Download presentation
Presentation is loading. Please wait.
1
802.15 Liaison Report Date: 2012-11-16 Authors: November 2012
November 2012January 2009September 2008 January 2009September 2008 September 2008 doc.: IEEE /xxxxr0 November 2012 Liaison Report Date: Authors: Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics
2
Abstract Liaison report on 802.15 as presented to 802.11 November 2012
September 2008 January 2009September 2008 November 2012January 2009September 2008 doc.: IEEE /xxxxr0 November 2012 Abstract Liaison report on as presented to Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics
3
September 2008 November 2012January 2009September 2008 May 2008 January 2009September 2008 doc.: IEEE /0697r0 doc.: IEEE /xxxxr0 November 2012 Slide 3 Slide 3 Clint Chaplin, Samsung Electronics Page 3 Page 3 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
4
September 2008 May 2008 November 2012January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2012 j MBAN First Sponsor ballot on IEEE j D4.0 closed November 11, Results: 73/0/ % 16 comments received: 3 technical, 12 editorial, 1 general All comments resolved: recirculation already started Will ask 802 EC for conditional approval to go to Standards Board for final approval Slide 4 Slide 4 Clint Chaplin, Samsung Electronics Page 4 Page 4 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
5
802.15.4k Low Energy Critical Infrastructure Monitoring (LECIM)
September 2008 May 2008 November 2012January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2012 k Low Energy Critical Infrastructure Monitoring (LECIM) First Recirculation WG ballot LB85 on IEEE k D2.0 closed October 24, Results: 90/7/ % 98 comments received (did not ask voter to categorize comments into T/E/G) Resolved all of the comments Recirculation will start soon. Will ask 802 EC for conditional approval to go to Sponsor ballot Slide 5 Slide 5 Clint Chaplin, Samsung Electronics Page 5 Page 5 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
6
802.15.4m TV White Space Reviewed the preliminary draft document
September 2008 May 2008 November 2012January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2012 m TV White Space Reviewed the preliminary draft document Discussion and resolutions on issues, concerns, and TBDs in preliminary draft document Assign people to complete TBDs before January meeting Hear and discussion of contributor’s presentations for TVWS regulation Discussed future efforts and next steps Editors will take TBDs by December 7, 2012. The draft document should be provided prior to the January meeting week Slide 6 Slide 6 Clint Chaplin, Samsung Electronics Page 6 Page 6 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
7
802.15.4n Chinese Medical Band Heard Applications Presentations
September 2008 May 2008 November 2012January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2012 n Chinese Medical Band Heard Applications Presentations IMEC-NL Heard Proposals Presentations n-dual-band-dsss-phy-proposal-for-ieee n n-tamed-spread-spectrum-proposal-for-ieee n n-technical-proposal-for-wearable-15-4n-device n-fsk-phy-proposal-for-tg4n n-ranging-with-MBAN-narrow-band-phy Will continue call for proposals Slide 7 Slide 7 Clint Chaplin, Samsung Electronics Page 7 Page 7 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
8
802.15.4p Positive Train Control
September 2008 May 2008 November 2012January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2012 p Positive Train Control Continued to draft baseline proposal text to reflect the technical proposals presented; planned to finish in January Slide 8 Slide 8 Clint Chaplin, Samsung Electronics Page 8 Page 8 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
9
802.15.8 Peer Aware Communications
September 2008 May 2008 November 2012January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2012 Peer Aware Communications 11 Presentations for Technical Guidance Document (TGD) Junhui Zhao (China Mobile): Doc. 566r0 Shannon Park (Samsung): Doc.578r0, 577r2, 645r2 Huan-Bang Li (NICT): Doc. 579r1 Marco Hernandez (NICT): Doc. 0459r1, 655r0 Seunggeun Jin (ETRI): Doc. 573r0, 572r0 Jinyoung Chun (LGE): Doc. 571r0 Cheol Ryu (ETRI): Doc. 656r2 Discussed and modified Technical Guidance Document (TGD) Doc: 645r2 Assigned champions for remaining items in TGD Expect to issue call for proposals after January meeting Expect to go out for initial WG ballot March 2014 Slide 9 Slide 9 Clint Chaplin, Samsung Electronics Page 9 Page 9 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
10
802.15.9 Key Management Protocol
September 2008 May 2008 November 2012January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2012 Key Management Protocol Worked on Information Element handling state machines Generated inbound and outbound PDU process flows Drew up a high-level system view to show how the KMP, IE shim, data higher level, and data MLME work together Discussed how other IE processes can use the IE shim state machines Slide 10 Slide 10 Clint Chaplin, Samsung Electronics Page 10 Page 10 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
11
Ultra Low Power SG Reviewed/addressed PAR and 5C comments made by EC
September 2008 May 2008 November 2012January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2012 Ultra Low Power SG Reviewed/addressed PAR and 5C comments made by EC WG moved to approve the response to EC Heard 4 presentations Call for applications will be issued once the TG ( q) is officially approved. Slide 11 Slide 11 Clint Chaplin, Samsung Electronics Page 11 Page 11 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
12
Better Use of Spectrum Resources in WPANs IG
September 2008 May 2008 November 2012January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2012 Better Use of Spectrum Resources in WPANs IG Technical Presentation Conceptual proposal of autonomously distributed wireless system based on dynamic multi-layer control for fair satisfaction of QoE ( r1) Slide 12 Slide 12 Clint Chaplin, Samsung Electronics Page 12 Page 12 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
13
THz IG November 2012 Presentations Discussions September 2008 May 2008
November 2012January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2012 THz IG Presentations Contribution #1 : Eshan Afshari, Cornell University (USA), “The Next Frontier for Circuit Designers: CMOS THz Systems”; (Document thz) Contribution #2 : Josep Miguel Jornet, Georgia Tech (USA), “Design of Graphene-based Nano-antennas for Terahertz Band Communication”; (Document thz) Contribution #3 : Chong Han (Georgia Tech), “Statistical Multi-path Propagation Modeling and Fading Analysis in Terahertz Band Communication Networks”; (Document thz) Contribution #4 : Thomas Kürner, TU Braunschweig (Germany), “Presentation on Spectrum Issues at THz Frequencies to IEEE ”; (Document thz) Contribution #5 : Michael Grigat , Deutsche Telekom (Germany), “Link Budget Analysis for Terahertz Fixed Wireless Links”; (Document thz) Contribution #6 : Thomas Kürner, TU Braunschweig (Germany),Davit Britz (AT&T Shannon Labs), Katsuhiro Ajito (NTT Corp.), Iwao Hosako (NICT); “Discussion document on next steps for creating a standard on THz Communications”; (Document thz) Discussions Update of the Technical Expectations Document (11/0745r6) Discussion on the future of IG THz Identified possible application for standardisation: Ultra-High Speed Wireless Connection in Data Centers (Server Farms) Next steps: Generating interest by manufacturers (Questionnaire?) Investigating MAC issues Informal presnentation to WNG at the March meeting Slide 13 Slide 13 Clint Chaplin, Samsung Electronics Page 13 Page 13 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
14
L2R IG Tutorial on Monday evening Asking to form Study Group
September 2008 May 2008 November 2012January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2012 L2R IG Tutorial on Monday evening Asking to form Study Group Slide 14 Slide 14 Clint Chaplin, Samsung Electronics Page 14 Page 14 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
15
WNG SC No presentations November 2012 September 2008 May 2008
November 2012January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2012 WNG SC No presentations Slide 15 Slide 15 Clint Chaplin, Samsung Electronics Page 15 Page 15 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
16
Maintenance SC Reviewed three submissions
September 2008 May 2008 November 2012January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2012 Maintenance SC Reviewed three submissions Considered any other business: submission indicating an error in a security clause of IEEE Question from ETSI TG28 on IEEE e information element ID assignments Asking for a corregendum PAR to fix issues identified with Slide 16 Slide 16 Clint Chaplin, Samsung Electronics Page 16 Page 16 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
17
References This document All Documents
September 2008 May 2008 November 2012January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 November 2012 References This document All Documents Current draft is in the members-only area Members_Only_Area members log in using username and password Slide 17 Clint Chaplin, Samsung Electronics Page 17 Clint Chaplin, Samsung Clint Chaplin, Samsung Electronics
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.