Download presentation
Presentation is loading. Please wait.
1
Corrective Action Log Training
2
Open the appropriate Line
Corrective Action Log Open the appropriate Line Classified - Unclassified
3
Classified - Unclassified
Corrective Action Log Some of the Columns use pulldown selections. The Plant determines the values by placing the values in the appropriate tab Classified - Unclassified
4
Meeting Type will be 4hr and 24hr.
Corrective Action Log Meeting Type Meeting Type will be 4hr and 24hr. Classified - Unclassified
5
Operations Personnel to be filled in by plant
Corrective Action Log Operations Filling in the names on this tab “Links” to the Pulldown menu on the “Line##” sheet Operations Personnel to be filled in by plant Classified - Unclassified
6
Maintenance Personnel to be filled in by plant
Corrective Action Log Maintenance Filling in the names on this tab “Links” to the Pulldown menu on the “Line##” sheet Maintenance Personnel to be filled in by plant Classified - Unclassified
7
Machines By Line to be filled in by plant
Corrective Action Log Machine Go to the Line Layout screen to get the correct equipment names. I.E. Packer 3 = Mead, etc.. Once the machines are entered on this tab, they “Link” to the Pulldown menu on the “Line##” sheet Machines By Line to be filled in by plant Classified - Unclassified
8
Target Types are Filled in Plant can add additional?
Corrective Action Log Target Type Target Types are Filled in Plant can add additional? Classified - Unclassified
9
People Responsible for Action Items are Filled in by Plant
Corrective Action Log Responsible Party Typically the people who would be responsible are “cut and pasted” from Operations and Maint sheet. People Responsible for Action Items are Filled in by Plant Classified - Unclassified
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.