ASSTAR Project Overview & User Forum Objectives
Advanced Safe Separation Technologies and Algorithms ASSTAR User Forum #1 at ASAS-TN2 Workshop in Rome, 4th April 2006 ASSTAR Project Overview & User Forum Objectives ASSTAR is a Specific Targeted REsearch Project (STREP) sponsored by The European Commission – Directorate General RTD - within the 6th Framework Programme (contract number AST4-CT ). The programme started in January 2005 and is expected to extend to November 2007.
2
ASSTAR User Forum #1 in Rome, 4th April 2006
Project Overview Use of ADS-B for Airborne Separation Assistance System (ASAS) ASAS Package 2/3 Crossing and Passing Applications Delegation of separation responsibility Radar and Oceanic Environments Research approach supporting introduction in time frame ASAS manoeuvre design and execution Definition of supporting procedures Air & Ground installation & implementation issues Benefits Safety assessment Impact on Regulations ASSTAR User Forum #1 in Rome, 4th April 2006
3
Operational Environment
ASSTAR User Forum #1 in Rome, 4th April 2006
4
ASSTAR User Forum #1 in Rome, 4th April 2006
Project Objectives Establish a number of well-defined ASAS Package 2/3 applications Reach a common endorsement between the airlines and ANSPs on the proposed applications Regular project User Workshops are planned to ensure the involvement of key users at the detailed level (two UW held so far) Public User Forums to achieve wider dissemination and elicit responses from a broad representation of the Air Transport community (this is the first UF) ASSTAR User Forum #1 in Rome, 4th April 2006
5
Work Package structure
WP1 Concepts & Scenarios WP3 Oceanic Simulations WP2 C&P in Radar Airspace WP5 Implementation &Infrastructure WP4 Procedure Definition WP6 Safety Assessment WP7 Dissemination & Exploitation Cost Benefit Analysis & Results User Forums Package 2 Applications & Procedures Regulatory Impact ASSTAR User Forum #1 in Rome, 4th April 2006
6
ASSTAR User Forum #1 in Rome, 4th April 2006
Consortium Partners EUROCONTROL ASSTAR User Forum #1 in Rome, 4th April 2006
7
ASSTAR User Forum #1 in Rome, 4th April 2006
User Forum Objectives Presentation of the results of work performed so far to secure the appropriate involvement of major stakeholders Radar Lateral Crossing & Passing operational concept and procedures Algorithm design for Crossing & Passing applications Oceanic operational concept and procedures Benefit appraisal for Oceanic applications Safety approach and preliminary issues Invite Forum participants to express concerns, ideas, wishes, expectations and suggestions with the clear goal of contributing to the development of ASSTAR and the ASAS themes covered Identify any key questions still to be addressed to secure the support of the major stakeholders Establish any technical changes required to be evaluated for inclusion in the on-going studies, in order to improve the quality and acceptability of the ASSTAR results ASSTAR User Forum #1 in Rome, 4th April 2006