Fans & Heaters technical seminar
Howden APH field services Henry Castro
2
Improve Your Plant Reliability and Availability
1 Introduction to Howden field services 2 Air Pre-heater description 3 Air Pre-heater operation and maintenance 4 Air Pre-heater retrofit works 5 Best practice 6 What is next? Challenge Howden
3
Introduction to Howden Field Services
Responsibilities and contributions Provide technical support to the day to day needs of plant personnel for the optimum operation and adequate maintenance of their equipment Provide guidance in programming of activities and supervision of works on air heaters maintenance Help with the implementation of industry proven improvements and best practices which are suitable to individual clients need Assure on site health and safety policy: Howden developed a Heater Rotation Procedure which emphasizes the personnel safety inside the APH
4
Air Pre-heater description
5
APH description Typical power plant schematic Air Preheater
Gas-Gas Heater
6
APH description Rotating matrix (LJUNGSTROM)
Rotating and stationary matrix APH Rotating matrix (LJUNGSTROM) Stationary matrix (ROTHEMUHLE) Typical Rotating Matrix Air Preheater Typical Stationary Matrix Air Preheater
7
Top Connecting Flanges Bottom Connecting Flanges
APH Description Rotating Matrix Major Components Radial Seals Top Drive Unit Rotor Heating Elements Top Access Door Rotor Casing Guide Bearing Top Connecting Flanges End Pillars Axial Sealing Bottom Connecting Flanges Bottom Access Door Circumferential Seals
8
APH Description Commonly known as ROTHEMULHE
Stationary Matrix Major Components Commonly known as ROTHEMULHE
9
APH operation and maintenance
10
APH operation and maintenance
Operation checklist Typical operation checklist on Air Heater Temperatures Check that the incoming and outgoing air and gas temperatures are within the design values Check the Combined Cold End Temperature (CCET) is within the minimum required value Check the soot blower steam (if applicable) temperature is within the minimum required value Check the bearings and drive unit lube oil temperature are within the permitted level Pressures Check that the incoming and outgoing air and gas pressures are within the design values Check that the differential pressures across the equipment are within the permitted level. Others Check for the air leakage by monitoring the O2 and/or CO2 level upstream and downstream of the equipment Check for rotor seals rubbing, especially after replacement of seals Check for air/gas leakage on shaft packings Check for oil level on bearings and drive unit gear boxes.
11
APH operation and maintenance
Maintenance checklist Typical list of maintenance work on Air Heater Replacement of Heating Element Replacement of rotor seals Overhauling of the soot blowers Overhauling or replacement of rotor support and guide bearing Overhauling or replacement of the drive unit General repair works on rotor, housing, and transition ducts Repair or replacement of the sector plates Repair or replacement of the sector plate static seals Repair or replacement of the axial plates Repair or replacement of the expansion joints Dry test of the fire protection and detection system
12
Basket replacement
13
Replacement of cold end baskets from the lateral side of the rotor
Basket replacement Vertical shaft heater Replacement of cold end baskets from the lateral side of the rotor Replacement of hot and intermediate baskets from the upper end of the rotor
14
Basket replacement Horizontal shaft APH Replacement of hot and intermediate end baskets from the lateral side Replacement of sector baskets from the top end side of the APH
15
Horizontal shaft APHs Points to consider It must lock the rotor every time it is at a rest position to avoid possibility of movement due to imbalance. It is also recommended to install a provisional locking device in addition to the brake in the drive unit for additional safety measure. Replacement of the baskets should be done in a sequence where rotor imbalance is minimized to one sector. Rotor balancing should be conducted after completion of baskets replacement. Drive unit equipped with break assembly Rotor Additional Blocking
16
Horizontal APH Installation of balancing plates
Balancing plates welded on the rotor shell after completion of baskets replacement
17
Seals replacement
18
Seals replacement Wireless seal plates levelness measuring device Howden developed a unique wireless laser measuring tool for a very precise measurement of the sealing plates, which results in an accurate and efficient setting of the rotor seals.
19
Seals replacement Radial seals
20
Outer circumferential seals
Seals replacement Outer circumferential seals Replacement of Lower Outer Circumferential Seals Replacement of Upper Outer Circumferential Seals
21
Inner circumferential seals
Seals replacement Inner circumferential seals Replacement of upper inner circumferential seals Replacement of lower inner circumferential seals
22
Seals replacement Axial seals
23
Seals setting chart and rotor reformation
Seals replacement Seals setting chart and rotor reformation
24
APH retrofit works
25
Complete rotor replacement and conversion to double sealing
APH retrofit works Complete rotor replacement and conversion to double sealing
26
APH retrofit works Replacement of the rotor bottom section and installation of new heating elements
27
APH retrofit works Complete replacement of the cold end side of a GGH for corrosion Issues
28
Replacement of the rotor due to fire incidence
APH retrofit works Replacement of the rotor due to fire incidence
29
Installation of new jet blowers
APH retrofit works Installation of new jet blowers
30
Installation of new fire detection and extinction system
APH retrofit works Installation of new fire detection and extinction system
31
Best practice
32
Best practice For optimum sealing, verify the actual combined deformation of the rotor and the stationary components at unit full load. Set the rotor seals against these values. Always verify soot blowing steam quality, ascertain that pressure and temperature are within the recommended values and that the condensate drains are functioning well. Use health checks as preventive maintenance where comprehensive inspection reports are submitted and discussed with plant personnel. Ask for support from Howden experienced personnel. Our Service Technical Advisors have worked in more than 100 plants in 30 different country all over the world.
33
What can Howden do for you next?
What next? Challenge Howden What can Howden do for you next? Outage Planning? Product Training? Spare Parts Audit? Maintenance Planning and Advice? Product Performance Analysis? Challenge Howden
34
Our experience at your service Thank you for your time