)

27 Thank You


Download ppt "Project PORTLINK Customer Workshops DECEMBER 2004"

Similar presentations


Ads by Google