Download presentation
Presentation is loading. Please wait.
Published by番 刁 Modified over 6 years ago
1
Republic of Kazakhstan Priority Issues in 7 Major River Basins
Priority Problems - Identification and Ranking 7-Nov-18 Fritz Schwaiger
2
Priority Issues in 7 Major River Basins Applied Methodology
Inception workshop (internal) River basin background papers River basin workshops Presentation of background papers Identification of priority problems Ranking of priority problems (1 ÷ 3); protocols Draft project report Background papers, problems, assessment Final workshop Agree on priority problems; Agree on strategy of problem solution 7-Nov-18 Fritz Schwaiger
3
Priority Issues in 7 Major River Basins Involved Experts and Organisations
7-Nov-18 Fritz Schwaiger
4
Priority Issues in 7 Major River Basins Number and Priority of Identified Problems
7-Nov-18 Fritz Schwaiger
5
Priority Issues in 7 Major River Basins Priority Ranking Criteria
Reliable water supply of sufficient quantity Adverse effect on environment Quality water supply, meeting standards Affected population (health – discomfort – economic disadvantage) Economic productivity (added value) Cost of alternatives (opportunity cost) Realisation time needed 7-Nov-18 Fritz Schwaiger
6
Priority Issues in 7 Major River Basins Verification of Applied Ranking
7-Nov-18 Fritz Schwaiger
7
Priority Issues in 7 Major River Basins Structuring of 136 Problems
Geographically (by river basins) Project type institutional/legal Monitoring Infrastructure Water uses (sub-sectors) 7-Nov-18 Fritz Schwaiger
8
Priority Issues in 7 Major River Basins Problems Grouped by Type
7-Nov-18 Fritz Schwaiger
9
Priority Issues in 7 Major River Basins Problems Grouped by Water Uses (Sectors)
136 Priority Problems 7-Nov-18 Fritz Schwaiger
10
Priority Issues in 7 Major River Basins Problems by Water Uses and Basin
7-Nov-18 Fritz Schwaiger
11
Republic of Kazakhstan Priority Issues in 7 Major River Basins
The Priority Problems of Water Management 7-Nov-18 Fritz Schwaiger
12
Priority Issues in 7 Major River Basins Resource or Management Problem?
7-Nov-18 Fritz Schwaiger
13
Priority Issues in 7 Major River Basins Resource or Management Problem?
7-Nov-18 Fritz Schwaiger
14
Priority Issues in 7 Major River Basins Water Resources Distribution
UC 33 mm/a 5,723 m³/c BA 37 mm/a 5,042 m³/c Ir 68 mm/a 7,229 m³/c Is 5 mm/a 643 m³/c NS 4 mm/a 1,054 m³/c ST 24 mm/a 5,165 m³/c SD TT 1,081 m³/c International Data: Kazakhstan 21 mm/a Spain mm/a Eastern E. 100 mm/a Europe 314 mm/a Austria mm/a Norway mm/a mm/a = runoff height per basin area m³/c = m³ per capita in basin area 7-Nov-18 Fritz Schwaiger
15
Priority Issues in 7 Major River Basins Fresh Water Withdrawals (m³/capita,a)
Kazakhstan In 1999: 1275 m³/c,a In 1993: 2000 m³/c,a Source: OECD 7-Nov-18 Fritz Schwaiger
16
Priority Issues in 7 Major River Basins Magnitude of the Problem [36]
(19) water resources and demand management problems per se, i.e. 5 improve management, rational water use, ecosystem management, monitoring, data base 4 develop complex use and protection of water resources 3 make inventory and assessment of hydro infrastructure including small dams 3 improve reservoir operation 2 investigate alternative resources, groundwater 1 improve project coordination 1 center for Caspian sea level research 7-Nov-18 Fritz Schwaiger
17
(6) provide state financing
Priority Issues in 7 Major River Basins Magnitude of the Problem [36] (contd.) (6) provide state financing 3 create a water fund (for capital investment), set realistic tariffs 3 financial support for the operation of the Satpaev canal (IKC) (4) transboundary problems (3) stronger involvement of NGOs (2) rehabilitation and safety of dams (2) construct new infrastructure (Volga-Ural canal, Emba dam) 7-Nov-18 Fritz Schwaiger
18
Priority Issues in 7 Major River Basins Causes of the Problems
Political changes since 1991 Frequent change of institutions in charge (duties, responsibilities, financial means) Terminated financing from central government Transition from plan to market economy Change in economy: different needs Different way of thinking (users, organisations) Legislature (need for modern water code and implementation decrees) 7-Nov-18 Fritz Schwaiger
19
Priority Issues in 7 Major River Basins Proposed Strategy (1)
Guiding Principles (Dublin Principles ´92) Fresh water is finite vulnerable resource Participatory approach, involve all stakeholders Women role in water management Water is an economic good 7-Nov-18 Fritz Schwaiger
20
Priority Issues in 7 Major River Basins Proposed Strategy (2)
Policy paper (EU Framework Directive) Protection of all waters (surface and groundwater) Achieve good status for all waters (coordinate objectives) Water management based on river basins (plan) Combined approach: emission limits and quality standards (immission) Get prices right (true costs, but with derogations) Public participation Adopt legislation (water code) 7-Nov-18 Fritz Schwaiger
21
River Basin Management Plan: Objectives:
Priority Issues in 7 Major River Basins Proposed Strategy: Basin Planning River Basin Management Plan: Objectives: Establish environmental objectives for each water body Describe measures to be put in place to achieve them To be updated (6 year cycles) 7-Nov-18 Fritz Schwaiger
22
Supplementary measures
Priority Issues in 7 Major River Basins Proposed Strategy: Basin Planning Mandatory measures: Point source pollution Diffuse source pollution Abstractions Impoundments Engineering works (facilities) Register of protected areas Supplementary measures Economic or fiscal instruments Recreation and restoration of wetlands etc. 7-Nov-18 Fritz Schwaiger
23
Individual Solutions e.g. Helsinki convention for UNECE countries
Priority Issues in 7 Major River Basins Proposed Strategy: Transboundary Individual Solutions e.g. Helsinki convention for UNECE countries Prevent, control and reduce any transb. impact Any action to attach pollution at source Precautionary principle Polluter pays principle Manage resources sustainably Establish monitoring program for transb. waters Cooperate on basis of bilateral agreements Cooperate in research and technology for pollution reduction 7-Nov-18 Fritz Schwaiger
24
Priority Issues in 7 Major River Basins Proposed Priority Projects (1 of 2)
7-Nov-18 Fritz Schwaiger
25
Priority Issues in 7 Major River Basins Proposed Priority Projects (2 of 2)
7-Nov-18 Fritz Schwaiger
26
Republic of Kazakhstan Priority Issues in 7 Major River Basins
The Priority Problems of Legislation and Institutions 7-Nov-18 Fritz Schwaiger
27
Priority Issues in 7 Major River Basins Magnitude of the Problem [12]
(5) weakness of institutions – capacity and power (3) new water code needed (3) inadequate water tariff and pricing system (1) re-define Water Pollution Index 7-Nov-18 Fritz Schwaiger
28
Priority Issues in 7 Major River Basins Proposed Strategy
Modern water code (on its way) Strengthen Institutions Committee for Water Resources River Basin Authorities Several models exist; use international experience and adopt to local conditions Nura Ishim River Basins Management (pilot) Project 7-Nov-18 Fritz Schwaiger
29
Priority Issues in 7 Major River Basins Proposed Priority Project
7-Nov-18 Fritz Schwaiger
30
Republic of Kazakhstan Priority Issues in 7 Major River Basins
The Priority Problems of Urban Water Supply and Wastewater Disposal 7-Nov-18 Fritz Schwaiger
31
Priority Issues in 7 Major River Basins Characteristic of the Problem
8.38 million = urban population = 56% of total (1999) 7-Nov-18 Fritz Schwaiger
32
Priority Issues in 7 Major River Basins Characteristic of the Problem
8.38 million = urban population 56% (1999) Municipal Water Supply 70-75% water supply connection rate 75-80% comply with quality norms (52-60%) Wastewater Disposal 60-70% Sewage collection thereof 10-15% mechanically treated thereof 65-70% mech-bio treated (40-50%) 7-Nov-18 Fritz Schwaiger
33
Priority Issues in 7 Major River Basins Rehabilitation Needs
7-Nov-18 Fritz Schwaiger
34
Priority Issues in 7 Major River Basins Magnitude of the Problem [22]
(8) rehabilitation of water distribution & transmission lines (6) build/rehabilitate wastewater treatment plants and sewers (3) rehabilitate wells, groundwater development (2) improve water treatment plant (2) improve water and sewerage (1) drainage and storm water disposal 7-Nov-18 Fritz Schwaiger
35
Priority Issues in 7 Major River Basins Causes of the Problems
Central government funds ceased Huge discrepancy between produced ( l/c,d) and consumed ( l/c,d) Physical losses (up to 60% and more Wastage (no metering) Waste of resources (energy, chemicals, personnel) Low revenue collection Lack of modern admin. & management Huge backlog of investments Many cities have water quality problems 7-Nov-18 Fritz Schwaiger
36
Priority Issues in 7 Major River Basins Causes of the Problems
Deterioration of infrastructure Estimated required investments in sector water: $ 1.1 bln. Assets / service level service level book value 25 50 years today 7-Nov-18 Fritz Schwaiger
37
Priority Issues in 7 Major River Basins Proposed Priority Projects (1 of 2)
7-Nov-18 Fritz Schwaiger
38
Priority Issues in 7 Major River Basins Proposed Priority Projects (2 of 2)
7-Nov-18 Fritz Schwaiger
39
Republic of Kazakhstan Priority Issues in 7 Major River Basins
The Priority Problems of Rural Water Supply and Sanitation 7-Nov-18 Fritz Schwaiger
40
Priority Issues in 7 Major River Basins Magnitude of the Problem [12]
6.58 million rural population = 44% (1999) 7845 settlements (average 840 people) Supply coverage reduced ( ): settlements: % 2687 rural population: from 45% ~25% Non-compliance with quality standards: 30% Almaty, 90% Zhambyl Oblast of operating systems; infection diseases increase 7-Nov-18 Fritz Schwaiger
41
Priority Issues in 7 Major River Basins Causes of the Problem
State stopped operation of large irrigation systems which provided also water supply Some piped systems are unaffordable for rural population Ownership of facilities often unclear New owner cannot afford rehabilitation 7-Nov-18 Fritz Schwaiger
42
Priority Issues in 7 Major River Basins Proposed Strategy
Demand responsive approach: Focus on what users want, what they are willing to pay and what they can sustain Local community is the driving force Need for a strong local water committee (women role) Water to be treated as an economic asset Private sector provides goods and services Full cost recovery for operation and maintenance 7-Nov-18 Fritz Schwaiger
43
Feasibility Studies required
Priority Issues in 7 Major River Basins Proposed Strategy: Studies Required Feasibility Studies required What is actual water demand? What is affordability and willingness? Study alternative sources available Define service level Define least cost solution covering demand Define investment and operation cost Define owner and operator Define tariff and subsidy regime (sustainable) 7-Nov-18 Fritz Schwaiger
44
Priority Issues in 7 Major River Basins Proposed Priority Projects
7-Nov-18 Fritz Schwaiger
45
Priority Issues in 7 Major River Basins Proposed Priority Projects
Thank you for your attention 7-Nov-18 Fritz Schwaiger
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.