1 Kyosuke Fukuhara City of Yokohama
A Renovation Project for a Centralized Sewage Sludge Treatment Plant Including Transfer of Existing Facility O&M, Using a PFI Scheme Kyosuke Fukuhara City of Yokohama

2 Contents Outline of Yokohama and its wastewater treatment system
Renovation of the incineration facilities at the Hokubu Sludge Treatment Plant Description of the PFI project Issues for the future

3 City of Yokohama City Information Land Area 435 km2 Population
Tokyo 30 km Yokohama Tokyo Bay City Information Land Area 435 km2 Population 3.7 million

4 The State of Wastewater Treatment in Yokohama
Wastewater Treatment Plant Sludge Treatment Center Pumping Station Item Value Sewerage Service Rate 99.9% Treated Wastewater 1.6mil.m3/day Treatment zones 9 zones Wastewater Treatment Plant 11 places Sludge Treatment Center 2 places Pumping Station 26 places Total Sewer Length 11,800 km Tokyo Bay

5 Sludge Treatment Plants
Hokubu II WTP Sakae II WTP Tsuzuki WTP Kohoku WTP Kanagawa WTP Kanazawa WTP Nambu STC Chubu WTP Nanbu WTP Seibu WTP Sakae I WTP Pumping Station Tokyo Bay Item Value Average wastewater inflow 1.6 million m3/day Residuals intake at sludge treatment plants 15,000 m3/day Hokubu Ⅰ WTP Hokubu STC   Sludge Pipeline   Wastewater Treatment Plant Sludge Treatment Center

6 Process of Sludge Treatment
Digestion Gas Digestion Incineration Dewatering Thickening

7 Incineration Facilities at the Hokubu Sludge Treatment Plant (existing)
No.3 incinerator No.4 incinerator *PFI  Private  Finance  Initiative No.5 incinerator

8 Incineration Facilities at the Hokubu Sludge Treatment Plant (after renovation)

9 Data on Incineration Capacity
After renovation based on the PFI project Existing Incineration volume Start of operation Operating status No. 1 100 t/day 1981 Application filed for decommissioning No. 2 1985 No. 3 150 t/day 1987 In operation No. 4 1989 No. 5 200 t/day 2007 Treatment volume Start of operation Operating status Bio-charcoal production facilities 200 t/day 2019 In operation New No. 1 2020 No. 4 150 t/day 1989 Out of operation No. 5 2007

10 Outline of the PFI Project
Name Project for sewage sludge treatment and effective use at the City of Yokohama Hokubu Sludge Treatment Plant Method Build, transfer, and operate (BTO) method / hybrid type Period August 2016 – March 2039 Design & construction period: 5 years & 8 months Operation & maintenance period: 22 years     (beginning with the existing facilities in April 2017) Operator Yokohama Bay Link Corporation Cost 41,864,793,000 yen VFM: 6.1%

11 PFI Project Schedule FY Facility name 2016 2017 2018 2019 2020 2021
・・・ 2038 Existing Nos. 1 and 2 incinerators Removal New Bio-charcoal production facilities Construction Maintenance No. 3 incinerator New No. 1 incinerator No. 4 incinerator Shutdown No. 5 incinerator Soil improvement plant Separate management New soil improvement plant

12 Outline of the Bio-Charcoal Production Facilities
Combustion exhaust gas Dewatered residuals Drier exhaust gas Steam Residuals measurement hopper Wet electrostatic precipitator Dry scrubber Smoke treatment tower Fuel Recombustion furnace Waste heat boiler Pyrolysis gas Residuals feed pump Carbonizing furnace Stabilization hopper Residuals drier Carbide humidifier Bio-charcoal hopper Hot-blast furnace for carbonization Bio-charcoal

13 Conceptual Image of Bio-Charcoal Production Facilities When Completed

14 Outline of the New No. 1 Incinerator
Primary air preheater Waste heat boiler Atmosphere Treated wastewater Primary air blower Ceramic filter Exhaust pipe Residuals Cyclone Fixed quantity feeder Induced draft fan Drier Cake transportation pump Ash hopper Secondary air preheater Secondary air blower Auxiliary burner Incinerator Improved soil Auxiliary fuel Wastewater

15 Conceptual Image of the New No. 1 Incinerator When Completed

16 Outline of the Soil Improvement Plant
Unslaked lime hopper Incineration ash hopper Residual soil from construction sites Picking conveyor (with magnetic sorter) Hopper for residual soil Secondary mixer Primary mixer Residual soil conveyor Sorter for residual soil Primary classifier Secondary classifier Unsuitable items: Asphalt debris Concrete debris Natural stone, etc. Unsuitable items: Metal Plastic, etc. Unsuitable items Particle diameter of 40 mm or more Improved soil (granule diameter of 20 – 0 mm) Improved soil (granule diameter of 40 – 0 mm)

17 Conceptual Image of the Soil Improvement Plant When Completed

18 Project Scheme Yokohama Bay Link Corporation Project contract
(PFI operator) Project contract City of Yokohama Facility use agreement Project monitoring Procurement of funds Facility design, construction, and operation Fuel production facilities Dewatering unit Incineration facilities Digestion tank Residuals cake Digested sludge Payment of fee for service purchase Incineration ash Fuel produced (bio-charcoal) Storage hopper Soil improvement plant Sewage sludge Fuel produced (sale to businesses) Payment of fee for sale Payment of fee for sale Improved soil Wastewater treatment centers Improved soil user Facilities making effective use of the fuel

19 Issues for the Future Simultaneous and parallel work – facility dismantling, construction, and management Related laws and ordinances Transfer of work to successors

20 Nocturnal View of Yokohama Harbor